+
NH-10 Bengal-Sikkim route restricts vehicle movement for repairs
ROADS & HIGHWAYS

NH-10 Bengal-Sikkim route restricts vehicle movement for repairs

The district magistrate of Kalimpong in West Bengal issued an order on Sunday, announcing the restriction of vehicular movement on National Highway 10, which connects West Bengal with Sikkim. The restriction was imposed indefinitely to facilitate repair works on a portion of the highway. The order directed the concerned authorities to restrict and divert vehicular movement from Rabi Jhora to 29th Mile until further notice.

Locals expressed concerns about the inconvenience caused by this restriction and diversion. They mentioned that due to the diversion, a small car would take an additional six to seven hours to reach Gangtok, the capital of Sikkim, from Siliguri in north Bengal. Goods vehicles were expected to take 9-10 hours longer than usual to traverse the NH-10 route.

The order attributed the repair work at Rabi Jhora and Likhu Veer on NH-10 to recent heavy rainfall, which had damaged this stretch of the highway. Officials highlighted the dangers posed by boulders rolling down the hills in Likhu Veer due to rainfall and the damage incurred between Rabi Jhora and 29th Mile on the highway.

The officials urged everyone to use alternative routes for travel between Sikkim and Siliguri. The order specified that only small vehicles would be permitted to travel from Rangpo to Siliguri via Monsoong-17 Mile-Algarah-Lava-Gorubathan and vice versa at all times. Small and goods vehicles were permitted to use the route via Melli bridge-Chitrey-Kalimpong town-Algarah-Lava-Gorubathan to Siliguri and vice versa. However, goods vehicles were restricted to this route between 9 pm and 6 am.

Additionally, the order allowed goods and small vehicles to travel round the clock from Reshi-Pedong-Algarah-Lava-Gorubathan-Siliguri and vice versa.

The district magistrate of Kalimpong in West Bengal issued an order on Sunday, announcing the restriction of vehicular movement on National Highway 10, which connects West Bengal with Sikkim. The restriction was imposed indefinitely to facilitate repair works on a portion of the highway. The order directed the concerned authorities to restrict and divert vehicular movement from Rabi Jhora to 29th Mile until further notice. Locals expressed concerns about the inconvenience caused by this restriction and diversion. They mentioned that due to the diversion, a small car would take an additional six to seven hours to reach Gangtok, the capital of Sikkim, from Siliguri in north Bengal. Goods vehicles were expected to take 9-10 hours longer than usual to traverse the NH-10 route. The order attributed the repair work at Rabi Jhora and Likhu Veer on NH-10 to recent heavy rainfall, which had damaged this stretch of the highway. Officials highlighted the dangers posed by boulders rolling down the hills in Likhu Veer due to rainfall and the damage incurred between Rabi Jhora and 29th Mile on the highway. The officials urged everyone to use alternative routes for travel between Sikkim and Siliguri. The order specified that only small vehicles would be permitted to travel from Rangpo to Siliguri via Monsoong-17 Mile-Algarah-Lava-Gorubathan and vice versa at all times. Small and goods vehicles were permitted to use the route via Melli bridge-Chitrey-Kalimpong town-Algarah-Lava-Gorubathan to Siliguri and vice versa. However, goods vehicles were restricted to this route between 9 pm and 6 am. Additionally, the order allowed goods and small vehicles to travel round the clock from Reshi-Pedong-Algarah-Lava-Gorubathan-Siliguri and vice versa.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App