DPR for Koyambedu-Avadi Metro Line by November
RAILWAYS & METRO RAIL

DPR for Koyambedu-Avadi Metro Line by November

The Detailed Project Report (DPR) for the Koyambedu-Avadi Metro Line in Chennai is expected to be finalized by November 2024. This report will outline the comprehensive plan for the new metro corridor, which aims to enhance connectivity and improve public transportation in the Chennai metropolitan area.

The Koyambedu-Avadi line is a significant addition to Chennai?s metro network, designed to alleviate traffic congestion and provide a reliable alternative for commuters. The corridor will connect Koyambedu, a major commercial hub, with Avadi, a key residential and industrial area, thus catering to the growing transportation needs of these regions.

The DPR will include detailed feasibility studies, route planning, cost estimates, and environmental assessments. It will also address the technical specifications and project timelines necessary for the successful implementation of the metro line.

This metro project is part of Chennai's broader strategy to expand its metro network, which aims to boost urban mobility, reduce travel time, and support sustainable transportation. The introduction of the Koyambedu-Avadi line is expected to significantly enhance the efficiency of Chennai's public transport system and provide a much-needed boost to the city's infrastructure.

The Detailed Project Report (DPR) for the Koyambedu-Avadi Metro Line in Chennai is expected to be finalized by November 2024. This report will outline the comprehensive plan for the new metro corridor, which aims to enhance connectivity and improve public transportation in the Chennai metropolitan area. The Koyambedu-Avadi line is a significant addition to Chennai?s metro network, designed to alleviate traffic congestion and provide a reliable alternative for commuters. The corridor will connect Koyambedu, a major commercial hub, with Avadi, a key residential and industrial area, thus catering to the growing transportation needs of these regions. The DPR will include detailed feasibility studies, route planning, cost estimates, and environmental assessments. It will also address the technical specifications and project timelines necessary for the successful implementation of the metro line. This metro project is part of Chennai's broader strategy to expand its metro network, which aims to boost urban mobility, reduce travel time, and support sustainable transportation. The introduction of the Koyambedu-Avadi line is expected to significantly enhance the efficiency of Chennai's public transport system and provide a much-needed boost to the city's infrastructure.

Next Story
Infrastructure Urban

Large-sized Deals Drive 40% of Industrial & Warehousing Demand

With 25.6 million sq ft of gross leasing in 2024, industrial & warehousing demand across the top five cities remained healthy, witnessing a marginal 2 per cent YoY growth. Although, there was a noticeable dip in leasing activity during the last quarter, strong space uptake in the earlier quarters ensured steady leasing levels during 2024. During the year, Delhi NCR led the demand with 26 per cent share, closely followed by Chennai at 23 per cent share. On a quarterly basis, Q4 2024 saw about 5.5 million sq ft of industrial & warehousing demand across the top five cities. Pune, closely followed..

Next Story
Infrastructure Energy

Vedanta Aluminium Launches Advanced Operational Dashboard

Vedanta Aluminium, India’s largest producer of aluminium, has launched an innovative operational dashboard at its Jamkhani Coal Mine, Odisha. This state-of-the-art digital platform integrates real-time data, optimises performance metrics and automates routine processes. Developed in-house by a dedicated team, this dashboard leverages the First Principles approach to track mining operations at their most fundamental levels. It delivers actionable insights for achieving operational excellence through the Time-in-Use Model (TUM), which measures planned and actual cut rates, real-time coal expos..

Next Story
Infrastructure Transport

PNC-KKR Deal Nears Completion

Infrastructure company PNC Infratech has received in principle approvals from NHAI to transfer 100 per cent stake held by it in two subsidiaries (SPVs) for the Bundelkhand and Khajuraho road projects to the KKR-backed Highways Infrastructure Trust. With this, the PNC-KKR deal is on track for closure by March 31, 2025 as PNC Infratech is in the process of fulfilling the conditions precedents (CPs) for the transaction. One of the major CPs under the deal included change in control approvals from the highway authorities and no objection certificates from the lenders to the projects, according to ..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000