UPPWD seeks bids for Two-Lane NH Project in UP
ROADS & HIGHWAYS

UPPWD seeks bids for Two-Lane NH Project in UP

The Ministry of Road Transport & Highways through Uttar Pradesh Public Works Department is engaged in the development of National Highways and as part of this endeavor, it has been decided to undertake work of Improvement and up-gradation from Km 29+000 (Sarpur) to Km 47+878/47+800 (Gosaiganj) of NH-227B (Sarpur to Gosaiganj Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

The complete BID document can be viewed / downloaded from official portal of the CPPP website https://eprocure.gov.in/eprocure/app from 19.06.2023 to 02.08.2023 (up to 11.00 Hrs.IST).

The tender seeks civil work- roads worth Rs. 5,91,28,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on June 19, 2023 and will end on August 2, 2023.

A Pre-Bid meeting shall take place at the following date, time, and place: Chief Engineer-Regional Office, Ministry of Road Transport and Highways, N.H. Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar, Lucknow 226022

Date: 20-July-2023 Time: 12:00 PM

Bidder must submit its financial bid and Technical Bid on or before 02.08.2023 https://eprocure.gov.in/eprocure/app

Essential details:

Project Estimated Value: ₹ 5,91,28,00,000
Product Category: Civil works- Roads
Bid Validity (Days): 730
Period of Work: 120 days
Tender ID - 2023_MoRTH_758308_1
Tender Ref. No.: CE-RO/LKO/NH(O)/12/NH227B (Pkg-II)/C.W./2022-23
Payment mode: Offline
Form of contract: EPC

About UPPWD:
The Uttar Pradesh Public Works Department (UPPWD) is responsible for the construction, maintenance, and improvement of roads and bridges in the state of Uttar Pradesh. The UPPWD has played a major role in the development of National Highways in the state.

In 2021-22, the UPPWD completed 51 projects under the Pradhan Mantri Gram Sadak Yojana (PMGSY), which is a central government scheme for the construction of rural roads. The UPPWD also completed 16 projects under the Bharatmala Pariyojana, which is a central government scheme for the development of national highways.

The UPPWD has also undertaken a number of other projects to improve the condition of national highways in the state. These projects include widening and strengthening of existing roads, construction of new bypasses, and construction of bridges.

The Ministry of Road Transport & Highways through Uttar Pradesh Public Works Department is engaged in the development of National Highways and as part of this endeavor, it has been decided to undertake work of Improvement and up-gradation from Km 29+000 (Sarpur) to Km 47+878/47+800 (Gosaiganj) of NH-227B (Sarpur to Gosaiganj Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh. The complete BID document can be viewed / downloaded from official portal of the CPPP website https://eprocure.gov.in/eprocure/app from 19.06.2023 to 02.08.2023 (up to 11.00 Hrs.IST). The tender seeks civil work- roads worth Rs. 5,91,28,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on June 19, 2023 and will end on August 2, 2023. A Pre-Bid meeting shall take place at the following date, time, and place: Chief Engineer-Regional Office, Ministry of Road Transport and Highways, N.H. Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar, Lucknow 226022 Date: 20-July-2023 Time: 12:00 PM Bidder must submit its financial bid and Technical Bid on or before 02.08.2023 https://eprocure.gov.in/eprocure/app Essential details: Project Estimated Value: ₹ 5,91,28,00,000 Product Category: Civil works- Roads Bid Validity (Days): 730 Period of Work: 120 days Tender ID - 2023_MoRTH_758308_1 Tender Ref. No.: CE-RO/LKO/NH(O)/12/NH227B (Pkg-II)/C.W./2022-23 Payment mode: Offline Form of contract: EPC About UPPWD: The Uttar Pradesh Public Works Department (UPPWD) is responsible for the construction, maintenance, and improvement of roads and bridges in the state of Uttar Pradesh. The UPPWD has played a major role in the development of National Highways in the state. In 2021-22, the UPPWD completed 51 projects under the Pradhan Mantri Gram Sadak Yojana (PMGSY), which is a central government scheme for the construction of rural roads. The UPPWD also completed 16 projects under the Bharatmala Pariyojana, which is a central government scheme for the development of national highways. The UPPWD has also undertaken a number of other projects to improve the condition of national highways in the state. These projects include widening and strengthening of existing roads, construction of new bypasses, and construction of bridges.

Next Story
Infrastructure Urban

Macrotech acquires Bain Capital's stake in 3 entities for Rs 3 Bn

Realty firm Macrotech Developers has acquired Bain Capital's stake in three industrial and logistics park entities for Rs 3.07 billion as part of a strategy to enhance rental income. Macrotech Developers is one of the leading real estate firms in the country. It sells properties under Lodha brand. In a regulatory filing, the company informed that it has "executed Securities Purchase Agreements (SPAs) with India Opportunities Fund SSA Scheme 1 and DSS Opportunities Investment 1 (Bain Capital) for acquisition of their interest in the digital infrastructure platform entities (Bellissimo Digital I..

Next Story
Infrastructure Urban

Tata Steel reports Rs 7.59 Bn net profit in Jul-Sep

Tata Steel reported a net profit of Rs 7.58 billion for the September 2024 quarter, helped by lower expenses. It had posted a net loss of Rs 65.11 billion in the July-September period of the preceding 2023-24 fiscal, the company said in an exchange filing. In a separate statement, Tata Steel CEO and MD TV Narendran said the global operating environment remained complex, with key regions facing subdued growth. Macroeconomic conditions in China continued to weigh on commodity prices, including steel. In India, steel demand continued to improve, but domestic prices were under pressure due to chea..

Next Story
Infrastructure Urban

SC to verdict on Nov 7 on plea against NCLAT

The Supreme Court is scheduled to pronounce its verdict on a plea of State Bank of India (SBI) and other creditors challenging the National Company Law Appellate Tribunal (NCLAT) decision that upheld the resolution plan of grounded air carrier Jet Airways and approved the transfer of its ownership to Jalan Kalrock Consortium (JKC). A bench of Chief Justice D Y Chandrachud and Justices J B Pardiwala and Manoj Misra will pronounce the verdict which was reserved on October 16. The NCLAT had on March 12 upheld the resolution plan of the grounded air carrier and approved the transfer of its ownersh..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000