74 smart projects at Rs 11.84 bn in Shimoga!
ROADS & HIGHWAYS

74 smart projects at Rs 11.84 bn in Shimoga!

Shivamogga Smart City Corporation has selected about 74 projects to be taken up under smart city. Of these 60 are SCM funded, six projects are taken up in PPP and eight under convergence, which is other departments executing the work under the ambit of the smart cities mission. These eight projects are ongoing and are completely funded by the state government. Under the Smart Cities mission, the city has selected projects at a total cost of Rs 11.84 billion; these are under various stages of project preparation or execution or tendering. “We recently floated tenders to the tune of Rs 2 billion, for which we are soon awarding work orders. Besides, we recently called for bids for the second time for two road packages worth Rs 1.4 billion and Rs 700 million each, with the last date for submission being December 22, 2018,” Charulata Somal, Managing Director, Shivamogga Smart City Corporation, and Commissioner, Shimoga City Corporation.
Apart from these, several DPRs are being prepared. The city has projects to the tune of Rs 4.44 billion for which DPRs are under preparation; the tenders for these will be announced in the coming two to three months. These include works for conservation of buildings for which we are preparing the concept; road works for last-mile connectivity and Ring Road improvement at about Rs 900 million. “Also, we will be tendering works for riverfront development – the frontline project of the smart city programme – at an estimated Rs 1.4 billion for the civil engineering component,” says Somal. Other projects include heritage works, with certain focal points of importance like the Shivappanaika Palace (known as Heritage Walk), which actually depicts the heritage of Shimoga city. So, we be developing about a 2-km stretch of roads – face-lifting existing roads as well as taking all the utilities underground – around these heritage places. The heritage works include a hard component such as the physical structure and a soft component wherein an app will provide an audio guide at important points while passing through the road. The corporation is planning to tender out all the works for this before March.
 

