+
Goa starts aligning 2011 maps with survey plans
ECONOMY & POLICY

Goa starts aligning 2011 maps with survey plans

The directorate of settlement and land records (DSLR) has initiated a comparison between CZMP 2011 maps and state survey maps in order to rectify anomalies and finalize the Coastal Zone Management Plan (CZMP) for 2019.

A senior official stated that once the maps are prepared, they would be forwarded to the National Centre for Sustainable Coastal Management (NCSCM) in Chennai for corrections to be made in CZMP 2011. Following the notification of the final plans, the work on CZMP 2019 will commence. The directorate will identify features such as mangroves, sand dunes, etc., on the maps.

The discrepancies noted include village boundaries, survey plots, roads, khazan lands, and water bodies not being accurately superimposed. Additionally, the high tide line has shifted towards land.

In the meantime, the directorate, which had its plans digitized in its proprietary format, opted to convert the data into shapefiles. After completing this task, an API link was shared with the NCSCM on May 15 to ensure proper delineation of the high tide line and low tide line on the state's notified survey plans.

The Coastal Regulation Zone (CRZ) notification of 2011 mandates the notification of maps in the scale of 1:25,000. These maps were notified in November 2022. Chief Minister Pramod Sawant had mentioned, "As these maps were not legible and local-level CZMP maps are required for use by local bodies and other agencies to facilitate implementation of CZMPs, we requested the NCSCM to generate these maps in the scale of 1:4,000."

Subsequently, the NCSCM provided the maps in the scale of 1:4,000. These maps underwent scrutiny by directorate officials, revealing certain discrepancies. Efforts were made by the government to address these discrepancies through the NCSCM. However, since the maps in the scale of 1:25,000 had already been notified, the NCSCM stated that no changes could be made to these areas without the approval of the Union Environment Ministry, as the Union government had already approved the Goa CZMP on the 1:25,000 scale, including features such as the high-tide line, low-tide line, CRZ, khazans, etc.

"If the superimposition is not done in accordance with the notified survey plan of our state, which is available on the 'BhuNaksha' platform, it would result in multiple legal proceedings, and the traditional community would be adversely affected," Sawant remarked.

Moreover, without rectifying CZMP 2011, the agency responsible for preparing CZMP 2019 would be unable to finalise it, as errors would persist in the 2019 map.

The directorate of settlement and land records (DSLR) has initiated a comparison between CZMP 2011 maps and state survey maps in order to rectify anomalies and finalize the Coastal Zone Management Plan (CZMP) for 2019. A senior official stated that once the maps are prepared, they would be forwarded to the National Centre for Sustainable Coastal Management (NCSCM) in Chennai for corrections to be made in CZMP 2011. Following the notification of the final plans, the work on CZMP 2019 will commence. The directorate will identify features such as mangroves, sand dunes, etc., on the maps. The discrepancies noted include village boundaries, survey plots, roads, khazan lands, and water bodies not being accurately superimposed. Additionally, the high tide line has shifted towards land. In the meantime, the directorate, which had its plans digitized in its proprietary format, opted to convert the data into shapefiles. After completing this task, an API link was shared with the NCSCM on May 15 to ensure proper delineation of the high tide line and low tide line on the state's notified survey plans. The Coastal Regulation Zone (CRZ) notification of 2011 mandates the notification of maps in the scale of 1:25,000. These maps were notified in November 2022. Chief Minister Pramod Sawant had mentioned, As these maps were not legible and local-level CZMP maps are required for use by local bodies and other agencies to facilitate implementation of CZMPs, we requested the NCSCM to generate these maps in the scale of 1:4,000. Subsequently, the NCSCM provided the maps in the scale of 1:4,000. These maps underwent scrutiny by directorate officials, revealing certain discrepancies. Efforts were made by the government to address these discrepancies through the NCSCM. However, since the maps in the scale of 1:25,000 had already been notified, the NCSCM stated that no changes could be made to these areas without the approval of the Union Environment Ministry, as the Union government had already approved the Goa CZMP on the 1:25,000 scale, including features such as the high-tide line, low-tide line, CRZ, khazans, etc. If the superimposition is not done in accordance with the notified survey plan of our state, which is available on the 'BhuNaksha' platform, it would result in multiple legal proceedings, and the traditional community would be adversely affected, Sawant remarked. Moreover, without rectifying CZMP 2011, the agency responsible for preparing CZMP 2019 would be unable to finalise it, as errors would persist in the 2019 map.

Next Story
Infrastructure Urban

Naidu Seeks Rs 563 Crore For AP Sports Infrastructure

Andhra Pradesh Chief Minister N Chandrababu Naidu has sought Rs 563 crore from the Centre to boost sports infrastructure in the state, including Rs 538 crore for stadium development and Rs 25 crore to host the Khelo India Martial Arts Games 2025. Naidu made the request during a meeting with Union Youth Services and Sports Minister Mansukh Mandaviya in New Delhi on Wednesday.The CM urged early completion of Khelo India infrastructure projects in Tirupati, Rajahmundry, Kakinada, and Narasaraopeta, and called for an international-standard badminton training centre and a national aquatic sports hu..

Next Story
Infrastructure Transport

Tough Bidding Norms Slow NHAI Road Project Awards

Stringent bidding rules imposed by the Ministry of Road Transport & Highways (MoRTH) have led to a slowdown in project awards by the National Highways Authority of India (NHAI), despite a robust Rs 3.5 trillion pipeline. According to an HDFC Securities report, the shift to more cautious developer models now favours firms with strong balance sheets, as tighter qualification norms limit aggressive bidders.The revised norms mandate additional performance security, targeting the exclusion of players that previously submitted low bids—often 25 to 40 per cent below NHAI cost estimates—raisin..

Next Story
Infrastructure Transport

Mumbai Gets Coastal Nod for Next Promenade Phase

As Mumbai prepares to open two major sections of its expansive seafront promenade this week, the city’s civic authority has secured a key coastal clearance to advance further construction. The Maharashtra Coastal Zone Management Authority (MCZMA) has approved the commencement of work on the segment between Haji Ali and Baroda Palace, with tendering expected soon after project cost assessments.The promenade, stretching 7.5 km in length and 20 metres wide, is being designed as a flagship open space for walkers, joggers, and cyclists. Two critical stretches—2.75 km from Tata Garden to Haji Al..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?