HPPCL Seeks Bids for 8 MW Solar Project
POWER & RENEWABLE ENERGY

HPPCL Seeks Bids for 8 MW Solar Project

Himachal Pradesh Power Corporation Limited (HPPCL) has invited bids to commission an 8 MW solar power project at Bada Basot in Solan, Himachal Pradesh. The scope of work includes comprehensive operation and maintenance (O&M) services for a period of eight years.

The last date for submitting bids is August 14, 2024, and the bids will be opened on the same day. Bidders are required to furnish an earnest money deposit of ?10 million (~$119,679) to participate in the tender.

The successful bidder will be responsible for the entire process, from inception to the completion of the commissioned project for HPPCL. This includes providing all necessary equipment, materials, and services for the satisfactory operation of the solar system and its integration with the evacuation system provided by the state electricity authority.

To be eligible, bidders must have participated as contractors, joint venture partners, or subcontractors in at least one completed contract within the last ten years, with a value exceeding ?140 million ($1.67 million) and a minimum capacity of 2.4 MW. Alternatively, they can qualify by having completed two contracts, each with a value exceeding ?94 million ($1.12 million) and a minimum capacity of 1.6 MW each, or three contracts, each with a value exceeding ?47 million (~$562,491) and a minimum capacity of 800 kW each.

Additionally, bidders must have completed an operational and maintenance contract of at least one year in one solar project with a minimum capacity of 2 MW within the last ten years. They must also have a minimum average annual turnover of ?235 million ($2.81 million) from operations, excluding other income, for the last three financial years, and access to financial resources of at least ?117.5 million ($1.4 million) to meet the cash-flow requirement.

This latest tender from HPPCL comes after the corporation invited bids in March 2023 to commission solar power projects with a cumulative capacity of 13 MW at Maira and Dabhota II in Solan, Himachal Pradesh.

Himachal Pradesh Power Corporation Limited (HPPCL) has invited bids to commission an 8 MW solar power project at Bada Basot in Solan, Himachal Pradesh. The scope of work includes comprehensive operation and maintenance (O&M) services for a period of eight years. The last date for submitting bids is August 14, 2024, and the bids will be opened on the same day. Bidders are required to furnish an earnest money deposit of ?10 million (~$119,679) to participate in the tender. The successful bidder will be responsible for the entire process, from inception to the completion of the commissioned project for HPPCL. This includes providing all necessary equipment, materials, and services for the satisfactory operation of the solar system and its integration with the evacuation system provided by the state electricity authority. To be eligible, bidders must have participated as contractors, joint venture partners, or subcontractors in at least one completed contract within the last ten years, with a value exceeding ?140 million ($1.67 million) and a minimum capacity of 2.4 MW. Alternatively, they can qualify by having completed two contracts, each with a value exceeding ?94 million ($1.12 million) and a minimum capacity of 1.6 MW each, or three contracts, each with a value exceeding ?47 million (~$562,491) and a minimum capacity of 800 kW each. Additionally, bidders must have completed an operational and maintenance contract of at least one year in one solar project with a minimum capacity of 2 MW within the last ten years. They must also have a minimum average annual turnover of ?235 million ($2.81 million) from operations, excluding other income, for the last three financial years, and access to financial resources of at least ?117.5 million ($1.4 million) to meet the cash-flow requirement. This latest tender from HPPCL comes after the corporation invited bids in March 2023 to commission solar power projects with a cumulative capacity of 13 MW at Maira and Dabhota II in Solan, Himachal Pradesh.

Next Story
Infrastructure Urban

Arya Omnitalk Powers India’s Toll Revolution with AI-Driven Solutions

Arya Omnitalk, a leader in intelligent transportation systems, is revolutionising toll collection across India’s national highways with its advanced AI-powered Toll Management Solutions. Designed for rugged remote toll locations, the company’s cutting-edge technology ensures seamless, reliable, and secure tolling—especially during high-capacity operations exceeding 200%. By integrating real-time analytics, cyber protection, and FASTag-based cashless tolling, Arya Omnitalk’s systems are significantly reducing congestion, improving transparency, and enhancing revenue assurance. Its full..

Next Story
Infrastructure Urban

Over 800 Join Anant Raj Runathon to Mark Earth Day

Over 800 participants came together at Anant Raj Estate, Sector 63A, Gurugram, for the Anant Raj Runathon 2025—a vibrant celebration of Earth Day through fitness, community bonding, and sustainability. Curated by renowned running coach Ravinder, the event featured four categories: 10-mile and 5-mile timed runs, a 5-mile walkathon, and a 1-mile kids’ run. Runners of all ages took to the green, scenic roads of the area—some chasing personal bests, others running for a cause. The Runathon was designed to promote healthy living while raising awareness about sustainable practices. Participa..

Next Story
Infrastructure Urban

PETRONAS Lubricants, Quaker Houghton Ink Strategic Deal

In a significant step towards strengthening industrial operations in India and Malaysia, PETRONAS Lubricants India Pvt. Ltd (PLIPL) and Quaker Houghton have announced a strategic partnership aimed at delivering high-performance industrial fluid solutions to key manufacturing sectors, including steel production. The collaboration combines the strengths of both companies—leveraging PETRONAS Lubricants India’s maintenance lubricant technologies and Quaker Houghton’s deep expertise in metalworking fluids. Starting from the second quarter of 2025, Quaker Houghton will begin offering PETRONAS..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?