DPR Stage      
  Work DPR Cost Status
1 Development of
conservancies in Package-4
47.5 Tender notification date: 18-12-2018 Technical
bid opening date: 21-01-2019
Financial bid opening date: 23-01-2019
Likely date of WO: 30-01-2019
2 Improvement and beautification
of private bus terminal
40 Tender notification date: 20-12-2018
Technical bid opening date: 23-01-2019
Financial bid opening date: 27-01-2019
Likely date of WO: 30-01-2019
3 Development of parks
Malleshwar Nagar park, Balrajurs road
25 Tender notification date: 18-12-2018
Technical bid opening date: 21-01-2019
Financial bid opening date: 23-01-2019
Likely date of WO: 30-01-2019
4 Development of conservancies
in Package-5
100 Tender notification date: 15-12-2018
Technical bid opening date: 20-01-2018
Financial bid opening date: 30-01-2019
Likely date of WO: 25-02-2019
5 UG elelctrical cabling in Smart
Road Package-1 Area (not included
in Mescom scope -under convergence)
90 Tender notification date: 28-12-2018
Technical bid opening date: 03-02-2019
Financial bid opening date: 15-02-2019
Likely date of WO: 28-02-2019
6 Development of heritage walk / village 170 Tender notification date: 28-12-2018
Technical bid opening date: 10-02-2019
Financial bid opening date: 17-02-2019
Likely date of WO: 25-02-2019
7 Riverfront development –
infrastruture works; pedestrian bridge,
riverfront promenade, etc – North Bank
1500 Tender notification date: 25-01-2019
Technical bid opening date: 27-02-2019
Financial bid opening date: 10-03-2019
Likely date of WO: 05-04-2019
8 Development of Shivappa
Nayaka Palace infrastructure
155 Tender notification date: 28-12-2018
Technical bid opening date: 03-02-2019
Financial bid opening date: 05-03-2019
Likely date of WO: 15-03-2019
9 Development of
Corporation Park (Park 17)
30 Tender notification date: 15-12-2018
Technical bid opening date: 20-01-2019
Financial bid opening date: 30-01-2019
Likely date of WO: 15-02-2019
10 Public bike sharing 15 Tender notification date: 21-12-2018
Technical bid opening date: 23-01-2019
Financial bid opening date: 11-02-2019
Likely date of WO: 10-04-2019
  Total
Concept Stage      
1 Conservation of heritage
building – Government school
adjacent to Karnataka Sanga
and other buildings
50 Tender notification date: 15-01-2019 Technical bid opening date: 16-03-2019
Financial bid opening date: 25-03-2019
Likely date of WO: 20-04-2019
2 Conservation of heritage
Building – Corporation main
building
30 Tender notification date: 15-01-2019
Technical bid opening date: 16-03-2019
Financial bid opening date: 25-03-2019
Likely date of WO: 20-04-2019
3 Last mile connectivity using
cycle track and footpath –
Development of Inner Ring
Road from Laxmi Talkies
Junction to NT Road (7.5 km)
900 To be tendered after January 2019
4 Smart education in government
schools – Pan-city
(35 schools)
250 To be tendered after January 2019
5 Smart health 100 To be tendered after January 2019
6 Construction of MLCP with
commercial complex
350 To be tendered after January 2019
7 Multilevel car parking 250 To be tendered after January 2019
8 Remodelling of open air theatre
and improvements of surrounding
area of Kuvempu Rangamandira and
renovation of Rangamandira
100 To be tendered after January 2019
9 Wildlife interpretation centre with
planetarium and science park
100 To be tendered after January 2019
10 Tunga River rejuvenation and
cleaning project
100 To be tendered after January 2019
11 Mechanical canal cleaning 100 To be tendered after January 2019
12 Riverfront south bank wet land development 55 To be tendered after January 2019
13 Façade improvement and conversion
of Gandhi Bazaar road as non-motorized
zone including parking
50 To be tendered after January 2019
14 Modern police information/
tourism kiosk
185 To be tendered after January 2019
15 Providing smart bus
shelters and e-toilet for
pan-city (61 nos)
550 To be tendered after January 2019
16 24 x 7 water supply –
last mile coverage
200 To be tendered after January 2019
17 Nehru Stadium existing
sports facility upgradation
100 To be tendered after January 2019
18 Development of parks –
Gandhi Park (Park 16)
100 To be tendered after January 2019
19 Revival of sandalwood
factory
100 To be tendered after January 2019
20 Development of international
bio-diversity research
campus
50 To be tendered after January 2019
21 Rehabilitation and rescue
centre for stray animals
along with crematorium
for animals
20 To be tendered after January 2019
22 Unifying city identity with
signature gates with ICT
infrastructure and signages
20 To be tendered after January 2019
23 Centre of excellence for
local arts and crafts
20 To be tendered after January 2019
24 Face-lifting to riverfront
crematorium
10 To be tendered after January 2019
25 Street art in the selected
locations across the city
10 To be tendered after January 2019
26 Rock/wall climbing training
centre – SUDA new layout –
Urgadur
567 To be tendered after January 2019
27 Slum redevelopment    
  Total 44,270  

