Railways to Engage PSUs for Maintenance of New Depots and Workshops
RAILWAYS & METRO RAIL

Railways to Engage PSUs for Maintenance of New Depots and Workshops

In a bid to streamline operations and ensure the efficient maintenance of newly created railway assets, the Railway Board has decided to involve its Public Sector Undertakings (PSUs) through competitive bidding. This decision comes after challenges were reported regarding the operationalization and upkeep of newly built sheds, depots, workshops, and rolling stock.

The Railway Board has communicated that zonal Railways will be authorized to conduct limited tendering processes to select suitable PSUs for the maintenance of infrastructure. A set of 29 maintenance conditions has been outlined, covering safety audits, quality practices, and operational guidelines. Importantly, safety audits will be conducted annually, ensuring that the operations remain up to the required standards.

Despite opposition from certain railway unions, who have expressed concerns about the potential privatization of operations, the Railway Board insists that PSUs will be used for maintenance, not for transferring ownership or control of assets to private companies. The objective is to leverage the expertise of PSUs to efficiently manage infrastructure, especially in light of workforce shortages.

In a bid to streamline operations and ensure the efficient maintenance of newly created railway assets, the Railway Board has decided to involve its Public Sector Undertakings (PSUs) through competitive bidding. This decision comes after challenges were reported regarding the operationalization and upkeep of newly built sheds, depots, workshops, and rolling stock. The Railway Board has communicated that zonal Railways will be authorized to conduct limited tendering processes to select suitable PSUs for the maintenance of infrastructure. A set of 29 maintenance conditions has been outlined, covering safety audits, quality practices, and operational guidelines. Importantly, safety audits will be conducted annually, ensuring that the operations remain up to the required standards. Despite opposition from certain railway unions, who have expressed concerns about the potential privatization of operations, the Railway Board insists that PSUs will be used for maintenance, not for transferring ownership or control of assets to private companies. The objective is to leverage the expertise of PSUs to efficiently manage infrastructure, especially in light of workforce shortages.

Next Story
Equipment

Mecbo America Launches Scorpion Concrete Crawler Boom

Mecbo America, a division of Blastcrete Equipment LLC, brings a new product to its lineup: the Scorpion Concrete Crawler Boom. The Scorpion provides contractors working in piling, drilling, tunneling or commercial construction with a flexible arm for placing concrete where needed without disrupting the jobsite. It is an economical enhancement for contractors who have a concrete pump but need an effective way to deftly move material to spots that are difficult or unsafe to reach using other methods. “As concrete contractors grow and the scope of their work changes, many recognize the need fo..

Next Story
Real Estate

Cluster Redevelopment and Affordable Housing to shape Mumbai’s Future

The Government of Maharashtra is accelerating efforts to expand affordable housing, with a focus on large-scale development under the MMR Growth Hub Project. As part of this initiative, the Maharashtra Housing and Area Development Authority (MHADA) will construct eight lakh homes by 2030, in alignment with NITI Aayog’s recommendations. This announcement was made today by Deputy Chief Minister and Housing Minister Eknath Shinde, who emphasized the government’s commitment to providing high-quality, affordable homes to citizens. The computerised housing lottery, organised by the MHADA Konkan..

Next Story
Infrastructure Urban

Cummins Reports Strong Fourth Quarter

The Board of Directors of Cummins India Limited (CIL), at their meeting reviewed, and approved the unaudited financial results for the quarter and period ended December 31, 2024. Performance Highlights (based on standalone unaudited financial results) for the quarter ended December 31, 2024: - Total Sales for the quarter at Rs 30.41 billion higher by 22 per cent compared to the same quarter last year and higher by 24 per cent compared to the previous quarter. - Domestic sales at Rs 25.77 billion higher by 18 per cent compared to the same quarter last year and higher by 28 per cent compared t..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?