Solar Power Plant Tender Released by JVVNL in Hanumangarh
POWER & RENEWABLE ENERGY

Solar Power Plant Tender Released by JVVNL in Hanumangarh

JODHPUR VIDYUT VITRAN NIGAM LTD. has released a tender for the Design, survey, supply, installation, testing, commissioning, operation & maintenance for 25 years (unless extended by both the parties on mutual agreement) from COD of grid connected solar power plants through RESCO mode, its associated 33kV OR, 11kV line to connect the plant with various 33/11kV sub-stations and RMS of solar power plants in VARIOUS subdivisions of HANUMANGARH Division Under HANUMANGARH Circle- Under PM-KUSUM.

Detailed scope of work:
Detailed site survey
Execution of land lease agreement applicable for 26 years, which includes 9 months project commissioning period (unless extended by both the parties on mutual agreement) between Land-Owner/Farmer and Solar Power Plant Developer on non-judicial stamp of applicable value for Rajasthan State and development of the land for the solar power project; (Note: In case of any dispute between the Land-Owner/ Farmer and the Bidder/ Solar Power Plant Developer, JDVVNL shall NOT take any responsibility on any dispute resolution or in any kind of discussions). Design, supply and installation of solar power plant near the concerned 33/11 kV substation of DISCOM, in line with requirements under MNRE guidelines; Supply and erection of associated 33 kV OR, 11kV line (as the case may be) connecting the solar power plant with concerned 33/11 kV substation (including bay, breakers and Detailed site survey; Testing and commissioning of plant & associated 33kV OR, 11kV line (as the case may be) by designated official(s) of JDVVNL Construction of control room or any other relative civil work (at the plant end) essential for Commissioning of Project.

Operation & maintenance of the solar power plant as well as 33kV / 11kV line (as the case may be) for 25 years (unless extended by both the parties on mutual agreement) from COD.

Injection of power at delivery point for 25 years at the awarded levelized tariff (Rs. per kWh) (inclusive of applicable taxes incl. GST, duties, etc.), extendable on mutual agreement.

The delivery point for solar power plant(s) having installed capacity upto 2.55 MWp shall be 11kV side and for installation capacity above 2.55 MWp, delivery point shall be 33kV side of the concerned 33/11 kV GSS of DISCOM.

Remote Monitoring of installed solar power plant through RMS for 25 years (unless extended by both the parties on mutual agreement).metering system at substation) as per design and specifications of DISCOM / MNRE / CEA

Both hard copy submission and online submission of scanned copy of the above documents is essential otherwise the bid (Technical Bid & Financial Bid) in electronic form will not be opened for that bidder.

A complete bid document can be downloaded from: https://eproc.rajasthan.gov.in/nicgep/app

The tender seeks Electrical Works worth Rs. 4,45,62,00,000 cr to be completed in 270 days. As per the tender, the bid validity will be 90 days, and it will be an open bidding process. The bid submission period began on July 17, 2023 and will end on August 16, 2023.

Essential details:

Project Estimated Value: ₹ 4,45,62,00,000
Product Category: Electrical Works
Bid Validity (Days): 270
Period of Work: 90 days
Tender ID: 2023_JdVVN_344853_1
Tender Ref. No.: TN-DSM-26
Payment mode: Offline
Form of contract: Item rate

