NTPC asks Indian startups to produce torrefied biomass pellets
POWER & RENEWABLE ENERGY

NTPC asks Indian startups to produce torrefied biomass pellets

National Thermal Power Corporation (NTPC) has invited Expression of Interest (EOI) to produce torrefied biomass pellets from Indian startups.

Through its research and development (R&D) wing, the network for space object tracking and analysis (NETRA), NTPC intends to provide a platform for Indian startups to develop advanced technology for producing torrefied biomass pellets for decentralised small-scale users. The deadline for the submission is 19 May 2022.

India produces around 230 million metric tonnes of biomass annually, either wasted or burnt. Biomass in power plants can reduce carbon footprint in the environment.

NTPC has been a pioneer in co-firing biomass in its coal power plants. Since its co-firing, NTPC has been strengthening the entire biomass sector value chain in various dimensions. Many NTPC plants have already started the requisite co-firing biomass pellets with coal. Long-term procurement has not been initiated in many plants.

Till now, the focus has been on non-torrefied biomass pellets. But, for bulk utilisation, torrefied biomass pellet production needs to be given importance, as it has more energy density with similar characteristics to coal.

The torrefied biomass pellets will reduce average transportation costs. Currently, the technology for torrefied pellets is still in the nascent stage of development.

The Ministry of Power (MoP) has set up the National Mission for using biomass in thermal power plants, Mission SAMARTH. It has mandated 5-10% co-firing of biomass in all coal-based thermal power plants in India. Biomass co-firing in power plants has also been included in the Budget 2022 for reducing carbon emissions and generating income for the farmers.

Image Source

Also read: Govt takes steps towards biomass use in coal-based TPPs

National Thermal Power Corporation (NTPC) has invited Expression of Interest (EOI) to produce torrefied biomass pellets from Indian startups. Through its research and development (R&D) wing, the network for space object tracking and analysis (NETRA), NTPC intends to provide a platform for Indian startups to develop advanced technology for producing torrefied biomass pellets for decentralised small-scale users. The deadline for the submission is 19 May 2022. India produces around 230 million metric tonnes of biomass annually, either wasted or burnt. Biomass in power plants can reduce carbon footprint in the environment. NTPC has been a pioneer in co-firing biomass in its coal power plants. Since its co-firing, NTPC has been strengthening the entire biomass sector value chain in various dimensions. Many NTPC plants have already started the requisite co-firing biomass pellets with coal. Long-term procurement has not been initiated in many plants. Till now, the focus has been on non-torrefied biomass pellets. But, for bulk utilisation, torrefied biomass pellet production needs to be given importance, as it has more energy density with similar characteristics to coal. The torrefied biomass pellets will reduce average transportation costs. Currently, the technology for torrefied pellets is still in the nascent stage of development. The Ministry of Power (MoP) has set up the National Mission for using biomass in thermal power plants, Mission SAMARTH. It has mandated 5-10% co-firing of biomass in all coal-based thermal power plants in India. Biomass co-firing in power plants has also been included in the Budget 2022 for reducing carbon emissions and generating income for the farmers. Image Source Also read: Govt takes steps towards biomass use in coal-based TPPs

Next Story
Infrastructure Energy

Right-of-Way Issues Delay 14 Interstate Transmission Projects

Fourteen interstate transmission system (ISTS) projects are facing delays due to prolonged right-of-way (RoW) issues, primarily driven by demands for higher compensation than state-approved rates. Additional challenges, including delays in forest clearances, have further stalled progress, according to Minister of State for Power Shripad Naik. Of the 14 affected projects, eight are being executed by POWERGRID, while six are handled by private companies, including Adani, Sterlite, Tata Power, and ReNew. These projects span multiple states. To address compensation concerns, the Ministry of Power ..

Next Story
Infrastructure Energy

NHPC Invites Bids for 2.56 MW Rooftop Solar Projects in Nagaland

NHPC has issued a tender for 2.56 MW rooftop solar projects on government buildings in Nagaland under the PM Surya Ghar: Muft Bijli Yojana. The deadline for bid submission is April 21, 2025, with bid opening scheduled for April 23. Bidders must submit an earnest money deposit of Rs 2.5 million and a performance security fee of Rs 2,475 per kW, along with a bid document procurement fee of Rs 5,000. The scope of work includes design, engineering, equipment supply, erection, testing, commissioning, and operation & maintenance for 25 years. Successful bidders must also obtain net metering approv..

Next Story
Infrastructure Energy

SWELECT Wins Rs 2.9 Billion via Private Placement with India Infradebt

SWELECT Group has raised Rs 2.9 billion through non-convertible debentures (NCDs) in a private placement with India Infradebt. The funding, backed by a portion of its solar power assets, has released Rs 2.6 billion in cash collaterals, which will be reinvested to expand its independent power producer (IPP) portfolio to 1 GW by 2026-27. SWELECT Energy Systems, the group's solar module manufacturing arm, has also secured orders exceeding 150 MW for its TOPCon bifacial solar modules. In December 2024, the company proposed raising Rs 1.38 billion by issuing 1,385 NCDs with a face value of Rs 1 mil..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?