Godrej Korber bags order for setting up warehouse in Uttar Pradesh
WAREHOUSING & LOGISTICS

Godrej Korber bags order for setting up warehouse in Uttar Pradesh

Godrej & Boyce has declared that its Joint Venture (JV), Godrej Korber, has received a large order from a paint manufacturer for setting up an automated warehouse in Uttar Pradesh.

This order follows the company's strengthening of its partnership with Korber AG, a German company, to bring together an unrivalled depth and breadth of technologies and expertise to overcome supply chain complexity.

According to a report by Research And Markets, India's warehousing market will be worth Rs 1,050 billion in 2020.

Between 2021 and 2025, this is expected to grow at a CAGR of 14.86%.

The new project will help the company manage the movement and storage of 15,000 tonnes of decorative and industrial paints produced in Sandila, Uttar Pradesh, in a more efficient manner. For seamless operations, the system is managed by a warehouse management system (WMS) that is linked to the client's ERP (Oracle).

The proposed system includes double deep linear stacker cranes, 15,000+ storage locations within the facility connected by input or output conveyors, and auto lifts bridging the manufacturing and warehouse connections.

Naresh Tahiliani, sr VP and business head, Godrej Korber told the media that Partnership with Korber has helped to extend the solutions across the supply chain by integrating the best-in-class technologies available with partners. The warehouse automation market in India is expected to grow at a CAGR of 14% to 20% over the next three to five years, according to estimates, and Godrej Korber aims to grow at a CAGR of greater than 25% over the next three years.

Godrej Korber Supply Chain Limited is a pioneer and market leader in India, providing automated solutions for inventory storage, movement, and handling in the Manufacturing and Distribution sector. Korber AG, a European leader in supply chain solutions and Godrej & Boyce Mfg Co Ltd, a leading engineering conglomerate, collaborated to achieve leadership status.

Image Source


Also read: Warehouse and logistics hub could be set up near Jewar Airport

Godrej & Boyce has declared that its Joint Venture (JV), Godrej Korber, has received a large order from a paint manufacturer for setting up an automated warehouse in Uttar Pradesh. This order follows the company's strengthening of its partnership with Korber AG, a German company, to bring together an unrivalled depth and breadth of technologies and expertise to overcome supply chain complexity. According to a report by Research And Markets, India's warehousing market will be worth Rs 1,050 billion in 2020. Between 2021 and 2025, this is expected to grow at a CAGR of 14.86%. The new project will help the company manage the movement and storage of 15,000 tonnes of decorative and industrial paints produced in Sandila, Uttar Pradesh, in a more efficient manner. For seamless operations, the system is managed by a warehouse management system (WMS) that is linked to the client's ERP (Oracle). The proposed system includes double deep linear stacker cranes, 15,000+ storage locations within the facility connected by input or output conveyors, and auto lifts bridging the manufacturing and warehouse connections. Naresh Tahiliani, sr VP and business head, Godrej Korber told the media that Partnership with Korber has helped to extend the solutions across the supply chain by integrating the best-in-class technologies available with partners. The warehouse automation market in India is expected to grow at a CAGR of 14% to 20% over the next three to five years, according to estimates, and Godrej Korber aims to grow at a CAGR of greater than 25% over the next three years. Godrej Korber Supply Chain Limited is a pioneer and market leader in India, providing automated solutions for inventory storage, movement, and handling in the Manufacturing and Distribution sector. Korber AG, a European leader in supply chain solutions and Godrej & Boyce Mfg Co Ltd, a leading engineering conglomerate, collaborated to achieve leadership status. Image Source Also read: Warehouse and logistics hub could be set up near Jewar Airport

Next Story
Real Estate

Pune Records 11% Drop in Property Registrations in Nov

Property registrations in Pune saw a decline of 11 percent year-on-year in November, totaling 13,371 units, despite robust demand, according to a report by Knight Frank India. The real estate consultancy revealed that the total registrations in November 2024 generated a revenue of Rs 475 crore for the state. This marked a fall from last year's figure of 14,988 units in the same month. Compared to October 2024, when 20,894 units were registered, November’s figures represent a 36 percent decrease. Shishir Baijal, Chairman and Managing Director of Knight Frank India, stated that Pune’s proper..

Next Story
Infrastructure Energy

Oriana Power Signs MoU with Rajasthan in Clean Energy

Oriana Power, a publicly-listed company on the NSE, announced on Monday that it has entered into a Memorandum of Understanding (MoU) with the Rajasthan government to invest Rs 10,000 crore in a series of clean energy projects. The projects will focus on solar energy, floating solar, green hydrogen, and energy storage solutions. The agreement was finalized in Jaipur during the recently concluded Rising Rajasthan Global Summit 2024. Oriana Power has identified six key locations in the state for these projects, including one in Bikaner, two in Churu, and three in Phalodi districts. Rupal Gupta, M..

Next Story
Infrastructure Energy

PM Surya Ghar Scheme Set to Surpass 10 Years of Solar Growth

The PM Surya Ghar Muft Bijli Yojana has achieved a remarkable milestone, surpassing 6.85 lakh solar installations within a year and poised to exceed a decade's worth of solar growth. The scheme, launched in February 2024, has already achieved 86 percent of the solar installations made in the last ten years. The 3-5 kW segment accounted for the majority of installations, at 77 percent, while 14 percent of installations were in the 5kW+ category. Gujarat led the charge with 2,86,545 installations, followed by Maharashtra with 1,26,344, Uttar Pradesh with 53,423, and Kerala. The scheme, which now..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000