Andhra Pradesh Sanctions Rs 19 Crore for Airport Study
AVIATION & AIRPORTS

Andhra Pradesh Sanctions Rs 19 Crore for Airport Study

Key Highlights from the Report: Sanction of Rs 19 Crore: The Andhra Pradesh government has approved a budget of Rs 19 crore for the pre-feasibility study of a new airport. This initiative is part of the state’s vision to strengthen its transport infrastructure and improve air connectivity to support economic growth.

Objective of the Study: The pre-feasibility study will assess various aspects of airport development, including location, technical feasibility, environmental impact, and cost-benefit analysis. This detailed analysis is expected to provide crucial insights into the viability of establishing a new airport in the region.

Boosting Regional Connectivity: The proposed airport aims to enhance regional air connectivity, making it easier for both passengers and freight to move efficiently within and outside the state. This move is expected to improve the overall transportation network, benefiting tourism, trade, and industry.

Infrastructure Growth Plans: The state government has recognized the need for improved infrastructure to support economic activities. A new airport could open up new opportunities for business, tourism, and employment, contributing to Andhra Pradesh’s development trajectory.

Potential Locations: Although the exact location for the new airport is yet to be finalized, the study will identify the most suitable sites based on factors such as accessibility, land availability, and proximity to economic hubs in the state.

Government’s Vision for Growth: The decision to invest in the pre-feasibility study underscores the Andhra Pradesh government's commitment to advancing its infrastructure and boosting regional development. The new airport could become a key asset in the state’s transportation network, supporting both domestic and international connectivity.

Conclusion: With the sanctioning of Rs 19 crore for a pre-feasibility study, Andhra Pradesh is taking a significant step toward improving its infrastructure. The planned airport aims to foster regional connectivity, economic development, and improved transport links, aligning with the state’s broader growth objectives.

Key Highlights from the Report: Sanction of Rs 19 Crore: The Andhra Pradesh government has approved a budget of Rs 19 crore for the pre-feasibility study of a new airport. This initiative is part of the state’s vision to strengthen its transport infrastructure and improve air connectivity to support economic growth. Objective of the Study: The pre-feasibility study will assess various aspects of airport development, including location, technical feasibility, environmental impact, and cost-benefit analysis. This detailed analysis is expected to provide crucial insights into the viability of establishing a new airport in the region. Boosting Regional Connectivity: The proposed airport aims to enhance regional air connectivity, making it easier for both passengers and freight to move efficiently within and outside the state. This move is expected to improve the overall transportation network, benefiting tourism, trade, and industry. Infrastructure Growth Plans: The state government has recognized the need for improved infrastructure to support economic activities. A new airport could open up new opportunities for business, tourism, and employment, contributing to Andhra Pradesh’s development trajectory. Potential Locations: Although the exact location for the new airport is yet to be finalized, the study will identify the most suitable sites based on factors such as accessibility, land availability, and proximity to economic hubs in the state. Government’s Vision for Growth: The decision to invest in the pre-feasibility study underscores the Andhra Pradesh government's commitment to advancing its infrastructure and boosting regional development. The new airport could become a key asset in the state’s transportation network, supporting both domestic and international connectivity. Conclusion: With the sanctioning of Rs 19 crore for a pre-feasibility study, Andhra Pradesh is taking a significant step toward improving its infrastructure. The planned airport aims to foster regional connectivity, economic development, and improved transport links, aligning with the state’s broader growth objectives.

Next Story
Infrastructure Energy

Adani Green Adds 212.5 MW Solar in Gujarat

Adani Green Energy Ltd. has commissioned a 212.5 MW solar power project at Khavda, Gujarat, through its subsidiary Adani Renewable Energy Fifty Seven Ltd. This addition brings Adani Green's total operational renewable capacity to 13,700 MW, as per a stock exchange filing. Last month, Adani Green became India's first renewable energy company to cross 12,000 MW of operational capacity. The company is also developing the world's largest 30,000 MW renewable energy plant in Khavda, spanning 538 sq km—about five times the size of Paris and nearly as large as Mumbai. Upon completion, it will be th..

Next Story
Infrastructure Energy

ONGC NTPC Green Acquires Ayana for Rs 62.5 Billion

ONGC NTPC Green Pvt Ltd (ONGPL) has completed the Rs 62.5 billion acquisition of Ayana Renewable Power, securing a 100% equity stake. The 50:50 joint venture between NTPC Green Energy Ltd (NGEL) and ONGC Green Ltd finalized the deal. NGEL contributed Rs 31.2 billion toward the acquisition, aligning with its goal to achieve 60 GW of renewable capacity by 2032. Ayana, a key player in India's green energy sector, has a 4,112 MW portfolio, with 2,123 MW operational and 1,989 MW under construction. Its projects are backed by high-credit-rated buyers, including SECI, NTPC, GUVNL, and Indian Railw..

Next Story
Infrastructure Transport

Cabinet Approves Rs 37.1 Billion Patna-Sasaram Corridor

The Union Cabinet has approved the construction of a four-lane access-controlled Patna-Sasaram corridor in Bihar at an estimated cost of Rs 37.1 billion. The 120.1 km project, to be developed under the Hybrid Annuity Mode (HAM), aims to ease congestion and enhance connectivity. Currently, travel between Sasaram, Arrah, and Patna takes 3-4 hours due to heavy traffic on state highways. The new corridor will integrate greenfield and 10.6 km of brownfield upgrades, linking key cities such as Arrah, Grahini, Piro, Bikramganj, Mokar, and Sasaram. The project will connect NH-19, NH-319, NH-922, NH-..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?