+
Goa starts aligning 2011 maps with survey plans
ECONOMY & POLICY

Goa starts aligning 2011 maps with survey plans

The directorate of settlement and land records (DSLR) has initiated a comparison between CZMP 2011 maps and state survey maps in order to rectify anomalies and finalize the Coastal Zone Management Plan (CZMP) for 2019.

A senior official stated that once the maps are prepared, they would be forwarded to the National Centre for Sustainable Coastal Management (NCSCM) in Chennai for corrections to be made in CZMP 2011. Following the notification of the final plans, the work on CZMP 2019 will commence. The directorate will identify features such as mangroves, sand dunes, etc., on the maps.

The discrepancies noted include village boundaries, survey plots, roads, khazan lands, and water bodies not being accurately superimposed. Additionally, the high tide line has shifted towards land.

In the meantime, the directorate, which had its plans digitized in its proprietary format, opted to convert the data into shapefiles. After completing this task, an API link was shared with the NCSCM on May 15 to ensure proper delineation of the high tide line and low tide line on the state's notified survey plans.

The Coastal Regulation Zone (CRZ) notification of 2011 mandates the notification of maps in the scale of 1:25,000. These maps were notified in November 2022. Chief Minister Pramod Sawant had mentioned, "As these maps were not legible and local-level CZMP maps are required for use by local bodies and other agencies to facilitate implementation of CZMPs, we requested the NCSCM to generate these maps in the scale of 1:4,000."

Subsequently, the NCSCM provided the maps in the scale of 1:4,000. These maps underwent scrutiny by directorate officials, revealing certain discrepancies. Efforts were made by the government to address these discrepancies through the NCSCM. However, since the maps in the scale of 1:25,000 had already been notified, the NCSCM stated that no changes could be made to these areas without the approval of the Union Environment Ministry, as the Union government had already approved the Goa CZMP on the 1:25,000 scale, including features such as the high-tide line, low-tide line, CRZ, khazans, etc.

"If the superimposition is not done in accordance with the notified survey plan of our state, which is available on the 'BhuNaksha' platform, it would result in multiple legal proceedings, and the traditional community would be adversely affected," Sawant remarked.

Moreover, without rectifying CZMP 2011, the agency responsible for preparing CZMP 2019 would be unable to finalise it, as errors would persist in the 2019 map.

The directorate of settlement and land records (DSLR) has initiated a comparison between CZMP 2011 maps and state survey maps in order to rectify anomalies and finalize the Coastal Zone Management Plan (CZMP) for 2019. A senior official stated that once the maps are prepared, they would be forwarded to the National Centre for Sustainable Coastal Management (NCSCM) in Chennai for corrections to be made in CZMP 2011. Following the notification of the final plans, the work on CZMP 2019 will commence. The directorate will identify features such as mangroves, sand dunes, etc., on the maps. The discrepancies noted include village boundaries, survey plots, roads, khazan lands, and water bodies not being accurately superimposed. Additionally, the high tide line has shifted towards land. In the meantime, the directorate, which had its plans digitized in its proprietary format, opted to convert the data into shapefiles. After completing this task, an API link was shared with the NCSCM on May 15 to ensure proper delineation of the high tide line and low tide line on the state's notified survey plans. The Coastal Regulation Zone (CRZ) notification of 2011 mandates the notification of maps in the scale of 1:25,000. These maps were notified in November 2022. Chief Minister Pramod Sawant had mentioned, As these maps were not legible and local-level CZMP maps are required for use by local bodies and other agencies to facilitate implementation of CZMPs, we requested the NCSCM to generate these maps in the scale of 1:4,000. Subsequently, the NCSCM provided the maps in the scale of 1:4,000. These maps underwent scrutiny by directorate officials, revealing certain discrepancies. Efforts were made by the government to address these discrepancies through the NCSCM. However, since the maps in the scale of 1:25,000 had already been notified, the NCSCM stated that no changes could be made to these areas without the approval of the Union Environment Ministry, as the Union government had already approved the Goa CZMP on the 1:25,000 scale, including features such as the high-tide line, low-tide line, CRZ, khazans, etc. If the superimposition is not done in accordance with the notified survey plan of our state, which is available on the 'BhuNaksha' platform, it would result in multiple legal proceedings, and the traditional community would be adversely affected, Sawant remarked. Moreover, without rectifying CZMP 2011, the agency responsible for preparing CZMP 2019 would be unable to finalise it, as errors would persist in the 2019 map.

Next Story
Resources

RECPDCL Signs Pact to Roll Out 33.26 Lakh Smart Meters in Gujarat

REC Power Development and Consultancy (RECPDCL), a wholly owned subsidiary of REC, has signed key agreements for the installation of 33.26 lakh smart prepaid meters in Gujarat under the RDSS Phase-II scheme. The project will be implemented in the jurisdiction of Paschim Gujarat Vij Company (PGVCL) on a DBFOOT basis. The agreements — including the PIA and DDF contracts — were signed between RECPDCL and M/s Bharat Grid, a joint venture between Actis and EDF India, the appointed Advanced Metering Infrastructure Service Provider (AMISP). The signing took place in Rajkot in the presen..

Next Story
Real Estate

Omaxe to Develop 450-Acre Township in Indore’s Super Corridor

Omaxe has announced a major expansion in Madhya Pradesh with the acquisition of 450 acres along Indore’s Super Corridor for a modern integrated township. The company will invest Rs 12 billion in the multi-phase project, which is expected to generate Rs 25 billion in revenue over three years.  The development will include residential clusters, commercial and retail zones, schools, healthcare facilities, parks, and green mobility infrastructure. The township aims to support the region’s urban growth and rising infrastructure demand, especially with metro connectivity and major road..

Next Story
Infrastructure Energy

India’s First CBG Plant with Steel Pipeline Integration Launched

CEID Consultants and Engineering has successfully commissioned India’s first Compressed Biogas (CBG) plant integrated via a steel pipeline into a City Gas Distribution (CGD) network. Located in Batala, Gurdaspur (Punjab), the MEPL Bio-energy facility now directly supplies CBG into Gujarat Gas’ grid, eliminating the need for cylinder-based cascade transport and significantly lowering logistics costs. This breakthrough comes after CEID’s earlier deployment of MDPE pipeline offtake at the same plant. The steel pipeline marks a new industry benchmark, enabling continuous, real-time and ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?