Kerala Water Authority invites bids for Jal Jeevan Phase 2
WATER & WASTE

Kerala Water Authority invites bids for Jal Jeevan Phase 2

Chief Engineer Northern Region, Kozhikkode & Superintending Engineer (PH Circle Kozhikode) on behalf of Kerala Water Authority has released a tender for Jal Jeevan Mission-Phase 2- CWSS to Moopainad Meppadi and Vythiri Panchayaths in Wayanad Supply, Laying, Testing and Commissioning of Distribution pipeline and Providing FHTC in Meppadi Panchayath.

The detailed scope of work includes the Design, Construction, Testing, and Commissioning of 9 LL Capacity GLSR at Britishkunnu, 5 LL Capacity Booster station cum 9 LL Capacity OHSR at Nedumbala in Meppadi Panchayath Supply, Laying Testing and commissioning of Clearwater Pumping main and gravity main, from WTP to Nedumbala, from Nedumbala to British Kunnu And from British kunnu to Chelode estate, Supply, erection and commissioning of 500 KVA transformer and clear water pump sets at Nedumbala-General Civil under Jal Jeevan Mission (JJM)-JJM-Phase 2 CWSS to Moopainad, Meppadi and Vythiri Panchayaths in Wayanad District Phase II--Supply, Laying, Testing and Commissioning of Distribution pipeline and Providing FHTC in Meppadi Panchayath.

The tender seeks civil works- others worth Rs 84,30,84,842 to be completed in 395 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period will start on May 26, 2023, and will end on June 5, 2023.

A Pre-Bid meeting shall take place at the following date, time, and place: Superintending Engineer, PH Circle, KWA, Malaparamba, Kozhikode 09

Date: 25-May-2023 Time: 12:30 PM

Essential details:

Project Estimated Value: ₹ 84,30,84,842
Product Category: Civil works- others
Bid Validity (Days): 120
Period of Work: 395 days
Tender ID - 2023_KWA_577109_1
Tender Ref. No.: SE/PHC/KKD/18/2023-24
Payment mode: Online
Form of contract: Item Rate

Chief Engineer Northern Region, Kozhikkode & Superintending Engineer (PH Circle Kozhikode) on behalf of Kerala Water Authority has released a tender for Jal Jeevan Mission-Phase 2- CWSS to Moopainad Meppadi and Vythiri Panchayaths in Wayanad Supply, Laying, Testing and Commissioning of Distribution pipeline and Providing FHTC in Meppadi Panchayath. The detailed scope of work includes the Design, Construction, Testing, and Commissioning of 9 LL Capacity GLSR at Britishkunnu, 5 LL Capacity Booster station cum 9 LL Capacity OHSR at Nedumbala in Meppadi Panchayath Supply, Laying Testing and commissioning of Clearwater Pumping main and gravity main, from WTP to Nedumbala, from Nedumbala to British Kunnu And from British kunnu to Chelode estate, Supply, erection and commissioning of 500 KVA transformer and clear water pump sets at Nedumbala-General Civil under Jal Jeevan Mission (JJM)-JJM-Phase 2 CWSS to Moopainad, Meppadi and Vythiri Panchayaths in Wayanad District Phase II--Supply, Laying, Testing and Commissioning of Distribution pipeline and Providing FHTC in Meppadi Panchayath. The tender seeks civil works- others worth Rs 84,30,84,842 to be completed in 395 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period will start on May 26, 2023, and will end on June 5, 2023. A Pre-Bid meeting shall take place at the following date, time, and place: Superintending Engineer, PH Circle, KWA, Malaparamba, Kozhikode 09 Date: 25-May-2023 Time: 12:30 PM Essential details: Project Estimated Value: ₹ 84,30,84,842 Product Category: Civil works- others Bid Validity (Days): 120 Period of Work: 395 days Tender ID - 2023_KWA_577109_1 Tender Ref. No.: SE/PHC/KKD/18/2023-24 Payment mode: Online Form of contract: Item Rate

Next Story
Resources

KEC International Wins New Orders worth Rs. 12.36 Billion

KEC International, a global infrastructure EPC major and an RPG Group Company, has secured new orders worth Rs. 12.36 billion (bn) across various sectors.Transmission & Distribution (T&D):KEC has secured transmission line and substation orders in the Middle East (UAE and Kuwait) and a substation order from a private TBCB player in India.Civil:A residential project order from a leading private developer in Western India strengthens KEC’s presence in the civil sector.Transportation:The company has also secured an order in the prestigious Train Collision Avoidance System (TCAS) segment ..

Next Story
Infrastructure Urban

Finance Minister to Launch NITI NCAER States Economic Forum Portal

Union Finance Minister Nirmala Sitharaman is set to launch the "NITI NCAER States Economic Forum" portal on 1st April 2025 in New Delhi. Developed collaboratively by NITI Aayog and the National Council of Applied Economic Research (NCAER), the portal will serve as a comprehensive repository of economic, social, and fiscal data spanning over 30 years (1990-91 to 2022-23). Key Features of the Portal The platform is structured into four main components: State Reports: Provides macro and fiscal overviews of 28 Indian states, featuring data on demography, economic structure, socio-economic indic..

Next Story
Infrastructure Energy

IREDA’s Loan Sanctions Surge 27% to Rs 474.53 Bn in FY 2024-25

The Indian Renewable Energy Development Agency Limited (IREDA) has reported a 27% increase in loan sanctions, reaching Rs 474.53 billion for FY 2024-25, as per provisional data. Loan disbursements also saw a 20% rise to Rs 301.68 billion, up from Rs 250.89 billion in the previous fiscal year. Additionally, the outstanding loan book expanded by 28%, standing at Rs 762.5 billion as of March 31, 2025, compared to Rs 596.98 billion in FY 2023-24. IREDA’s Commitment to Renewable Energy Growth Shri Pradip Kumar Das, Chairman & Managing Director, IREDA, emphasized the company’s commitment to t..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?