BMC invites bids for constructing pumping station at Mahul
WATER & WASTE

BMC invites bids for constructing pumping station at Mahul

The Brihanmumbai Municipal Corporation (BMC) has started the process of selecting an agency for the installation of the city’s eighth stormwater drain pumping station at Mahul.

The project cost will approximately be Rs 350 crore. On Thursday, the civic organisation invited bids for the design and development of the Mahul Pumping station. Recently, the Improvement Committee had sanctioned a bid for a land exchange between BMC and a private developer for the project.

The project had been pending for many years since the earlier site decided for the development of the pumping station was under the jurisdiction of the Salt Commissioner. Despite many requests, they had denied handing over the land.

The project is essential as the BMC expects that once the plants are installed, the flooding in places like Gandhi Market, Sion, Kings Circle, Kurla during the rainy season can be stopped. As per the proposal documents, the appointed contractor will have to design, build and maintain the plant.

In July, the BMC had already granted a contract for the construction of another pumping station in Mogra, Andheri. Six pumping stations have been built in the city to handle flooding so far.

Image Source

The Brihanmumbai Municipal Corporation (BMC) has started the process of selecting an agency for the installation of the city’s eighth stormwater drain pumping station at Mahul. The project cost will approximately be Rs 350 crore. On Thursday, the civic organisation invited bids for the design and development of the Mahul Pumping station. Recently, the Improvement Committee had sanctioned a bid for a land exchange between BMC and a private developer for the project. The project had been pending for many years since the earlier site decided for the development of the pumping station was under the jurisdiction of the Salt Commissioner. Despite many requests, they had denied handing over the land. The project is essential as the BMC expects that once the plants are installed, the flooding in places like Gandhi Market, Sion, Kings Circle, Kurla during the rainy season can be stopped. As per the proposal documents, the appointed contractor will have to design, build and maintain the plant. In July, the BMC had already granted a contract for the construction of another pumping station in Mogra, Andheri. Six pumping stations have been built in the city to handle flooding so far. Image Source

Next Story
Resources

Madhya Pradesh Champions Inclusive Tourism at Heritage Sites

On the occasion of World Heritage Day, Madhya Pradesh is taking a significant step toward inclusive tourism by making its historical sites accessible to all — especially persons with disabilities. The state is rolling out its ‘Accessibility Infrastructure and Development’ project at Maheshwar, Mandu, Dhar, and Orchha, aiming to create a more welcoming experience at these iconic cultural destinations.The initiative, under the leadership of Chief Minister Dr Mohan Yadav and Tourism Minister Shri Dharmendra Bhav Singh Lodhi, includes infrastructure upgrades such as ramps, Braille signage, w..

Next Story
Resources

Runwal Realty Onboards Sonam Kapoor as Brand Ambassador

Real estate major Runwal has unveiled a refreshed identity as Runwal Realty, signalling a renewed commitment to crafting spaces that stand the test of time. With this refresh, the brand unveils its new philosophy: “Building for Generations to Come” and welcomes Bollywood star and global fashion icon Sonam Kapoor as its brand ambassador. This evolved identity reflects Runwal Realty’s commitment to creating not just homes, but heirlooms—crafted through visionary design, meticulous planning, global design expertise and an unwavering focus on quality. With the customer at its core, each de..

Next Story
Infrastructure Urban

Emerging Trends in Infrastructure and Transport 2025: KPMG

KPMG’s latest report, The Great Reset: Emerging Trends in Infrastructure and Transport 2025 edition, sheds light on the profound changes transforming the global infrastructure landscape. As industries adapt to the challenges posed by climate change, economic pressures, and technological advancements, the report identifies key trends and provides actionable insights for leaders in infrastructure and transport sectors. “In today’s interconnected world, the lack of standardized supply chain practices is not just an operational challenge—it’s an environmental and economic one. We’..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?