Automated waste plant inaugurated in Greater Noida
WATER & WASTE

Automated waste plant inaugurated in Greater Noida

The automated waste plant at Greater Noida’s integrated industrial township became operational after it was inaugurated recently. The facility connects all manufacturing units to collect, segregate and treat waste automatedly. The plant has the capacity to segregate and recycle waste as well ...

The automated waste plant at Greater Noida’s integrated industrial township became operational after it was inaugurated recently. The facility connects all manufacturing units to collect, segregate and treat waste automatedly. The plant has the capacity to segregate and recycle waste as well as to produce methane gas at the plant that can be used to produce electricity for the township. No waste will be discharged into the soil. The authority has also set up an STP to treat the wastewater and recycle the same. Contact: Greater Noida Industrial Development Authority E-mail: authority@gnida.in Website: www.greaternoidaauthority.in

Next Story
Infrastructure Transport

Bengaluru’s Pink Line 95% Complete

Bengaluru Metro Rail Corporation Limited (BMRCL) has announced that 95% of the tunneling work for the Pink Line of Namma Metro is complete, with the 21-km stretch expected to be operational by 2026. The corridor runs from Kalena Agrahara in South Bengaluru to Nagawara in the North, including a 13.8-km underground section from Dairy Circle to Nagawara. BMRCL Chief Engineer (Underground), Subrahmanya Gudge, highlighted that the Pink Line stations will generally have only two entries, except MG Road Metro station, which will feature four to prevent road crossings. He also emphasized how lessons ..

Next Story
Infrastructure Transport

Jogighopa Terminal Boosts Trilateral Trade

Union Minister of Ports, Shipping and Waterways Sarbananda Sonowal inaugurated an Inland Waterways Terminal (IWT) on the Brahmaputra in Assam’s Jogighopa. The terminal, built at a cost of $9.8 million is set to enhance trade and connectivity in Eastern India. To mark the occasion, the Minister flagged off two ships, MV Padma Navigation-II and MV Trishul, and two barges, Ajay and Dikshu, carrying 110 metric tonnes of coal and stone chips to Bangladesh. “The IWT terminal at Jogighopa is set to transform the connectivity in the region and bolster our trilateral trade with Bhutan and Banglad..

Next Story
Infrastructure Transport

IRCON Wins $75M Mumbai Metro Line 6 Contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has declared IRCON International the lowest bidder for Package CA-233 of Mumbai Metro Line 6 (Pink Line), a 15.18 km corridor connecting Swami Samarth Nagar (Lokhandwala) to Vikhroli. MMRDA floated the tender in January 2024 with an estimated cost of $71 million. Four firms submitted bids, with three qualifying for the financial evaluation stage. IRCON emerged as the lowest bidder with an offer of $75 million—just 6.71% above MMRDA’s estimate. Financial Bids (? billion/million): IRCON International – Rs 6.27 billion ($75 mil..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?