Madhya pradesh seek bids for construction of 6 lane flyover at Dewas Naka
ROADS & HIGHWAYS

Madhya pradesh seek bids for construction of 6 lane flyover at Dewas Naka

The Madhya Pradesh Road Development Corporation Ltd., Bhopal (the “Authority”) is engaged in the development of State Highways and as part of this endeavour, the Authority has decided to undertake Construction of 6-lane flyover at Dewas Naka intersection in Indore city in the State of Madhya Pradesh through an Engineering, Procurement and Construction (the “EPC”) Contract.

A brief description of the project may be seen in the Information Memorandum of the Project at the website https://mptenders.gov.in/nicgep/app. Brief particulars of the Project are as follows:


A Bidder is required to submit along with its bid, a Bid Security in online mode only and of amount equal to Rs. 0.79 Cr (Rs. Seventy - nine lakh) and cost of Bid Document of amount INR 50,000/- (INR Fifty Thousand only).

The tender seeks civil works of Rs 78,98,00,000 to be completed in 540 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period will start on June 12, 2023 and will end on June 19, 2023.

Detail tender document will be available on https://mptenders.gov.in/nicgep/app

A Pre-Bid meeting shall take place at the following date, time, and place: HO MPRDC Bhopal

Date: 29-05-2023 Time: 3:30 PM

Essential details:

Project Estimated Value: ₹ 78,98,00,000
Product Category: Civil works – Bridges
Bid Validity (Days): 120
Period of Work: 540 days
Tender ID - 202

Redefine the future of urban mobility! Join us at the Metro Rail Conference 2025 to explore groundbreaking ideas and insights. 👉 Register today!

The Madhya Pradesh Road Development Corporation Ltd., Bhopal (the “Authority”) is engaged in the development of State Highways and as part of this endeavour, the Authority has decided to undertake Construction of 6-lane flyover at Dewas Naka intersection in Indore city in the State of Madhya Pradesh through an Engineering, Procurement and Construction (the “EPC”) Contract. A brief description of the project may be seen in the Information Memorandum of the Project at the website https://mptenders.gov.in/nicgep/app. Brief particulars of the Project are as follows: A Bidder is required to submit along with its bid, a Bid Security in online mode only and of amount equal to Rs. 0.79 Cr (Rs. Seventy - nine lakh) and cost of Bid Document of amount INR 50,000/- (INR Fifty Thousand only). The tender seeks civil works of Rs 78,98,00,000 to be completed in 540 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period will start on June 12, 2023 and will end on June 19, 2023. Detail tender document will be available on https://mptenders.gov.in/nicgep/app A Pre-Bid meeting shall take place at the following date, time, and place: HO MPRDC Bhopal Date: 29-05-2023 Time: 3:30 PM Essential details: Project Estimated Value: ₹ 78,98,00,000 Product Category: Civil works – Bridges Bid Validity (Days): 120 Period of Work: 540 days Tender ID - 202

Next Story
Infrastructure Transport

Anji Khad Bridge, India's First Cable-Stayed Rail Bridge Ready in J&K

Indian Railways has completed the Anji Khad Bridge, India’s first cable-stayed rail bridge, located in the Reasi district of Jammu and Kashmir. A critical component of the ambitious Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project, this engineering marvel connects Katra and Reasi, promising enhanced regional connectivity and economic growth.Spanning 725.5 metres, the bridge features a 193-metre-tall main pylon, soaring 331 metres above the riverbed. Its design allows it to withstand wind speeds of up to 213 km/h and safely support train operations at speeds of 100 km/h.Constructed in th..

Next Story
Infrastructure Urban

Exporters Raise Logistics Costs Concerns with Piyush Goyal

Exporters and freight agencies have voiced concerns over high terminal handling charges at ports and the underutilisation of dry ports, adding to India’s overall logistics costs. During a meeting with Commerce and Industry Minister Piyush Goyal, they highlighted that the fees charged by shipping terminals for container storage and positioning before loading exceed port charges by Rs 10,000-15,000 per consignment. The discussion focused on logistics and shipping challenges, with the government actively working to reduce costs across the supply chain, according to an official. India is targe..

Next Story
Infrastructure Transport

Government to Revamp UDAN Scheme with Focus on Airport Readiness

The Indian government is set to revamp its regional air connectivity scheme, UDAN (Ude Desh ka Aam Nagrik), by prioritising airport readiness before inviting airlines to bid for operating routes. Financial support for the development of unserved airports and airstrips across the country is expected to be a key focus in the upcoming budget, along with stricter assessments of route feasibility, according to sources. Launched in 2017 to boost air travel in the world’s fastest-growing aviation market, the UDAN scheme caps airfares and provides subsidies to airlines for operating on less frequen..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000