Kerala Infra Fund Board approves Rs 2,134.5 cr for tunnel project
ROADS & HIGHWAYS

Kerala Infra Fund Board approves Rs 2,134.5 cr for tunnel project

Kerala Infrastructure Investment Fund Board (KIIFB) has approved the allotment of Rs 2,134.5 crore for the tunnel road project, an alternative to the busy Thamarassery Ghat Pass that would link Kozhikode and Wayanad districts.

Linto Joseph, Thiruvambadi MLA, told the media that the state government provided the administrative sanction for Rs 658 crore for the proposed road on the Anakkampoyil-Kalladi-Meppadi route.

Subsequently, according to the Detailed Project Report (DPR), drafted by the Konkan Railway Corporation Limited (KRCL), the cost was estimated to be Rs 2,134 crore.

After getting permission from the Ministry of Environment, Forest and Climate Change (MoEFCC) and administrative sanction from the government, construction would start.

The District Collectors of Kozhikode and Wayanad are directed to acquire land for the proposed road.

The project would not only help the districts of Kozhikode and Wayanad but also the Kannur and Malappuram ones.

The distance from Kozhikode to Wayanad would be decreased to 54 km from the existing 85 km.

Image Source

Also read: Survey works for Kerala's longest tunnel road

Kerala Infrastructure Investment Fund Board (KIIFB) has approved the allotment of Rs 2,134.5 crore for the tunnel road project, an alternative to the busy Thamarassery Ghat Pass that would link Kozhikode and Wayanad districts. Linto Joseph, Thiruvambadi MLA, told the media that the state government provided the administrative sanction for Rs 658 crore for the proposed road on the Anakkampoyil-Kalladi-Meppadi route. Subsequently, according to the Detailed Project Report (DPR), drafted by the Konkan Railway Corporation Limited (KRCL), the cost was estimated to be Rs 2,134 crore. After getting permission from the Ministry of Environment, Forest and Climate Change (MoEFCC) and administrative sanction from the government, construction would start. The District Collectors of Kozhikode and Wayanad are directed to acquire land for the proposed road. The project would not only help the districts of Kozhikode and Wayanad but also the Kannur and Malappuram ones. The distance from Kozhikode to Wayanad would be decreased to 54 km from the existing 85 km. Image Source Also read: Survey works for Kerala's longest tunnel road

Next Story
Real Estate

Ring in the New!

Lighting:OLED (organic light emitting diode) panels such as those by Philips are the latest option in soft lighting fixtures that can be embedded into walls, ceilings or furniture, says Nilesh Sawant, Principal Architect, Nilesh Sawant Architect. “Being thin and flexible, they lend themselves well to different applications while delivering the energy-efficiency associated with LED technology.”And Sapna Aggarwal, Founder, ANSA Architecture & Interiors, says “Embedded light-emitting diodes can create a dreamy illumination, while dimmable LEDs are useful for allowing..

Next Story
Infrastructure Urban

Jhansi Library

The Jhansi Library, commissioned by the Jhansi Development Authority (JDA) under the Jhansi Smart City initiative and built by Bootes Impex, a net-zero construction-tech company. It is the first library in Asia to achieve EDGE (Excellence in Design for Greater Efficiencies) certification from the International Finance Corporation (IFC), a member of the World Bank Group. This milestone marks the library as India’s first and only net-zero library, aligning  with India’s Net-Zero Vision 2070.Sustainable designDeepak Rai, Managing Director, Bootes Impex, explains, “The project's vision ..

Next Story
Infrastructure Urban

We aim to support Hyderabad’s environmental transformation

Ramky Infrastructure was recognised as the ‘Third Fastest Growing Construction Company under the Medium Category’ at the prestigious 22nd Construction World Global Awards [CWGA] 2024. Y R Nagaraja, Managing Director, speaks about the factors behind this achievement, as well as the challenges involved in India’s largest sewage treatment plant (STP) project and how its sequential batch reactor (SBR) technology reduces the carbon footprint and power consumption. Excerpts:What led to your success at CWGA 2024?We are honoured to be recognised as the ‘Third Fastest Growing Construc..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000