Govt Tightens Solar Quality Norms
POWER & RENEWABLE ENERGY

Govt Tightens Solar Quality Norms

The Union Ministry of New and Renewable Energy (MNRE) has introduced the Solar Systems, Devices, and Components Goods Order, 2025, replacing the 2017 framework. The revised regulations, effective 180 days from publication, set stricter quality and efficiency standards for solar photovoltaic (PV) modules, inverters, and storage batteries.

Manufacturers, importers, and distributors must now comply with the Bureau of Indian Standards (BIS) certification. The new order mandates a minimum efficiency of 18% for Mono Crystalline Silicon and Thin-Film PV modules, and 17% for Poly Crystalline Silicon PV modules. Testing requirements have also been strengthened to align with global safety norms.

While licenses issued under the 2017 order remain valid, all renewals and new registrations will follow the QCO, 2025 framework. However, products meant exclusively for export are exempt. The move follows two years of consultations with manufacturers, testing agencies, and WTO members, ensuring compliance with international trade standards.

The Union Ministry of New and Renewable Energy (MNRE) has introduced the Solar Systems, Devices, and Components Goods Order, 2025, replacing the 2017 framework. The revised regulations, effective 180 days from publication, set stricter quality and efficiency standards for solar photovoltaic (PV) modules, inverters, and storage batteries.Manufacturers, importers, and distributors must now comply with the Bureau of Indian Standards (BIS) certification. The new order mandates a minimum efficiency of 18% for Mono Crystalline Silicon and Thin-Film PV modules, and 17% for Poly Crystalline Silicon PV modules. Testing requirements have also been strengthened to align with global safety norms.While licenses issued under the 2017 order remain valid, all renewals and new registrations will follow the QCO, 2025 framework. However, products meant exclusively for export are exempt. The move follows two years of consultations with manufacturers, testing agencies, and WTO members, ensuring compliance with international trade standards.

Next Story
Infrastructure Energy

Alpex, TP Solar Win SECI’s 400 MW Auction

Alpex Solar and TP Solar, a subsidiary of Tata Power Renewable Energy, have won the Solar Energy Corporation of India’s (SECI) auction to supply domestically manufactured solar modules. SECI awarded 390 MW out of the tendered 400 MW capacity. Alpex secured 97.5 MW, while TP Solar won 292.5 MW at a bid value of Rs 21.61 million per MW. The modules will be supplied to a project site in Ramagiri, Andhra Pradesh. SECI retains the right to adjust the capacity by ±10% at the same price and terms. Additionally, it may place a repeat order for up to 100% of the awarded capacity within six months. ..

Next Story
Infrastructure Energy

Apraava Adds 250.7 MW Wind Power in Gujarat

Apraava Energy has successfully commissioned its largest wind power project, a 250.7 MW facility in Sidhpur, Devbhoomi Dwarka district, Gujarat. Developed under the Solar Energy Corporation of India’s (SECI) Tranche VIII wind tender, this addition expands Apraava’s operational wind portfolio to approximately 1200 MW. The project features 120 Suzlon wind turbine generators, each with a 2.1 MW capacity, and has secured a 25-year power purchase agreement (PPA) with SECI at Rs 2.83 per kWh. Equipped with advanced fire-suppression and condition-monitoring systems, the project ensures high opera..

Next Story
Infrastructure Urban

TCS Expands in Kochi with Rs 6.9 Billion Investment

Tata Consultancy Services (TCS) is setting up a 37-acre campus at the Kinfra Electronics Manufacturing Cluster in Kochi, investing Rs 6.9 billion in the project. The new campus will focus on electronics R&D and IT services, generating around 10,000 jobs. To meet its immediate need for 5,000 seats, TCS is also seeking office space at InfoPark in Kochi. The Kerala government is assisting in securing additional space across tech parks in Kochi, Thiruvananthapuram, and Kozhikode. The government is also expanding the Smart City project in Kakkanad to accommodate more IT firms. Discussions are und..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?