Bhagalpur civic body prepares to build smart streets
SMART CITIES

Bhagalpur civic body prepares to build smart streets

The Bhagalpur Municipal Corporation (BMC) has proposed new guidelines for road repair and maintenance of the town area. The civic body says that in the first phase, 18 roads, having 11.41km length will be restructured and modernized.

Civic body sources also added that plans are afoot under Smart City projects to build swanky pedestrian footpaths, landscaping, sewage and drainage system, underground water supply pipelines, utility ducts, night lighting, constructing vending zones, zebra crossings, cycling tracks, etc, besides underpass for crossing the roads wherever there will be enough space. Re- engineering of the roads will also be done wherever required.

The roads to be restructured and given smarter looks include Lajpat Park roads (635 m), Zila School road (440 m), Naya Bazar-Kotwali chowk (500 m), Shanker Talkies-Khalifabagh (830 m), Kutchery Chowk – Manali Chowk (540 m), Radha Rani Sinha Road (750 m), Adampur chowk- Hotel Galaxy-Manali Chowk (1100 m), Naya Bazar – Shanker Talkies – Adampur (1460 m), Adampur–Manali Chowk–Tilkamanjhi Chowk (1600 m), Manik Sarkar chowk – Ghanta Ghar chowk (600 m), Kotwali Chowk – Khalifabagh Chowk – Ghanta Ghar Chowk (980 m) and Ghata Ghar Chowk – Kutchery Chowk – Tilkamanjhi Chowk (1980 m).

BMC commissioner ( in-charge) Satyendra Verma said drawing and design besides the bidding process for restructuring of roads are in the final stages. “Work for a model road will start at first as a pilot project, followed by work on 17 other roads. Coordination with the road construction department (RCD) and other departments concerned will be made for remodeling of the roads to allow hassle-free movement of traffic and pedestrians,” he added.

Bhagalpur was selected under the ‘Smart Cities Mission’, a central government-sponsored scheme launched in June 2015, in the second list for smart cities in May 2016. The central government had proposed to spend Rs 80,789 crore over five financial years (FY) starting from FY 2015-2016 with a plan outlay of Rs 100 crore on an average per year for the city’s development and an equal amount (on a matching basis) to be contributed by the state.

BMC deputy mayor Rajesh Verma said the cost for remodeling and restructuring city streets under the smart city project would entail an estimated outlay of Rs 300 crore. “The project tender has already been finalized and work is likely to start soon,” the deputy mayor said.

The Bhagalpur Municipal Corporation (BMC) has proposed new guidelines for road repair and maintenance of the town area. The civic body says that in the first phase, 18 roads, having 11.41km length will be restructured and modernized.Civic body sources also added that plans are afoot under Smart City projects to build swanky pedestrian footpaths, landscaping, sewage and drainage system, underground water supply pipelines, utility ducts, night lighting, constructing vending zones, zebra crossings, cycling tracks, etc, besides underpass for crossing the roads wherever there will be enough space. Re- engineering of the roads will also be done wherever required.The roads to be restructured and given smarter looks include Lajpat Park roads (635 m), Zila School road (440 m), Naya Bazar-Kotwali chowk (500 m), Shanker Talkies-Khalifabagh (830 m), Kutchery Chowk – Manali Chowk (540 m), Radha Rani Sinha Road (750 m), Adampur chowk- Hotel Galaxy-Manali Chowk (1100 m), Naya Bazar – Shanker Talkies – Adampur (1460 m), Adampur–Manali Chowk–Tilkamanjhi Chowk (1600 m), Manik Sarkar chowk – Ghanta Ghar chowk (600 m), Kotwali Chowk – Khalifabagh Chowk – Ghanta Ghar Chowk (980 m) and Ghata Ghar Chowk – Kutchery Chowk – Tilkamanjhi Chowk (1980 m).BMC commissioner ( in-charge) Satyendra Verma said drawing and design besides the bidding process for restructuring of roads are in the final stages. “Work for a model road will start at first as a pilot project, followed by work on 17 other roads. Coordination with the road construction department (RCD) and other departments concerned will be made for remodeling of the roads to allow hassle-free movement of traffic and pedestrians,” he added.Bhagalpur was selected under the ‘Smart Cities Mission’, a central government-sponsored scheme launched in June 2015, in the second list for smart cities in May 2016. The central government had proposed to spend Rs 80,789 crore over five financial years (FY) starting from FY 2015-2016 with a plan outlay of Rs 100 crore on an average per year for the city’s development and an equal amount (on a matching basis) to be contributed by the state.BMC deputy mayor Rajesh Verma said the cost for remodeling and restructuring city streets under the smart city project would entail an estimated outlay of Rs 300 crore. “The project tender has already been finalized and work is likely to start soon,” the deputy mayor said.

Next Story
Infrastructure Energy

REC Transfers HVDC Project to Power Grid

REC Limited has successfully handed over the Special Purpose Vehicle (SPV) for a High-Voltage Direct Current (HVDC) transmission project to Power Grid Corporation of India Limited (PGCIL). This strategic move aligns with the nation's objectives to strengthen its power transmission network. Key Highlights: Project Overview: The HVDC project, under the inter-state transmission system (ISTS) initiative, is a critical component of India's push toward robust and efficient electricity transmission. It aims to handle bulk power transfer across long distances while ensuring minimal losses. Role of RE..

Next Story
Infrastructure Transport

NF Railway Collaborates with IIT Guwahati

The Northeast Frontier (NF) Railway has signed strategic Memorandums of Understanding (MoUs) with IIT Guwahati to foster technological advancements and improve railway operations in the region. This partnership focuses on innovative solutions to enhance safety, efficiency, and sustainability in rail infrastructure. Key Highlights: Purpose of MoUs: The collaboration aims to leverage IIT Guwahati's expertise in technology and research for implementing cutting-edge solutions across railway operations. Key areas of focus include: Automation and digitization in maintenance. Sustainability initiati..

Next Story
Infrastructure Transport

Danapur Division Modernization Plans Revealed

The Railway Board has unveiled ambitious plans for the expansion and modernization of the Danapur Division, a critical hub under the East Central Railway. The initiative focuses on infrastructure development, enhanced passenger amenities, and operational efficiency. Key Highlights: Scope of Modernization: The Railway Board's blueprint emphasizes: Upgrading existing infrastructure to accommodate more passenger and freight traffic. Improving station facilities, such as platforms, waiting areas, and connectivity. Introducing advanced signal systems for safer and smoother operations. Freig..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000