Nitin Gadkari promises traffic relief for Pimpri Chinchwad
ROADS & HIGHWAYS

Nitin Gadkari promises traffic relief for Pimpri Chinchwad

Union Minister for Road Transport and Highways, Nitin Gadkari, announced that the upcoming Mumbai-Pune-Bengaluru expressway will significantly reduce traffic congestion in the Pimpri Chinchwad area. Speaking at a rally for BJP candidate Shankar Jagtap in Chinchwad, Gadkari highlighted the expressway’s importance in easing the region’s traffic woes.

Gadkari shared that the expressway, which will be part of a larger ring road network, is estimated to cost Rs 550 billion. “The expressway from Mumbai to Bengaluru, passing through the ring road, will help alleviate the persistent traffic jams in Pimpri Chinchwad,” he said.

In addition to the expressway, Gadkari also discussed several other road projects in Pune. He revealed that elevated stretches and flyovers worth Rs 800 billion had been approved. Key projects include a major route from Nashik Phata to Khed, which will cost Rs 80 billion, as well as plans to upgrade the Solapur-Yavat and Narhe-Ravet roads in Pune city. An elevated road will also be constructed on the Talegaon-Chakan route at a cost of Rs 70 billion.

Union Minister for Road Transport and Highways, Nitin Gadkari, announced that the upcoming Mumbai-Pune-Bengaluru expressway will significantly reduce traffic congestion in the Pimpri Chinchwad area. Speaking at a rally for BJP candidate Shankar Jagtap in Chinchwad, Gadkari highlighted the expressway’s importance in easing the region’s traffic woes. Gadkari shared that the expressway, which will be part of a larger ring road network, is estimated to cost Rs 550 billion. “The expressway from Mumbai to Bengaluru, passing through the ring road, will help alleviate the persistent traffic jams in Pimpri Chinchwad,” he said. In addition to the expressway, Gadkari also discussed several other road projects in Pune. He revealed that elevated stretches and flyovers worth Rs 800 billion had been approved. Key projects include a major route from Nashik Phata to Khed, which will cost Rs 80 billion, as well as plans to upgrade the Solapur-Yavat and Narhe-Ravet roads in Pune city. An elevated road will also be constructed on the Talegaon-Chakan route at a cost of Rs 70 billion.

Next Story
Infrastructure Energy

Adyant Enersol & UPC Renewables Secure SJVN's 600 MW Wind Project

Adyant Enersol (Datta Infra) and UPC Renewables secured contracts in SJVN’s auction to develop 600 MW inter-state transmission system (ISTS)-connected wind power projects under a build-own-operate model. Adyant Enersol was awarded 70 MW with a tariff of Rs 3.98/kWh, while UPC Renewables secured 100 MW at a tariff of Rs 3.99/kWh. The tender for these projects was issued in March 2024, allowing bidders to submit proposals for capacities ranging from a minimum of 50 MW to a maximum of 300 MW, with project sizes specified in multiples of 10 MW. The selected developers are required to establis..

Next Story
Infrastructure Energy

Bridge and Roof Secures SJVN Contract for 100 MW Solar Project

Bridge and Roof Company, a government enterprise under the Ministry of Heavy Industries, has secured the engineering, procurement, and construction contract from SJVN Green Energy to establish a 100 MW solar power project in Rajasthan’s Didwana-Kuchaman district. The project is valued at approximately Rs 3.5 billion. The tender was issued in April 2024. The scope of work includes land development, design and engineering, procurement of equipment and materials, testing at the manufacturer’s facility, packing, transportation, supply, unloading, on-site storage, installation, erection, test..

Next Story
Infrastructure Transport

NHAI Uses AI and Drones to Detect 1,000 Encroachments on Highways

The National Highway Authority of India (NHAI) has implemented artificial intelligence (AI) and drone technology to detect approximately 1,000 encroachments on four major national highways. This initiative aims to address obstacles that hinder road construction projects and ensure their timely completion. The survey covered a span of about 360 kilometres, utilising high-frequency drones to capture detailed aerial images of the highways. AI-driven algorithms analysed these images to identify potential encroachments, including parked vehicles, construction materials, and makeshift structures. F..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000