Drones: A valuable tool for the construction jobsite
Technology

Drones: A valuable tool for the construction jobsite

Aerial imaging and data gathering via drone is not just a luxury these days, it’s a necessity. Aerial drone data delivers valuable insights during every construction phase, from pre construction bids to site handoff. There are many ways drones help construction managers save time and money every day.

Orthomosaics


“Orthos” are made by collecting hundreds of photos in a pre planned flight pattern and altitude. Then, the existing images are stitched together into one high resolution image. These very high resolution images offer a high level look at the entire site without having to leave the workspace. Benefits include:

  • Import capability into industry software such as BIM, GIS and CAD for more advanced oversight and
  • Foundation documentations such as pre-pour certification of what’s inside slabs, the quality of rebar installs and post-tensioning cables;
  • Façade/structure inspections with no scaffolding and crane inspections with no lock-out/tag-out; and
  • Landscaping insight on water reach, drainage, final grading and landscape features along with documenting “As Built” conditions before handoff.

Volume calculations


Volume calculations give a fast and simple way to measure how much dirt or material is in each pile keeping inventory and off-haul costs accurate. Earthpile volumes and stockpile counts can be calculated with no ground control or benchmarks simply by using parallax, or the offset between photos of the same image in Orthomosaics. Most stitching software can calculate volumes automatically; contractors should make sure theirs is among those that does.

Overlays


For overlays, contractors are dependent on having access to the plans. Overlays are helpful in several ways including:

  • Helping to reduce rework for utility pathways and documenting in ground utilities; and
  • Visually showing position of site plans for utility, runoff and equipment clearances on the actual site as it develops and comparing real time site conditions against the plans.

This can help catch conflicts early and correct them before they become big problems later.

Contours

Contour measurements allow for more active and competitive pre bids and accurate site balancing for final grading. To calculate contours, lay ground control points and fly a precision mission. Not all software can provide accurate contours, so make the chosen software can.

Progress photos


Progress photos are one of the easiest items to capture and deliver. The key is to deliver photos from the same angles and altitudes each time so that clients can easily recognise specific progress each time. In most cases, these flights can be automated so that they can be repeated. However, keep in mind that using programmed flight routes and angles can be dangerous with constantly changing site altitudes and crane heights and positions. The standard way of accomplishing this task is to automate the task but on the day of any flight, double check altitudes and use a drone with obstacle avoidance systems.

Be sure to include shots of any new progress, perceived problem areas and especially anything that may have been a challenge.

Video

Owners may not make it to the site often, and a video keeps them engaged with their “baby” as building progresses. Editing the video can be challenging if one has never done it before, but there are plenty of free tutorials and free software that will allow the project to be completed.

Questions to ask before flying the site for commercial purposes

Is the pilot certified by the FAA? The pilot needs FAA Part 107 certification to legally fly the site.

Is the airspace clear for flight? If the jobsite is in controlled or restricted airspace, pilots must obtain an authorisation or waiver to fly there. If the contractor hires an unlicensed pilot or allows the pilot to fly without proper authorisation on a site, the contractor could be held liable for non compliance.

Does the drone service provider have insurance? A drone service provider (even if they work for the company) should have a standard policy of at least $1 million in liability with $10 million not uncommon for construction site drone operators. Just like with everything else, insurance is not important until it is needed.

What is the pilot’s experience with active construction sites? Apart from insurance, this is probably the most important question of them all. Flying a busy site with constantly moving heavy machinery and open hazards requires experience, concentration and a safety first mentality. Make sure the drone pilot understands this and has the necessary experience before they add an aircraft to the equation.

What can the pilot provide and how will it be delivered? Drones can provide valuable insight quickly, safely and be very cost effective compared to traditional methods. However, too much data can be overwhelming. Know the goals ahead of time and work with the drone pilot to achieve those goals. Define the need for interpretation. If data analysis and reporting is needed, find a provider (or software) who has the resources to do this in the format needed.

How often is a flight needed? Whether it’s a weekly mission with a 24 hour turnaround or an unscheduled flight to document site conditions after a weather event, contractors need to know that they are going to get the service they want and need. Finding an experienced and capable drone provider can take time, but asking the right questions will put a contractor on the path to making these flights safe, and profitable.

Authors: Mike Sobola, Managing Partner, Mid-Atlantic Drones, LLC, is a private pilot and commercial drone pilot with Mid-Atlantic drones. Mike is a three-time Emmy winner. Luisa Winters, Managing Partner, Mid-Atlantic Drones, LLC, is a private pilot and commercial drone pilot with Mid-Atlantic drones. Luisa is a well known industry leader and often speaks at conferences and trade meetings.

Reprinted from Construction Executive (18 February 2021), a publication of Associated Builders and Contractors, copyright 2021. All rights reserved.

Editor’s note: Figures, conditions and agencies are US-based.