JODHPUR VIDYUT VITRAN NIGAM LTD. has released a tender for the Design, survey, supply, installation, testing, commissioning, operation & maintenance for 25 years (unless extended by both the parties on mutual agreement) from COD of grid connected solar power plants through RESCO mode, its associated 33kV OR, 11kV line to connect the plant with various 33/11kV sub-stations and RMS of solar power plants in VARIOUS subdivisions of HANUMANGARH Division Under HANUMANGARH Circle- Under PM-KUSUM. Detailed scope of work: Detailed site survey Execution of land lease agreement applicable for 26 years, which includes 9 months project commissioning period (unless extended by both the parties on mutual agreement) between Land-Owner/Farmer and Solar Power Plant Developer on non-judicial stamp of applicable value for Rajasthan State and development of the land for the solar power project; (Note: In case of any dispute between the Land-Owner/ Farmer and the Bidder/ Solar Power Plant Developer, JDVVNL shall NOT take any responsibility on any dispute resolution or in any kind of discussions). Design, supply and installation of solar power plant near the concerned 33/11 kV substation of DISCOM, in line with requirements under MNRE guidelines; Supply and erection of associated 33 kV OR, 11kV line (as the case may be) connecting the solar power plant with concerned 33/11 kV substation (including bay, breakers and Detailed site survey; Testing and commissioning of plant & associated 33kV OR, 11kV line (as the case may be) by designated official(s) of JDVVNL Construction of control room or any other relative civil work (at the plant end) essential for Commissioning of Project. Operation & maintenance of the solar power plant as well as 33kV / 11kV line (as the case may be) for 25 years (unless extended by both the parties on mutual agreement) from COD. Injection of power at delivery point for 25 years at the awarded levelized tariff (Rs. per kWh) (inclusive of applicable taxes incl. GST, duties, etc.), extendable on mutual agreement. The delivery point for solar power plant(s) having installed capacity upto 2.55 MWp shall be 11kV side and for installation capacity above 2.55 MWp, delivery point shall be 33kV side of the concerned 33/11 kV GSS of DISCOM. Remote Monitoring of installed solar power plant through RMS for 25 years (unless extended by both the parties on mutual agreement).metering system at substation) as per design and specifications of DISCOM / MNRE / CEA Both hard copy submission and online submission of scanned copy of the above documents is essential otherwise the bid (Technical Bid & Financial Bid) in electronic form will not be opened for that bidder. A complete bid document can be downloaded from: https://eproc.rajasthan.gov.in/nicgep/app The tender seeks Electrical Works worth Rs. 4,45,62,00,000 cr to be completed in 270 days. As per the tender, the bid validity will be 90 days, and it will be an open bidding process. The bid submission period began on July 17, 2023 and will end on August 16, 2023. Essential details: Project Estimated Value: ₹ 4,45,62,00,000 Product Category: Electrical Works Bid Validity (Days): 270 Period of Work: 90 days Tender ID: 2023_JdVVN_344853_1 Tender Ref. No.: TN-DSM-26 Payment mode: Offline Form of contract: Item rate

Next Story
Infrastructure Energy

Adani Green Adds 212.5 MW Solar in Gujarat

Adani Green Energy Ltd. has commissioned a 212.5 MW solar power project at Khavda, Gujarat, through its subsidiary Adani Renewable Energy Fifty Seven Ltd. This addition brings Adani Green's total operational renewable capacity to 13,700 MW, as per a stock exchange filing. Last month, Adani Green became India's first renewable energy company to cross 12,000 MW of operational capacity. The company is also developing the world's largest 30,000 MW renewable energy plant in Khavda, spanning 538 sq km—about five times the size of Paris and nearly as large as Mumbai. Upon completion, it will be th..

Next Story
Infrastructure Energy

ONGC NTPC Green Acquires Ayana for Rs 62.5 Billion

ONGC NTPC Green Pvt Ltd (ONGPL) has completed the Rs 62.5 billion acquisition of Ayana Renewable Power, securing a 100% equity stake. The 50:50 joint venture between NTPC Green Energy Ltd (NGEL) and ONGC Green Ltd finalized the deal. NGEL contributed Rs 31.2 billion toward the acquisition, aligning with its goal to achieve 60 GW of renewable capacity by 2032. Ayana, a key player in India's green energy sector, has a 4,112 MW portfolio, with 2,123 MW operational and 1,989 MW under construction. Its projects are backed by high-credit-rated buyers, including SECI, NTPC, GUVNL, and Indian Railw..

Next Story
Infrastructure Transport

Cabinet Approves Rs 37.1 Billion Patna-Sasaram Corridor

The Union Cabinet has approved the construction of a four-lane access-controlled Patna-Sasaram corridor in Bihar at an estimated cost of Rs 37.1 billion. The 120.1 km project, to be developed under the Hybrid Annuity Mode (HAM), aims to ease congestion and enhance connectivity. Currently, travel between Sasaram, Arrah, and Patna takes 3-4 hours due to heavy traffic on state highways. The new corridor will integrate greenfield and 10.6 km of brownfield upgrades, linking key cities such as Arrah, Grahini, Piro, Bikramganj, Mokar, and Sasaram. The project will connect NH-19, NH-319, NH-922, NH-..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?