Vande Bharat adds 4 halts on Jalna-Mum route for enhanced connectivity
RAILWAYS & METRO RAIL

Vande Bharat adds 4 halts on Jalna-Mum route for enhanced connectivity

In a strategic move to enhance regional connectivity, Vande Bharat Express is set to introduce four additional halts on its Jalna-Mumbai route. This decision aims to cater to the growing demand for improved transportation options and to strengthen accessibility for passengers along this crucial rail corridor.

The four new halts will strategically be positioned to optimize connectivity and accessibility for commuters traveling between Jalna and Mumbai. This expansion aligns with the broader vision of the railway authorities to ensure that high-speed and efficient train services are accessible to a wider population, contributing to the overall development and connectivity of the region.

The inclusion of these halts not only addresses the needs of the local population but also opens up new possibilities for tourism and business along the route. Passengers will now benefit from enhanced convenience and reduced travel times, fostering a positive impact on the socio-economic landscape of the areas served by these additional stops.

As Vande Bharat Express evolves to meet the dynamic needs of passengers, the introduction of these halts underscores a commitment to providing efficient and accessible rail services, making significant strides in advancing the connectivity and convenience of rail travel in the Jalna-Mumbai corridor.

In a strategic move to enhance regional connectivity, Vande Bharat Express is set to introduce four additional halts on its Jalna-Mumbai route. This decision aims to cater to the growing demand for improved transportation options and to strengthen accessibility for passengers along this crucial rail corridor. The four new halts will strategically be positioned to optimize connectivity and accessibility for commuters traveling between Jalna and Mumbai. This expansion aligns with the broader vision of the railway authorities to ensure that high-speed and efficient train services are accessible to a wider population, contributing to the overall development and connectivity of the region. The inclusion of these halts not only addresses the needs of the local population but also opens up new possibilities for tourism and business along the route. Passengers will now benefit from enhanced convenience and reduced travel times, fostering a positive impact on the socio-economic landscape of the areas served by these additional stops. As Vande Bharat Express evolves to meet the dynamic needs of passengers, the introduction of these halts underscores a commitment to providing efficient and accessible rail services, making significant strides in advancing the connectivity and convenience of rail travel in the Jalna-Mumbai corridor.

Next Story
Infrastructure Energy

EDF Eyes Renewable Partnerships with NTPC, CIL, and Actis

EDF India has signed non-binding term sheets with NTPC, Coal India Ltd (CIL), and global investor Actis to advance renewable energy projects in India. Under this collaboration, NTPC will develop, own, and operate pumped storage projects (PSPs), standalone hydropower, and hybrid renewable energy projects. EDF has proposed a 50:50 joint venture with NTPC and a separate JV with CIL to pursue PSPs and renewable projects in India and neighboring countries. India’s National Electricity Plan 2023 estimates a need for 74 GW/411 GWh of energy storage systems by 2031-32, including 27 GW/175 GWh from ..

Next Story
Infrastructure Energy

West Bengal Seeks O&M Bids for 1.891 MW Solar Project

The West Bengal Power Development Corporation (WBPDCL) has invited bids for the comprehensive operation and maintenance (O&M) of a 1.891 MW rooftop solar project at Kolaghat Thermal Power Station for two years. Bids must be submitted by March 29, 2025, and will be opened on April 2. An earnest money deposit of Rs 89,332 is required, and successful bidders must provide a performance bank guarantee of 10% of the contract value within 30 days of the work order issuance. If the accepted bid value is 80% or lower than the estimated value, an additional performance security of 10% is mandatory. ..

Next Story
Infrastructure Energy

EDF Eyes Renewable Partnerships with NTPC, CIL, and Actis

EDF India has signed non-binding term sheets with NTPC, Coal India Ltd (CIL), and global investor Actis to advance renewable energy projects in India. Under this collaboration, NTPC will develop, own, and operate pumped storage projects (PSPs), standalone hydropower, and hybrid renewable energy projects. EDF has proposed a 50:50 joint venture with NTPC and a separate JV with CIL to pursue PSPs and renewable projects in India and neighboring countries. India’s National Electricity Plan 2023 estimates a need for 74 GW/411 GWh of energy storage systems by 2031-32, including 27 GW/175 GWh from ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?