Juniper Green & Tata Power Secure 225 MW in Wind-Solar Hybrid Auction
POWER & RENEWABLE ENERGY

Juniper Green & Tata Power Secure 225 MW in Wind-Solar Hybrid Auction

Juniper Green Energy and Tata Power Renewable Energy Limited, both independent renewable energy producers and operators of solar, wind, and hybrid power projects, have achieved success in Tata Power's recent auction. The auction was conducted to facilitate the development and acquisition of 225 MW of grid-connected intrastate and interstate wind-solar hybrid power projects, with an additional option to procure 225 MW on a long-term basis.
Juniper Green Energy secured 75 MW by submitting a competitive bid of INR 3.27 per kWh, while Tata Power Renewable Energy Limited secured 150 MW with a bid of INR 3.28 per kWh using the bucket-filling method.
This tender for hybrid projects was initially released in June. The selected bidders will now engage in a Power Purchase Agreement for a duration of 25 years, commencing from the project's commissioning date. Tata Power has also mandated the utilization of solar modules listed in the ALMM issued by the MNRE (Ministry of New and Renewable Energy).
Furthermore, Tata Power Renewable Energy Limited previously signed two significant Power Purchase Agreements with the Maharashtra State Electricity Distribution Company Ltd. for the development of two solar power projects, one with a capacity of 200 MW and the other with 150 MW. Additionally, in June, Tata Power Renewable Energy Limited successfully commissioned a 110 MW solar power project in Bikaner, Rajasthan, which will supply 110 MW of clean energy to the Kerala State Electricity Board.

See also:
Tata Power, Anand Group join forces for 4.4 MW RE captive project 
SECI Launches 1.3 GW ISTS Wind Power Projects Tender


Juniper Green Energy and Tata Power Renewable Energy Limited, both independent renewable energy producers and operators of solar, wind, and hybrid power projects, have achieved success in Tata Power's recent auction. The auction was conducted to facilitate the development and acquisition of 225 MW of grid-connected intrastate and interstate wind-solar hybrid power projects, with an additional option to procure 225 MW on a long-term basis.Juniper Green Energy secured 75 MW by submitting a competitive bid of INR 3.27 per kWh, while Tata Power Renewable Energy Limited secured 150 MW with a bid of INR 3.28 per kWh using the bucket-filling method.This tender for hybrid projects was initially released in June. The selected bidders will now engage in a Power Purchase Agreement for a duration of 25 years, commencing from the project's commissioning date. Tata Power has also mandated the utilization of solar modules listed in the ALMM issued by the MNRE (Ministry of New and Renewable Energy).Furthermore, Tata Power Renewable Energy Limited previously signed two significant Power Purchase Agreements with the Maharashtra State Electricity Distribution Company Ltd. for the development of two solar power projects, one with a capacity of 200 MW and the other with 150 MW. Additionally, in June, Tata Power Renewable Energy Limited successfully commissioned a 110 MW solar power project in Bikaner, Rajasthan, which will supply 110 MW of clean energy to the Kerala State Electricity Board. See also: Tata Power, Anand Group join forces for 4.4 MW RE captive project  SECI Launches 1.3 GW ISTS Wind Power Projects Tender

Next Story
Infrastructure Energy

Apollo Green Energy targets Rs 100 billion in renewables

Apollo Green Energy Limited (AGEL), a subsidiary of Apollo International Group, is set to grow its renewable energy portfolio to Rs 100 billion by 2025, with plans for an initial public offering (IPO) to fuel this expansion. AGEL currently holds an order book of Rs 35 billion and manages Rs 25 billion in solar projects across several states. Operating in eight states, AGEL’s portfolio includes 400 MW of solar power installations and a Rs 7 billion Flue Gas Desulfurization (FGD) project aimed at reducing emissions in power generation. These projects support India’s ambitious target of reac..

Next Story
Infrastructure Transport

Kolkata Metro’s Orange Line Phase II deadline moved to March 2025

The completion date for the Orange Line's Phase II extension, stretching from Ruby to Sector V, has been shifted to March 2025. Rail Vikas Nigam Ltd. (RVNL), the agency overseeing the project, initially aimed for a December 2024 deadline but cited a delay in bridging an 800-meter viaduct gap at Chingrighata as the reason for the revised schedule. Work to bridge an additional 125-meter gap at Metropolitan is ongoing. Despite land challenges at locations such as Tagore Park, Chingrighata, and Nicco Park, the corridor received safety approval from the Commission of Railway Safety (CRS) for opera..

Next Story
Infrastructure Energy

Solar efficiency, cost cuts vital for energy transition: Pralhad Joshi

Union Minister for New and Renewable Energy, Pralhad Joshi, emphasised the global focus on advancing solar technology to achieve significant cost reductions and efficiency gains during a conference on clean energy transition. As President of the International Solar Alliance (ISA), he remarked, “The world is united in the energy transition, harnessing global efforts.” Joshi highlighted the need for more efficient solar technology, stating, “Traditional solar panels typically convert only 15-20% of sunlight to electricity, but innovations like bifacial panels and solar paint are increasin..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000