NTPC asks Indian startups to produce torrefied biomass pellets
POWER & RENEWABLE ENERGY

NTPC asks Indian startups to produce torrefied biomass pellets

National Thermal Power Corporation (NTPC) has invited Expression of Interest (EOI) to produce torrefied biomass pellets from Indian startups.

Through its research and development (R&D) wing, the network for space object tracking and analysis (NETRA), NTPC intends to provide a platform for Indian startups to develop advanced technology for producing torrefied biomass pellets for decentralised small-scale users. The deadline for the submission is 19 May 2022.

India produces around 230 million metric tonnes of biomass annually, either wasted or burnt. Biomass in power plants can reduce carbon footprint in the environment.

NTPC has been a pioneer in co-firing biomass in its coal power plants. Since its co-firing, NTPC has been strengthening the entire biomass sector value chain in various dimensions. Many NTPC plants have already started the requisite co-firing biomass pellets with coal. Long-term procurement has not been initiated in many plants.

Till now, the focus has been on non-torrefied biomass pellets. But, for bulk utilisation, torrefied biomass pellet production needs to be given importance, as it has more energy density with similar characteristics to coal.

The torrefied biomass pellets will reduce average transportation costs. Currently, the technology for torrefied pellets is still in the nascent stage of development.

The Ministry of Power (MoP) has set up the National Mission for using biomass in thermal power plants, Mission SAMARTH. It has mandated 5-10% co-firing of biomass in all coal-based thermal power plants in India. Biomass co-firing in power plants has also been included in the Budget 2022 for reducing carbon emissions and generating income for the farmers.

Image Source

Also read: Govt takes steps towards biomass use in coal-based TPPs

National Thermal Power Corporation (NTPC) has invited Expression of Interest (EOI) to produce torrefied biomass pellets from Indian startups. Through its research and development (R&D) wing, the network for space object tracking and analysis (NETRA), NTPC intends to provide a platform for Indian startups to develop advanced technology for producing torrefied biomass pellets for decentralised small-scale users. The deadline for the submission is 19 May 2022. India produces around 230 million metric tonnes of biomass annually, either wasted or burnt. Biomass in power plants can reduce carbon footprint in the environment. NTPC has been a pioneer in co-firing biomass in its coal power plants. Since its co-firing, NTPC has been strengthening the entire biomass sector value chain in various dimensions. Many NTPC plants have already started the requisite co-firing biomass pellets with coal. Long-term procurement has not been initiated in many plants. Till now, the focus has been on non-torrefied biomass pellets. But, for bulk utilisation, torrefied biomass pellet production needs to be given importance, as it has more energy density with similar characteristics to coal. The torrefied biomass pellets will reduce average transportation costs. Currently, the technology for torrefied pellets is still in the nascent stage of development. The Ministry of Power (MoP) has set up the National Mission for using biomass in thermal power plants, Mission SAMARTH. It has mandated 5-10% co-firing of biomass in all coal-based thermal power plants in India. Biomass co-firing in power plants has also been included in the Budget 2022 for reducing carbon emissions and generating income for the farmers. Image Source Also read: Govt takes steps towards biomass use in coal-based TPPs

Next Story
Infrastructure Transport

NHAI to Upgrade Tamil Nadu Highways

To reduce congestion on key national highways in Tamil Nadu, the National Highways Authority of India (NHAI) has planned capacity upgrades for at least eight highway stretches. The improvements will include bypasses, flyovers, and four-laning in Salem, Coimbatore, Tiruppur, Nilgiris, and Cuddalore. NHAI has invited tenders to appoint consultants for preparing detailed project reports (DPRs) on these expansions. The affected highways include NH-181, NH-81, NH-532, NH-85, and NH-136. Proposed Upgrades Across Highways - NH-181 (Coimbatore-Gundlupet Route): This stretch will see four bypasses an..

Next Story
Infrastructure Transport

Ludhiana-Bathinda Highway Revived as NHAI Invites Bids

The Ludhiana-Bathinda highway project, initially stalled due to land acquisition issues, has been revived as the National Highways Authority of India (NHAI) invites fresh bids to resume construction. The project, part of the Ludhiana-Ajmer Economic Corridor, is estimated to cost Rs 24.61 billion and will be executed in two phases. Package 1, covering 30.03 km, has a budget of Rs 9.06 billion, while Package 2, spanning 45.25 km, is set to cost Rs 15.55 billion. The NHAI had previously withdrawn the project due to unavailability of land. However, intervention from Union Minister for Road Trans..

Next Story
Infrastructure Urban

Dilip Buildcon Wins Rs 460M Arbitration

Infrastructure major Dilip Buildcon has secured an arbitration award of Rs 460 million against the National Highways Authority of India (NHAI) over delays and breaches during the execution of a highway project in Karnataka. The dispute pertains to the Rehabilitation and Upgradation of the Kerala Border to Kollegala Section of NH 212, awarded to Dilip Buildcon under an Engineering, Procurement, and Construction (EPC) agreement dated June 6, 2014. The project involved two-lane expansion with paved shoulders and four-lane development under the National Highways Development Project (NHDP) Phase IV..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?