Aerial imaging and data gathering via drone is not just a luxury these days, it’s a necessity. Aerial drone data delivers valuable insights during every construction phase, from pre construction bids to site handoff. There are many ways drones help construction managers save time and money every day.Orthomosaics “Orthos” are made by collecting hundreds of photos in a pre planned flight pattern and altitude. Then, the existing images are stitched together into one high resolution image. These very high resolution images offer a high level look at the entire site without having to leave the workspace. Benefits include: Import capability into industry software such as BIM, GIS and CAD for more advanced oversight and Foundation documentations such as pre-pour certification of what’s inside slabs, the quality of rebar installs and post-tensioning cables; Façade/structure inspections with no scaffolding and crane inspections with no lock-out/tag-out; and Landscaping insight on water reach, drainage, final grading and landscape features along with documenting “As Built” conditions before handoff.Volume calculations Volume calculations give a fast and simple way to measure how much dirt or material is in each pile keeping inventory and off-haul costs accurate. Earthpile volumes and stockpile counts can be calculated with no ground control or benchmarks simply by using parallax, or the offset between photos of the same image in Orthomosaics. Most stitching software can calculate volumes automatically; contractors should make sure theirs is among those that does.Overlays For overlays, contractors are dependent on having access to the plans. Overlays are helpful in several ways including: Helping to reduce rework for utility pathways and documenting in ground utilities; and Visually showing position of site plans for utility, runoff and equipment clearances on the actual site as it develops and comparing real time site conditions against the plans. This can help catch conflicts early and correct them before they become big problems later.Contours Contour measurements allow for more active and competitive pre bids and accurate site balancing for final grading. To calculate contours, lay ground control points and fly a precision mission. Not all software can provide accurate contours, so make the chosen software can.Progress photos Progress photos are one of the easiest items to capture and deliver. The key is to deliver photos from the same angles and altitudes each time so that clients can easily recognise specific progress each time. In most cases, these flights can be automated so that they can be repeated. However, keep in mind that using programmed flight routes and angles can be dangerous with constantly changing site altitudes and crane heights and positions. The standard way of accomplishing this task is to automate the task but on the day of any flight, double check altitudes and use a drone with obstacle avoidance systems. Be sure to include shots of any new progress, perceived problem areas and especially anything that may have been a challenge.Video Owners may not make it to the site often, and a video keeps them engaged with their “baby” as building progresses. Editing the video can be challenging if one has never done it before, but there are plenty of free tutorials and free software that will allow the project to be completed.Questions to ask before flying the site for commercial purposes Is the pilot certified by the FAA? The pilot needs FAA Part 107 certification to legally fly the site. Is the airspace clear for flight? If the jobsite is in controlled or restricted airspace, pilots must obtain an authorisation or waiver to fly there. If the contractor hires an unlicensed pilot or allows the pilot to fly without proper authorisation on a site, the contractor could be held liable for non compliance. Does the drone service provider have insurance? A drone service provider (even if they work for the company) should have a standard policy of at least $1 million in liability with $10 million not uncommon for construction site drone operators. Just like with everything else, insurance is not important until it is needed. What is the pilot’s experience with active construction sites? Apart from insurance, this is probably the most important question of them all. Flying a busy site with constantly moving heavy machinery and open hazards requires experience, concentration and a safety first mentality. Make sure the drone pilot understands this and has the necessary experience before they add an aircraft to the equation. What can the pilot provide and how will it be delivered? Drones can provide valuable insight quickly, safely and be very cost effective compared to traditional methods. However, too much data can be overwhelming. Know the goals ahead of time and work with the drone pilot to achieve those goals. Define the need for interpretation. If data analysis and reporting is needed, find a provider (or software) who has the resources to do this in the format needed. How often is a flight needed? Whether it’s a weekly mission with a 24 hour turnaround or an unscheduled flight to document site conditions after a weather event, contractors need to know that they are going to get the service they want and need. Finding an experienced and capable drone provider can take time, but asking the right questions will put a contractor on the path to making these flights safe, and profitable. Authors: Mike Sobola, Managing Partner, Mid-Atlantic Drones, LLC, is a private pilot and commercial drone pilot with Mid-Atlantic drones. Mike is a three-time Emmy winner. Luisa Winters, Managing Partner, Mid-Atlantic Drones, LLC, is a private pilot and commercial drone pilot with Mid-Atlantic drones. Luisa is a well known industry leader and often speaks at conferences and trade meetings. Reprinted from Construction Executive (18 February 2021), a publication of Associated Builders and Contractors, copyright 2021. All rights reserved. Editor’s note: Figures, conditions and agencies are US-based.

Next Story
Infrastructure Transport

Cabinet Approves Key Highway and Rail Projects in Bihar Region

The Union Cabinet on Wednesday approved the four-laning of the 84.2-km Mokama-Munger section of the Buxar-Bhagalpur high-speed corridor, a key industrial region in poll-bound Bihar. The Cabinet also sanctioned the doubling of the 177-km Bhagalpur-Dumka-Rampurhat railway line, which passes through Bihar, Jharkhand, and West Bengal, at a cost of Rs 31.7 billion.The Rs 44.5 billion highway project will be constructed under the hybrid annuity model, a variant of public-private partnership. The Mokama-Munger stretch was the only remaining two-lane section of the 363-km Buxar-Bhagalpur corridor. Fou..

Next Story
Infrastructure Transport

NGT Issues Notice on Bengaluru Twin Tunnel Project

The National Green Tribunal (NGT) on Wednesday issued notices in response to a petition filed by Bengaluru Praja Vedike and others, challenging the Bengaluru twin tunnel road project. Petitioners claim the project was “hastily announced” and bypassed mandatory environmental impact assessment procedures.Notices have been served to the Karnataka Government, Greater Bengaluru Authority, State Environment Impact Assessment Authority (SEIAA), Bengaluru Smart Infrastructure Ltd (B-SMILE), the Union Ministry of Environment, Forest and Climate Change, and project consultants.The 16.74-km twin-tube..

Next Story
Real Estate

India’s Residential Sales to Dip Slightly in FY26

Residential sales in India’s seven major cities are projected to decline by up to 3 per cent year-on-year in FY26 to 620–640 million square feet (msf), amid a moderation in sales velocity, according to ratings agency Icra.In FY25, sales stood at 643 msf, down 8 per cent YoY, following a sharp contraction in new launches and moderated demand in the affordable and mid-income segments. This slowdown came after the sector posted a robust compound annual growth rate of 26 per cent in area sales between FY22 and FY24.Icra noted: “Having seen a strong upcycle, the sector entered an equilibrium ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?