US Energy Landscape Set for Solar and Battery Dominance in 2024
POWER & RENEWABLE ENERGY

US Energy Landscape Set for Solar and Battery Dominance in 2024

The U.S. Energy Information Administration (EIA) has released its outlook for 2024, painting a picture of significant transformation in the nation's energy landscape. According to the latest ""Preliminary Monthly Electric Generator Inventory,"" solar and battery storage are set to take center stage, supported by wind, natural gas, and nuclear sources.

In the anticipated additions, solar power emerges as the frontrunner, accounting for 58% of the new capacity, closely followed by battery storage at 23%. This marks a significant shift towards renewable energy sources.

Utility-scale solar is projected to experience robust growth in 2024, with a staggering addition of 36.4 GW to the grid. This nearly doubles the previous year's increase, setting a new record for annual utility-scale solar installations in the U.S. Despite supply chain challenges and trade restrictions, solar power maintains its momentum, outpacing other generating resources.

The lion's share of the new utility-scale solar capacity is concentrated in Texas (35%), California (10%), and Florida (6%). Moreover, Nevada's Gemini project, combining 690 MW in photovoltaic and 380 MW in battery storage, is poised to become the largest solar project in the country upon full operation in 2024.

Battery storage is also set for a remarkable surge in 2024, with U.S. developers planning to add 14.3 GW, nearly doubling the existing capacity. Texas and California are expected to lead this expansion, contributing 82% of the new U.S. battery storage capacity. Notable projects like the Menifee Power Bank in Riverside, California, will play a crucial role in this acceleration.

Combined, solar and battery storage will contribute a significant 81% of new power capacity additions in 2024, signaling a shift towards a more sustainable and resilient energy infrastructure.

While wind capacity additions have slowed in recent years, operators anticipate an 8.2 GW increase in 2024. Offshore wind plants such as Vineyard Wind 1 off Massachusetts and South Fork Wind off New York's coast will bolster the wind energy landscape.

Looking ahead, the National Renewable Energy Laboratory (NREL) predicts wind energy deployment to reach 770 GW and solar 1,090 GW by 2050, representing substantial increases over current levels. The EIA also foresees solar power emerging as the primary driver of electricity generation growth in 2024 and 2025, with significant capacity additions on the horizon.

The year 2024 appears to mark a pivotal moment in the United States' energy transition, with renewables spearheading the charge towards a greener and more sustainable future.

The U.S. Energy Information Administration (EIA) has released its outlook for 2024, painting a picture of significant transformation in the nation's energy landscape. According to the latest Preliminary Monthly Electric Generator Inventory, solar and battery storage are set to take center stage, supported by wind, natural gas, and nuclear sources. In the anticipated additions, solar power emerges as the frontrunner, accounting for 58% of the new capacity, closely followed by battery storage at 23%. This marks a significant shift towards renewable energy sources. Utility-scale solar is projected to experience robust growth in 2024, with a staggering addition of 36.4 GW to the grid. This nearly doubles the previous year's increase, setting a new record for annual utility-scale solar installations in the U.S. Despite supply chain challenges and trade restrictions, solar power maintains its momentum, outpacing other generating resources. The lion's share of the new utility-scale solar capacity is concentrated in Texas (35%), California (10%), and Florida (6%). Moreover, Nevada's Gemini project, combining 690 MW in photovoltaic and 380 MW in battery storage, is poised to become the largest solar project in the country upon full operation in 2024. Battery storage is also set for a remarkable surge in 2024, with U.S. developers planning to add 14.3 GW, nearly doubling the existing capacity. Texas and California are expected to lead this expansion, contributing 82% of the new U.S. battery storage capacity. Notable projects like the Menifee Power Bank in Riverside, California, will play a crucial role in this acceleration. Combined, solar and battery storage will contribute a significant 81% of new power capacity additions in 2024, signaling a shift towards a more sustainable and resilient energy infrastructure. While wind capacity additions have slowed in recent years, operators anticipate an 8.2 GW increase in 2024. Offshore wind plants such as Vineyard Wind 1 off Massachusetts and South Fork Wind off New York's coast will bolster the wind energy landscape. Looking ahead, the National Renewable Energy Laboratory (NREL) predicts wind energy deployment to reach 770 GW and solar 1,090 GW by 2050, representing substantial increases over current levels. The EIA also foresees solar power emerging as the primary driver of electricity generation growth in 2024 and 2025, with significant capacity additions on the horizon. The year 2024 appears to mark a pivotal moment in the United States' energy transition, with renewables spearheading the charge towards a greener and more sustainable future.

Next Story
Infrastructure Urban

Canal Water Boost for Mudki

In a significant push for public health and urban development, MLA Rajneesh Dahiya has announced a Rs.280 million canal water supply project for Mudki town in the Ferozepur Rural constituency. The initiative aims to provide clean drinking water to every household within Mudki’s municipal limits. Speaking about the development, Dahiya said the project falls under the Centre’s AMRUT (Atal Mission for Rejuvenation and Urban Transformation) scheme and is being carried out with the support of Punjab Chief Minister Bhagwant Singh Mann and Local Government Minister Dr. Inderbir Nijjar. “This ..

Next Story
Infrastructure Transport

6 Tunnel Boring Machines Idle in Chennai

Six tunnel boring machines (TBMs) deployed by the Chennai Metro Rail Limited (CMRL) are currently lying idle beneath city roads, stuck in limbo due to delayed construction of underground stations at Moolakadai, Perambur, and Mandaveli. The TBMs, launched as part of Corridor 3 of the Phase II Metro project from Madhavaram to SIPCOT, have reached their designated stations but are unable to proceed as the station boxes are incomplete. Without a completed diaphragm wall or station box, the machines cannot break through or be dismantled for reuse. According to CMRL officials, the root of the dela..

Next Story
Infrastructure Transport

Mumbai Metro 3 Nears Launch

The Mumbai Metro Rail Corporation shared a sneak peek of the newly completed Acharya Atre Chowk station on Metro Line 3 (Aqua Line) this Sunday, drawing both praise and impatience from the public. Located on the 9.77 km stretch between Bandra Kurla Complex (BKC) and Worli, the underground station is part of a long-anticipated corridor that promises to ease traffic and boost east-west connectivity. The social media update, posted by the handle @MumbaiMetro3, featured images of the station’s sleek new interiors. But the post quickly sparked a flurry of comments, with several users demanding c..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?