 - SERAPHINA D’SOUZA

Shivamogga Smart City Corporation has selected about 74 projects to be taken up under smart city. Of these 60 are SCM funded, six projects are taken up in PPP and eight under convergence, which is other departments executing the work under the ambit of the smart cities mission. These eight projects are ongoing and are completely funded by the state government. Under the Smart Cities mission, the city has selected projects at a total cost of Rs 11.84 billion; these are under various stages of project preparation or execution or tendering. “We recently floated tenders to the tune of Rs 2 billion, for which we are soon awarding work orders. Besides, we recently called for bids for the second time for two road packages worth Rs 1.4 billion and Rs 700 million each, with the last date for submission being December 22, 2018,” Charulata Somal, Managing Director, Shivamogga Smart City Corporation, and Commissioner, Shimoga City Corporation. Apart from these, several DPRs are being prepared. The city has projects to the tune of Rs 4.44 billion for which DPRs are under preparation; the tenders for these will be announced in the coming two to three months. These include works for conservation of buildings for which we are preparing the concept; road works for last-mile connectivity and Ring Road improvement at about Rs 900 million. “Also, we will be tendering works for riverfront development – the frontline project of the smart city programme – at an estimated Rs 1.4 billion for the civil engineering component,” says Somal. Other projects include heritage works, with certain focal points of importance like the Shivappanaika Palace (known as Heritage Walk), which actually depicts the heritage of Shimoga city. So, we be developing about a 2-km stretch of roads – face-lifting existing roads as well as taking all the utilities underground – around these heritage places. The heritage works include a hard component such as the physical structure and a soft component wherein an app will provide an audio guide at important points while passing through the road. The corporation is planning to tender out all the works for this before March.   DPR Stage         Work DPR Cost Status 1 Development of conservancies in Package-4 47.5 Tender notification date: 18-12-2018 Technical bid opening date: 21-01-2019 Financial bid opening date: 23-01-2019 Likely date of WO: 30-01-2019 2 Improvement and beautification of private bus terminal 40 Tender notification date: 20-12-2018 Technical bid opening date: 23-01-2019 Financial bid opening date: 27-01-2019 Likely date of WO: 30-01-2019 3 Development of parks Malleshwar Nagar park, Balrajurs road 25 Tender notification date: 18-12-2018 Technical bid opening date: 21-01-2019 Financial bid opening date: 23-01-2019 Likely date of WO: 30-01-2019 4 Development of conservancies in Package-5 100 Tender notification date: 15-12-2018 Technical bid opening date: 20-01-2018 Financial bid opening date: 30-01-2019 Likely date of WO: 25-02-2019 5 UG elelctrical cabling in Smart Road Package-1 Area (not included in Mescom scope -under convergence) 90 Tender notification date: 28-12-2018 Technical bid opening date: 03-02-2019 Financial bid opening date: 15-02-2019 Likely date of WO: 28-02-2019 6 Development of heritage walk / village 170 Tender notification date: 28-12-2018 Technical bid opening date: 10-02-2019 Financial bid opening date: 17-02-2019 Likely date of WO: 25-02-2019 7 Riverfront development – infrastruture works; pedestrian bridge, riverfront promenade, etc – North Bank 1500 Tender notification date: 25-01-2019 Technical bid opening date: 27-02-2019 Financial bid opening date: 10-03-2019 Likely date of WO: 05-04-2019 8 Development of Shivappa Nayaka Palace infrastructure 155 Tender notification date: 28-12-2018 Technical bid opening date: 03-02-2019 Financial bid opening date: 05-03-2019 Likely date of WO: 15-03-2019 9 Development of Corporation Park (Park 17) 30 Tender notification date: 15-12-2018 Technical bid opening date: 20-01-2019 Financial bid opening date: 30-01-2019 Likely date of WO: 15-02-2019 10 Public bike sharing 15 Tender notification date: 21-12-2018 Technical bid opening date: 23-01-2019 Financial bid opening date: 11-02-2019 Likely date of WO: 10-04-2019   Total Concept Stage       1 Conservation of heritage building – Government school adjacent to Karnataka Sanga and other buildings 50 Tender notification date: 15-01-2019 Technical bid opening date: 16-03-2019 Financial bid opening date: 25-03-2019 Likely date of WO: 20-04-2019 2 Conservation of heritage Building – Corporation main building 30 Tender notification date: 15-01-2019 Technical bid opening date: 16-03-2019 Financial bid opening date: 25-03-2019 Likely date of WO: 20-04-2019 3 Last mile connectivity using cycle track and footpath – Development of Inner Ring Road from Laxmi Talkies Junction to NT Road (7.5 km) 900 To be tendered after January 2019 4 Smart education in government schools – Pan-city (35 schools) 250 To be tendered after January 2019 5 Smart health 100 To be tendered after January 2019 6 Construction of MLCP with commercial complex 350 To be tendered after January 2019 7 Multilevel car parking 250 To be tendered after January 2019 8 Remodelling of open air theatre and improvements of surrounding area of Kuvempu Rangamandira and renovation of Rangamandira 100 To be tendered after January 2019 9 Wildlife interpretation centre with planetarium and science park 100 To be tendered after January 2019 10 Tunga River rejuvenation and cleaning project 100 To be tendered after January 2019 11 Mechanical canal cleaning 100 To be tendered after January 2019 12 Riverfront south bank wet land development 55 To be tendered after January 2019 13 Façade improvement and conversion of Gandhi Bazaar road as non-motorized zone including parking 50 To be tendered after January 2019 14 Modern police information/ tourism kiosk 185 To be tendered after January 2019 15 Providing smart bus shelters and e-toilet for pan-city (61 nos) 550 To be tendered after January 2019 16 24 x 7 water supply – last mile coverage 200 To be tendered after January 2019 17 Nehru Stadium existing sports facility upgradation 100 To be tendered after January 2019 18 Development of parks – Gandhi Park (Park 16) 100 To be tendered after January 2019 19 Revival of sandalwood factory 100 To be tendered after January 2019 20 Development of international bio-diversity research campus 50 To be tendered after January 2019 21 Rehabilitation and rescue centre for stray animals along with crematorium for animals 20 To be tendered after January 2019 22 Unifying city identity with signature gates with ICT infrastructure and signages 20 To be tendered after January 2019 23 Centre of excellence for local arts and crafts 20 To be tendered after January 2019 24 Face-lifting to riverfront crematorium 10 To be tendered after January 2019 25 Street art in the selected locations across the city 10 To be tendered after January 2019 26 Rock/wall climbing training centre – SUDA new layout – Urgadur 567 To be tendered after January 2019 27 Slum redevelopment       Total 44,270    - SERAPHINA D’SOUZA

