Goa starts aligning 2011 maps with survey plans
ECONOMY & POLICY

Goa starts aligning 2011 maps with survey plans

The directorate of settlement and land records (DSLR) has initiated a comparison between CZMP 2011 maps and state survey maps in order to rectify anomalies and finalize the Coastal Zone Management Plan (CZMP) for 2019.

A senior official stated that once the maps are prepared, they would be forwarded to the National Centre for Sustainable Coastal Management (NCSCM) in Chennai for corrections to be made in CZMP 2011. Following the notification of the final plans, the work on CZMP 2019 will commence. The directorate will identify features such as mangroves, sand dunes, etc., on the maps.

The discrepancies noted include village boundaries, survey plots, roads, khazan lands, and water bodies not being accurately superimposed. Additionally, the high tide line has shifted towards land.

In the meantime, the directorate, which had its plans digitized in its proprietary format, opted to convert the data into shapefiles. After completing this task, an API link was shared with the NCSCM on May 15 to ensure proper delineation of the high tide line and low tide line on the state's notified survey plans.

The Coastal Regulation Zone (CRZ) notification of 2011 mandates the notification of maps in the scale of 1:25,000. These maps were notified in November 2022. Chief Minister Pramod Sawant had mentioned, "As these maps were not legible and local-level CZMP maps are required for use by local bodies and other agencies to facilitate implementation of CZMPs, we requested the NCSCM to generate these maps in the scale of 1:4,000."

Subsequently, the NCSCM provided the maps in the scale of 1:4,000. These maps underwent scrutiny by directorate officials, revealing certain discrepancies. Efforts were made by the government to address these discrepancies through the NCSCM. However, since the maps in the scale of 1:25,000 had already been notified, the NCSCM stated that no changes could be made to these areas without the approval of the Union Environment Ministry, as the Union government had already approved the Goa CZMP on the 1:25,000 scale, including features such as the high-tide line, low-tide line, CRZ, khazans, etc.

"If the superimposition is not done in accordance with the notified survey plan of our state, which is available on the 'BhuNaksha' platform, it would result in multiple legal proceedings, and the traditional community would be adversely affected," Sawant remarked.

Moreover, without rectifying CZMP 2011, the agency responsible for preparing CZMP 2019 would be unable to finalise it, as errors would persist in the 2019 map.

The directorate of settlement and land records (DSLR) has initiated a comparison between CZMP 2011 maps and state survey maps in order to rectify anomalies and finalize the Coastal Zone Management Plan (CZMP) for 2019. A senior official stated that once the maps are prepared, they would be forwarded to the National Centre for Sustainable Coastal Management (NCSCM) in Chennai for corrections to be made in CZMP 2011. Following the notification of the final plans, the work on CZMP 2019 will commence. The directorate will identify features such as mangroves, sand dunes, etc., on the maps. The discrepancies noted include village boundaries, survey plots, roads, khazan lands, and water bodies not being accurately superimposed. Additionally, the high tide line has shifted towards land. In the meantime, the directorate, which had its plans digitized in its proprietary format, opted to convert the data into shapefiles. After completing this task, an API link was shared with the NCSCM on May 15 to ensure proper delineation of the high tide line and low tide line on the state's notified survey plans. The Coastal Regulation Zone (CRZ) notification of 2011 mandates the notification of maps in the scale of 1:25,000. These maps were notified in November 2022. Chief Minister Pramod Sawant had mentioned, As these maps were not legible and local-level CZMP maps are required for use by local bodies and other agencies to facilitate implementation of CZMPs, we requested the NCSCM to generate these maps in the scale of 1:4,000. Subsequently, the NCSCM provided the maps in the scale of 1:4,000. These maps underwent scrutiny by directorate officials, revealing certain discrepancies. Efforts were made by the government to address these discrepancies through the NCSCM. However, since the maps in the scale of 1:25,000 had already been notified, the NCSCM stated that no changes could be made to these areas without the approval of the Union Environment Ministry, as the Union government had already approved the Goa CZMP on the 1:25,000 scale, including features such as the high-tide line, low-tide line, CRZ, khazans, etc. If the superimposition is not done in accordance with the notified survey plan of our state, which is available on the 'BhuNaksha' platform, it would result in multiple legal proceedings, and the traditional community would be adversely affected, Sawant remarked. Moreover, without rectifying CZMP 2011, the agency responsible for preparing CZMP 2019 would be unable to finalise it, as errors would persist in the 2019 map.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?