MONSOON IDEAL PAINTS
Paint

MONSOON IDEAL PAINTS

Kamdhenu Paints´ range of water based premium exterior as well as internal emulsion products have exceptional moisture check formula. This world-class technology keeps the walls unaffected through high humidity alternating between torrential rains and scorching heat. Its exterior emulsion products deflect the harsh effect of sun-rays and also forms a protective membrane that repels water before it can permeate into to the inner layers, while its low-VOC interior water based emulsion products ensure unfading beauty of the walls with its anti-fungal and bacteria resistant features. Exhibiting washability, excellent sheen and best-in-class visco-elastic properties, these cost-effective interior paint products are ideal for the monsoons.

Contact: Kamdhenu Paints.

Tel: 0124-460 4500.

Website: www.kamdhenupaints.com

Kamdhenu Paints´ range of water based premium exterior as well as internal emulsion products have exceptional moisture check formula. This world-class technology keeps the walls unaffected through high humidity alternating between torrential rains and scorching heat. Its exterior emulsion products deflect the harsh effect of sun-rays and also forms a protective membrane that repels water before it can permeate into to the inner layers, while its low-VOC interior water based emulsion products ensure unfading beauty of the walls with its anti-fungal and bacteria resistant features. Exhibiting washability, excellent sheen and best-in-class visco-elastic properties, these cost-effective interior paint products are ideal for the monsoons. Contact: Kamdhenu Paints. Tel: 0124-460 4500. Website: www.kamdhenupaints.com

Next Story
Infrastructure Urban

Canal Water Boost for Mudki

In a significant push for public health and urban development, MLA Rajneesh Dahiya has announced a Rs.280 million canal water supply project for Mudki town in the Ferozepur Rural constituency. The initiative aims to provide clean drinking water to every household within Mudki’s municipal limits. Speaking about the development, Dahiya said the project falls under the Centre’s AMRUT (Atal Mission for Rejuvenation and Urban Transformation) scheme and is being carried out with the support of Punjab Chief Minister Bhagwant Singh Mann and Local Government Minister Dr. Inderbir Nijjar. “This ..

Next Story
Infrastructure Transport

6 Tunnel Boring Machines Idle in Chennai

Six tunnel boring machines (TBMs) deployed by the Chennai Metro Rail Limited (CMRL) are currently lying idle beneath city roads, stuck in limbo due to delayed construction of underground stations at Moolakadai, Perambur, and Mandaveli. The TBMs, launched as part of Corridor 3 of the Phase II Metro project from Madhavaram to SIPCOT, have reached their designated stations but are unable to proceed as the station boxes are incomplete. Without a completed diaphragm wall or station box, the machines cannot break through or be dismantled for reuse. According to CMRL officials, the root of the dela..

Next Story
Infrastructure Transport

Mumbai Metro 3 Nears Launch

The Mumbai Metro Rail Corporation shared a sneak peek of the newly completed Acharya Atre Chowk station on Metro Line 3 (Aqua Line) this Sunday, drawing both praise and impatience from the public. Located on the 9.77 km stretch between Bandra Kurla Complex (BKC) and Worli, the underground station is part of a long-anticipated corridor that promises to ease traffic and boost east-west connectivity. The social media update, posted by the handle @MumbaiMetro3, featured images of the station’s sleek new interiors. But the post quickly sparked a flurry of comments, with several users demanding c..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?