Track laying starts on  Mumbai-Ahmedabad HSR Corridor
RAILWAYS & METRO RAIL

Track laying starts on Mumbai-Ahmedabad HSR Corridor

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.

The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.

RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.

Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.

Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.
Redefine the future of urban mobility! Join us at the Metro Rail Conference 2025 to explore groundbreaking ideas and insights. 👉 Register today!

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Next Story
Infrastructure Energy

BrightNight Commissions 115 MW Hybrid Power Project in Maharashtra

BrightNight, a prominent global renewable energy producer, has launched the first phase of its 115 MW hybrid renewable energy project, Optima Maharashtra, in Dharashiv, located in southern Maharashtra. This marks one of the state’s pioneering co-located wind and solar projects and signifies BrightNight's inaugural energy supply to India's national power grid, furthering the nation's goal of decarbonising its energy sector. Spanning around 14,000 acres, the project integrates cutting-edge wind and solar technologies, powered by BrightNight’s proprietary AI-driven PowerAlpha® platform. The ..

Next Story
Infrastructure Energy

Maha and Rajasthan Lead Solar-Powered Agriculture Under KUSUM Programme

Maharashtra and Rajasthan are leading the way in the adoption of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) programme, specifically under Component C. This component aims to scale renewable energy infrastructure, addressing both agricultural sustainability and energy security. The two states are expected to contribute over 10 GW of solar capacity under the PM-KUSUM programme by 2025. The PM-KUSUM programme consists of three key components: small-scale solar projects (Component A), the installation of standalone solar-powered pumps (Component B), and the solarisat..

Next Story
Infrastructure Energy

Odisha Floats EPC Tender for 4 MW Solar Projects with Battery Integration

The Odisha Renewable Energy Development Agency (OREDA) has released a tender for the engineering, procurement, and construction (EPC) of 4 MW rooftop solar projects with integrated battery systems. These projects will be implemented across various locations in Odisha under a rate contract basis. Bids must be submitted by January 27, 2025, with bid opening scheduled for February 1. Bidders are required to submit a bid security of Rs 300,000 ($3,600), a bid cost of Rs 10,500 ($126), and a processing fee of Rs 1,000 ($12). The selected bidders must be responsible for designing, engineering, suppl..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000