Next Story
Infrastructure Urban

Andhra Pradesh to Develop 30,000 Women-Led Enterprises by 2025

The Municipal Administration and Urban Development (MAUD) Department is accelerating efforts to create sustainable livelihoods for women in urban areas, in line with Chief Minister Nara Chandrababu Naidu’s goal of fostering one lakh women entrepreneurs by 2025. Under this initiative, the MAUD Department has set a target to establish 30,000 women-led enterprises across towns and cities in Andhra Pradesh. To support this vision, the department plans to establish Micro, Small & Medium Enterprises (MSMEs) for women in TIDCO housing complexes. Vacant plots across 163 colonies have been earmarked ..

Next Story
Infrastructure Energy

G Kishan Reddy discusses mining expansion, clearances with Chhattisgarh CM

Coal and Mines Minister G Kishan Reddy met Chhattisgarh CM Vishnu Deo Sai on Friday to expedite land acquisition and environmental clearances for mining projects. Reddy, who was on a two-day visit to review operations at South Eastern Coalfields Ltd (SECL), discussed measures to boost mining-led economic growth in the state. Key topics included speeding up land acquisition for mine expansions, obtaining quicker environmental approvals, and setting up integrated rehabilitation and resettlement sites. The minister also highlighted the importance of developing critical minerals in the region, alo..

Next Story
Infrastructure Urban

NITI Aayog's Vision for India's Auto Industry

NITI Aayog has launched the report titled "Automotive Industry: Powering India’s Participation in Global Value Chains," offering a roadmap for the country’s automotive future. Released by Shri Suman Bery, Vice Chairman, the report outlines key strategies to grow India’s automotive sector to $145 bn in component production by 2030. India is currently the fourth-largest automobile producer globally, but with only a modest three per cent share in the global automotive component market. The report emphasises the need to strengthen India’s position through competitive manufacturing, skill d..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?