+
Pristine and brand-focused look!
Lighting

Pristine and brand-focused look!

Zyeta delivers a state-of-the-art design by bringing to life a peerless, collaboration-focused work environment.

The client: An esteemed Fortune 500 organisation that is a prominent and global leader in elevator manufacturing
The client’s lead design center in Hyderabad required a symmetrical workplace necessary to offer a logical division between its various areas, at the same time ensuring a smooth workflow. These included the R&D Department with workstations and meeting rooms, among others. The design also featured a unique “Exhibit Space” meant to highlight and demonstrate company branding. The design center also had to maintain high standards of sustainability, specifically LEED benchmarks.

The design strategy: Generate symmetry, transparency and an innovative showcase for the company
The design logically separated the service areas (namely, the lift and service blocks) and the central workspace. Increased emphasis on both allowed for a smooth and uninterrupted workflow. The service space also gave employees plenty of locations for collaboration. The R&D section of the floor - 500 sq m in general - offered a sleek minimalist design. This gave credibility to the mechanically innovative nature of the company. The exhibit space - on the other hand - offered a self-contained, multi-layered demonstration of the company’s brand and products. This consisted of a live-scale lift model, VR demonstration, and other impressive features.

Flooring blueprint: Giving prominence to each particular area, removing barriers and discrepancies
The floor area was complemented by the outstanding exterior view which brings plenty of natural light inside. Nearly 50 per cent of the space is dedicated to the service area eliminating any possible service disruptions. Carpet tiles from Shaw Contract helped connect the various nodes in the design, including all the formal and informal spaces. 

The scrum and huddle spaces, meanwhile, were defined by the accent carpet series which helped in highlighting the nodes and various function spaces. The flooring design of the corridors and various other common areas as defined by the plank carpet series. In themselves, the corridors were designed in a way that provided symmetry and direction for the people on each floor. A total of 15 meeting rooms gave more stability and balance to the floor.

The sustainable design reduces annual energy and water consumption by 20 per cent and 40 per cent respectively. It also features a 10-15 per cent improvement in the overall ecological footprint.

Result: A state-of-the-art office that juxtaposes logical thinking and artistic flourishes
Creative minds can find balance and uniformity in the workplace as well. The branding colours and material palette served to further enhance the positive vibes. Overall, the smooth layout created a hierarchy-less atmosphere that encouraged collaboration and creativity.

 

“There is a sense of mindfulness in even the busiest corners of the office, and that makes it unique.”- Kishore Manoharan, Lead Designer, Zyeta

Zyeta delivers a state-of-the-art design by bringing to life a peerless, collaboration-focused work environment.The client: An esteemed Fortune 500 organisation that is a prominent and global leader in elevator manufacturingThe client’s lead design center in Hyderabad required a symmetrical workplace necessary to offer a logical division between its various areas, at the same time ensuring a smooth workflow. These included the R&D Department with workstations and meeting rooms, among others. The design also featured a unique “Exhibit Space” meant to highlight and demonstrate company branding. The design center also had to maintain high standards of sustainability, specifically LEED benchmarks.The design strategy: Generate symmetry, transparency and an innovative showcase for the companyThe design logically separated the service areas (namely, the lift and service blocks) and the central workspace. Increased emphasis on both allowed for a smooth and uninterrupted workflow. The service space also gave employees plenty of locations for collaboration. The R&D section of the floor - 500 sq m in general - offered a sleek minimalist design. This gave credibility to the mechanically innovative nature of the company. The exhibit space - on the other hand - offered a self-contained, multi-layered demonstration of the company’s brand and products. This consisted of a live-scale lift model, VR demonstration, and other impressive features.Flooring blueprint: Giving prominence to each particular area, removing barriers and discrepanciesThe floor area was complemented by the outstanding exterior view which brings plenty of natural light inside. Nearly 50 per cent of the space is dedicated to the service area eliminating any possible service disruptions. Carpet tiles from Shaw Contract helped connect the various nodes in the design, including all the formal and informal spaces. The scrum and huddle spaces, meanwhile, were defined by the accent carpet series which helped in highlighting the nodes and various function spaces. The flooring design of the corridors and various other common areas as defined by the plank carpet series. In themselves, the corridors were designed in a way that provided symmetry and direction for the people on each floor. A total of 15 meeting rooms gave more stability and balance to the floor.The sustainable design reduces annual energy and water consumption by 20 per cent and 40 per cent respectively. It also features a 10-15 per cent improvement in the overall ecological footprint.Result: A state-of-the-art office that juxtaposes logical thinking and artistic flourishesCreative minds can find balance and uniformity in the workplace as well. The branding colours and material palette served to further enhance the positive vibes. Overall, the smooth layout created a hierarchy-less atmosphere that encouraged collaboration and creativity.  “There is a sense of mindfulness in even the busiest corners of the office, and that makes it unique.”- Kishore Manoharan, Lead Designer, Zyeta

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App