
Assam CM Orders Road Repairs to Boost Tourism and Economy with Bhutan

Kerala Launches India’s First Drug Disposal Initiative
Kerala is set to roll out nPROUD (New Programme for Removal of Unused Drugs), India's first initiative to collect and scientifically dispose of expired and unused medicines. Health Minister Veena George will inaugurate the project on February 22 in Kozhikode. The pilot phase will begin in Ulliyeri panchayat under Kozhikode Corporation before expanding statewide. The initiative aims to curb environmental pollution, health risks, and antimicrobial resistance caused by improper disposal of medicines. “Expired and unused medicines should not be thrown carelessly into the soil and water bodies,..

Hyderabad’s Smart Sewer System to Prevent Fatalities
Hyderabad has introduced a smart sewer monitoring system designed to detect toxic gases and sewage overflows, reducing the risks associated with manual scavenging. Equipped with gas and water level sensors, the system identifies hazardous gases like methane, ammonia, and hydrogen sulfide while sending real-time alerts to authorities for swift intervention. “The system is equipped with gas and water level sensors to detect toxic gases such as methane, ammonia and hydrogen sulfide while also identifying sewage overflows. It sends real-time alerts to authorities, enabling swift action and help..

MMRDA to Build Elevated Road on Eastern Express Highway
The Mumbai Metropolitan Region Development Authority (MMRDA) has announced the construction of an 8.24-km elevated road along the Eastern Express Highway, connecting Anand Nagar to Saket in Thane. The six-lane corridor, with three lanes in each direction, aims to decongest traffic by providing an alternative route for vehicles bypassing Thane. "The elevated road will commence from Anand Nagar, within Mumbai’s limits, and extend up to the Kharegaon Toll Naka. The project has an estimated cost of Rs 21.88 billion and is expected to be completed in 48 months, including a 24-month defect liabili..