POWERGRID secures ISTS transmission project in Gujarat
POWER & RENEWABLE ENERGY

POWERGRID secures ISTS transmission project in Gujarat

Power Grid Corporation of India (POWERGRID) has won a project to provide reactive compensation for an inter-state transmission (ISTS) project in Gujarat from PFC Consulting, a wholly-owned subsidiary of Power Finance Corporation (PFC).

The project involves the provision of dynamic reactive compensation at Khavda Pooling Station 1 (KPS1) and Khavda Pooling Station 3 (KPS3). It has been awarded through a tariff-based competitive bidding process, and the system will be established on a build, own, operate, and transfer basis.

The project includes installing Static Synchronous Compensators (STATCOMs) at KPS1 and KPS3 and the related bay extension work. These installations are crucial to maintaining voltage stability and improving the overall efficiency of the power transmission network in the region.

The transmission service provider (TSP) will have to ensure that the design, construction, and testing of all equipment, facilities, components, and systems related to the Project are conducted in accordance with the provisions of the Transmission Service Agreement, as well as the relevant Rules, Regulations, Orders, and Guidelines issued by the Central Government. They will also be responsible for obtaining the Transmission License from the Commission.v Transmission Charges will be payable by the designated ISTS Customers in Indian Rupees through the CTU, in accordance with the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, as amended from time to time. Bidders must quote the Transmission Charges based on the pre-defined structure.

Recently, PFC Consulting also invited bids to select a transmission service provider to establish an inter-state transmission system to evacuate 3 GW of renewable energy from the Raghanesda area in Gujarat under Phase I.

Power Grid Corporation of India (POWERGRID) has won a project to provide reactive compensation for an inter-state transmission (ISTS) project in Gujarat from PFC Consulting, a wholly-owned subsidiary of Power Finance Corporation (PFC). The project involves the provision of dynamic reactive compensation at Khavda Pooling Station 1 (KPS1) and Khavda Pooling Station 3 (KPS3). It has been awarded through a tariff-based competitive bidding process, and the system will be established on a build, own, operate, and transfer basis. The project includes installing Static Synchronous Compensators (STATCOMs) at KPS1 and KPS3 and the related bay extension work. These installations are crucial to maintaining voltage stability and improving the overall efficiency of the power transmission network in the region. The transmission service provider (TSP) will have to ensure that the design, construction, and testing of all equipment, facilities, components, and systems related to the Project are conducted in accordance with the provisions of the Transmission Service Agreement, as well as the relevant Rules, Regulations, Orders, and Guidelines issued by the Central Government. They will also be responsible for obtaining the Transmission License from the Commission.v Transmission Charges will be payable by the designated ISTS Customers in Indian Rupees through the CTU, in accordance with the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, as amended from time to time. Bidders must quote the Transmission Charges based on the pre-defined structure. Recently, PFC Consulting also invited bids to select a transmission service provider to establish an inter-state transmission system to evacuate 3 GW of renewable energy from the Raghanesda area in Gujarat under Phase I.

Next Story
Resources

Madhya Pradesh Champions Inclusive Tourism at Heritage Sites

On the occasion of World Heritage Day, Madhya Pradesh is taking a significant step toward inclusive tourism by making its historical sites accessible to all — especially persons with disabilities. The state is rolling out its ‘Accessibility Infrastructure and Development’ project at Maheshwar, Mandu, Dhar, and Orchha, aiming to create a more welcoming experience at these iconic cultural destinations.The initiative, under the leadership of Chief Minister Dr Mohan Yadav and Tourism Minister Shri Dharmendra Bhav Singh Lodhi, includes infrastructure upgrades such as ramps, Braille signage, w..

Next Story
Resources

Runwal Realty Onboards Sonam Kapoor as Brand Ambassador

Real estate major Runwal has unveiled a refreshed identity as Runwal Realty, signalling a renewed commitment to crafting spaces that stand the test of time. With this refresh, the brand unveils its new philosophy: “Building for Generations to Come” and welcomes Bollywood star and global fashion icon Sonam Kapoor as its brand ambassador. This evolved identity reflects Runwal Realty’s commitment to creating not just homes, but heirlooms—crafted through visionary design, meticulous planning, global design expertise and an unwavering focus on quality. With the customer at its core, each de..

Next Story
Infrastructure Urban

Emerging Trends in Infrastructure and Transport 2025: KPMG

KPMG’s latest report, The Great Reset: Emerging Trends in Infrastructure and Transport 2025 edition, sheds light on the profound changes transforming the global infrastructure landscape. As industries adapt to the challenges posed by climate change, economic pressures, and technological advancements, the report identifies key trends and provides actionable insights for leaders in infrastructure and transport sectors. “In today’s interconnected world, the lack of standardized supply chain practices is not just an operational challenge—it’s an environmental and economic one. We’..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?