A Feather  in the glory of Indian railways
RAILWAYS & METRO RAIL

A Feather in the glory of Indian railways

The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country.

The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur.

On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as "a feather in the glory of Indian railways" by former vice president M Venkaiah Naidu.

An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present.

Features of Longest Electrified Train Tunnel –
(a) The tunnel is ‘Horse Shoe’ shaped.
(b) New Australian Tunneling Method(NATM) was followed during construction.
(c) The LED lighting provided at a distance of 10 metres inside the tunnel.
(d) The height of the tunnel is 6.5 metres (rail level to roof).
(e) The height of contact wire is maintained at 5.2 metres.
(f) The thickness of the full length lining is 300 mm.

This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast.

The Railways are developing a plan to become the largest "Green Railways" in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23.

Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express.

See also:
Railways releases energy-efficiency plan to reach 2030 net-zero goal
India's first indigenous hydrogen train to be operational in 2023


The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country. The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur. On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as a feather in the glory of Indian railways by former vice president M Venkaiah Naidu. An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present. Features of Longest Electrified Train Tunnel – (a) The tunnel is ‘Horse Shoe’ shaped. (b) New Australian Tunneling Method(NATM) was followed during construction. (c) The LED lighting provided at a distance of 10 metres inside the tunnel. (d) The height of the tunnel is 6.5 metres (rail level to roof). (e) The height of contact wire is maintained at 5.2 metres. (f) The thickness of the full length lining is 300 mm. This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast. The Railways are developing a plan to become the largest Green Railways in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23. Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express. See also: Railways releases energy-efficiency plan to reach 2030 net-zero goalIndia's first indigenous hydrogen train to be operational in 2023

Next Story
Real Estate

K Raheja Corp launches luxury tower at Raheja Galaxy, South Pune

K Raheja Corp Homes has unveiled a new luxury tower at Raheja Galaxy in South Pune, catering to the growing demand for premium living spaces in the area. Located off NIBM, the project offers seamless connectivity, excellent infrastructure, and a reputation for timely delivery and superior construction quality.The new tower features spacious 2-bed, 3-bed, and 3BHK L residences, priced from Rs 1.29 crore. The homes are designed with modern amenities and a neo-classical architectural style, offering a balance of functionality and luxury. Prices will increase after April 30th, making the early-bir..

Next Story
Infrastructure Urban

PM to Visit Bihar on April 24 for Panchayati Raj Day Celebrations

Prime Minister Shri Narendra Modi is scheduled to visit Bihar on 24th April 2025. During his visit to Madhubani, he will participate in the National Panchayati Raj Day celebrations at around 11:45 AM. On this occasion, he will inaugurate, dedicate, and lay the foundation stone for several development projects worth over Rs 134 bn, and will address the public gathering. As part of the programme, the Prime Minister will present the National Panchayat Awards, honouring the best-performing Panchayats from across the country. In the railways sector, Prime Minister Modi will flag off the Amrit Bha..

Next Story
Infrastructure Urban

Rs 140 Bn Infra Projects in North India Reviewed by DPIIT Secretary

Shri Amardeep Bhatia, Secretary of the Department for Promotion of Industry and Internal Trade (DPIIT), chaired a high-level Project Monitoring Group (PMG) review meeting to assess progress on major infrastructure projects in Uttar Pradesh, Haryana, Punjab, and Uttarakhand. The meeting was attended by senior officials from central ministries, state governments, and private sector project proponents. A total of 17 key infrastructure projects, collectively worth over Rs 140 billion, were reviewed during the session, which addressed 19 critical issues affecting project execution. The discussions..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?