+
HPPCL Seeks Bids for 8 MW Solar Project
POWER & RENEWABLE ENERGY

HPPCL Seeks Bids for 8 MW Solar Project

Himachal Pradesh Power Corporation Limited (HPPCL) has invited bids to commission an 8 MW solar power project at Bada Basot in Solan, Himachal Pradesh. The scope of work includes comprehensive operation and maintenance (O&M) services for a period of eight years.

The last date for submitting bids is August 14, 2024, and the bids will be opened on the same day. Bidders are required to furnish an earnest money deposit of ?10 million (~$119,679) to participate in the tender.

The successful bidder will be responsible for the entire process, from inception to the completion of the commissioned project for HPPCL. This includes providing all necessary equipment, materials, and services for the satisfactory operation of the solar system and its integration with the evacuation system provided by the state electricity authority.

To be eligible, bidders must have participated as contractors, joint venture partners, or subcontractors in at least one completed contract within the last ten years, with a value exceeding ?140 million ($1.67 million) and a minimum capacity of 2.4 MW. Alternatively, they can qualify by having completed two contracts, each with a value exceeding ?94 million ($1.12 million) and a minimum capacity of 1.6 MW each, or three contracts, each with a value exceeding ?47 million (~$562,491) and a minimum capacity of 800 kW each.

Additionally, bidders must have completed an operational and maintenance contract of at least one year in one solar project with a minimum capacity of 2 MW within the last ten years. They must also have a minimum average annual turnover of ?235 million ($2.81 million) from operations, excluding other income, for the last three financial years, and access to financial resources of at least ?117.5 million ($1.4 million) to meet the cash-flow requirement.

This latest tender from HPPCL comes after the corporation invited bids in March 2023 to commission solar power projects with a cumulative capacity of 13 MW at Maira and Dabhota II in Solan, Himachal Pradesh.

Himachal Pradesh Power Corporation Limited (HPPCL) has invited bids to commission an 8 MW solar power project at Bada Basot in Solan, Himachal Pradesh. The scope of work includes comprehensive operation and maintenance (O&M) services for a period of eight years. The last date for submitting bids is August 14, 2024, and the bids will be opened on the same day. Bidders are required to furnish an earnest money deposit of ?10 million (~$119,679) to participate in the tender. The successful bidder will be responsible for the entire process, from inception to the completion of the commissioned project for HPPCL. This includes providing all necessary equipment, materials, and services for the satisfactory operation of the solar system and its integration with the evacuation system provided by the state electricity authority. To be eligible, bidders must have participated as contractors, joint venture partners, or subcontractors in at least one completed contract within the last ten years, with a value exceeding ?140 million ($1.67 million) and a minimum capacity of 2.4 MW. Alternatively, they can qualify by having completed two contracts, each with a value exceeding ?94 million ($1.12 million) and a minimum capacity of 1.6 MW each, or three contracts, each with a value exceeding ?47 million (~$562,491) and a minimum capacity of 800 kW each. Additionally, bidders must have completed an operational and maintenance contract of at least one year in one solar project with a minimum capacity of 2 MW within the last ten years. They must also have a minimum average annual turnover of ?235 million ($2.81 million) from operations, excluding other income, for the last three financial years, and access to financial resources of at least ?117.5 million ($1.4 million) to meet the cash-flow requirement. This latest tender from HPPCL comes after the corporation invited bids in March 2023 to commission solar power projects with a cumulative capacity of 13 MW at Maira and Dabhota II in Solan, Himachal Pradesh.

Next Story
Infrastructure Transport

Mumbai–Pune Link to Bypass Ghat Ready by December

A 13-kilometre connector on the Mumbai–Pune Expressway, designed to bypass the congested and accident-prone Lonavala–Khandala ghat section, is set to be completed by December. The Maharashtra State Road Development Corporation (MSRDC), overseeing the project, has confirmed that construction is in its final stages.Currently, the 19-kilometre stretch between Khopoli and the Sinhgad Institute forces vehicles to navigate narrow, winding ghat roads. Once operational, the new link will allow motorists to skip this stretch entirely, easing congestion and improving safety.Handling around 75,000 ve..

Next Story
Infrastructure Transport

Metro Line 4, Flyover Open to Ease Thane Traffic

In a bid to streamline transport and ease mounting congestion, the Maharashtra government has inaugurated two major infrastructure projects in Mumbai: Metro Line 4 and Phase 1 of the Kasarvadavli Flyover. The newly opened 800-metre flyover is now operational, offering commuters faster transit between Thane and Gaimukh.Transport Minister Pratap Sarnaik formally opened the flyover, which lies parallel to the under-construction Metro Line 4 corridor. Built to decongest the heavily trafficked Ghodbunder junction, the structure enables seamless movement for vehicles bypassing the bottleneck.Designe..

Next Story
Resources

Pidilite Industries Marks World Youth Skills Day by Strengthening Skilling Initiatives

On the occasion of World Youth Skills Day, Pidilite Industries, a leading manufacturer of adhesives, sealants, construction chemicals and art materials, reaffirmed its commitment to youth empowerment through vocational training and digital tools. With the construction and real estate sectors in India expected to generate 30 million jobs by 2030, skilling is seen as a critical enabler for the country’s growth. Pidilite has trained over one lakh youth through its various initiatives, spanning trades such as plumbing, waterproofing, woodworking, construction, organic farming, interior desi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?