GreenZo Energy to build 50 MW hydrogen power plant in Nepal
POWER & RENEWABLE ENERGY

GreenZo Energy to build 50 MW hydrogen power plant in Nepal

GreenZo Energy will be installing 50 MW worth of green hydrogen production facilities in Nepal. The capabilities would be for API Power of Nepal, which will be investing Rs.10 billion in the project. GreenZo Energy and API Power have signed an MoU for a three-year construction timeframe, wi...

GreenZo Energy will be installing 50 MW worth of green hydrogen production facilities in Nepal. The capabilities would be for API Power of Nepal, which will be investing Rs.10 billion in the project. GreenZo Energy and API Power have signed an MoU for a three-year construction timeframe, with the capacity to produce 4,000 MT of hydrogen annually. API Power has reportedly suggested using hydrogen initiative locations for current hydro and solar projects. project will serve as the launch site for the 1-MW pilot hydro project, as agreed upon by the two firms. Contact: GreenZo Energy Tel: 011-4370 8995 E-mail: info@greenzoenergy.com Website: greenzoenergy.com

Next Story
Infrastructure Urban

CONCOR Launches Double-stack Service Between NCR and Varnama

State-run Container Corporation of India (CONCOR) has launched double-stack container train services between the National Capital Region (NCR) and Varnama near Baroda. This initiative aims to facilitate customers at Nhava Sheva near Mumbai, home to Jawaharlal Nehru Port (J N Port). On December 21, the first double-stack container train from Khatuwas and Dadri in NCR reached CONCOR’s Gati Shakti Multimodal Cargo Terminal (GCT) at Varnama, situated along the Western Dedicated Freight Corridor (WDFC). The train carried export cargo destined for J N Port, according to a statement from the state..

Next Story
Infrastructure Transport

Less than 10% of Rs 40 Billion State-aid for Shipbuilding Utilised

A government-sanctioned financial assistance program worth Rs 40 billion, intended to support local shipbuilders over a decade starting in April 2016, has seen minimal utilisation, with only Rs 3.85 billion—less than 10 per cent of the total fund—disbursed thus far. With 15 months remaining before the scheme concludes, its uptake has been limited. The financial aid applies to shipbuilding contracts signed between April 1, 2016, and March 31, 2026. According to a written response provided by Union Minister of Ports, Shipping, and Waterways Sarbananda Sonowal to the Rajya Sabha on December ..

Next Story
Infrastructure Transport

Civil Aviation Minister Opens New ATC Tower at Indore Airport

The Minister for Civil Aviation, Ram Mohan Naidu Kinjarapu, inaugurated the new Air Traffic Control (ATC) Tower-cum-technical block at Devi Ahilyabai Holkar International Airport in Indore, Madhya Pradesh. During the inauguration, the minister toured the facility, where ATC experts explained various technical aspects of tracking and coordinating flights from the newly constructed tower. In addition to the ATC tower, the airport has also introduced a zero-waste plant. The union minister confirmed that this initiative aligns with the government’s commitment to sustainability. Minister Ki..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000