Centre Reviews Kerala's Power Sector Needs
POWER & RENEWABLE ENERGY

Centre Reviews Kerala's Power Sector Needs

The Union Power and Housing & Urban Affairs Minister Manohar Lal held a comprehensive review of Kerala's power sector on Friday at Hotel Leela Raviz. The discussion revolved around renewable energy integration, power distribution improvements, and strategies to meet the state’s growing electricity demand.

Minister of State for Petroleum and Natural Gas Suresh Gopi and Kerala Electricity Minister K Krishnankutty joined senior officials from the Centre, the state government, and the Power Finance Corporation (PFC) in outlining key goals under the Revamped Distribution Sector Scheme (RDSS).

Kerala Seeks Support for Power Needs Kerala highlighted its immediate energy requirements, thanking the Centre for allocating coal linkage for 500 MW, Rs 1.35 billion in viability gap funding for battery energy storage systems, and power from NTPC Barh until March 2025. The state requested an extension of the NTPC allocation to June 2025, emphasizing its importance in attracting data centers.

Key issues raised by Kerala included land allocation for a nuclear power project and resolving disputes over DBFOO contracts pending with the Appellate Tribunal for Electricity (APTEL).

Push for Smart Metering and Reforms The Union Minister urged Kerala to prioritize the rollout of smart metering, starting with government, commercial, and industrial establishments. He emphasized the need to reduce accumulated losses in distribution utilities and address infrastructure challenges under the RDSS.

The Centre also advised Kerala to collaborate with the Ministry of Railways on resolving Way leave charges and assured assistance in land identification for new energy projects.

Commitment to Energy Transition Reaffirming the Centre’s commitment to aiding Kerala, Minister Manohar Lal highlighted ongoing efforts to streamline project approvals through a single-window clearance mechanism. The initiatives aim to prepare the state for rising power demand while facilitating its transition to renewable energy sources.

The Union Power and Housing & Urban Affairs Minister Manohar Lal held a comprehensive review of Kerala's power sector on Friday at Hotel Leela Raviz. The discussion revolved around renewable energy integration, power distribution improvements, and strategies to meet the state’s growing electricity demand. Minister of State for Petroleum and Natural Gas Suresh Gopi and Kerala Electricity Minister K Krishnankutty joined senior officials from the Centre, the state government, and the Power Finance Corporation (PFC) in outlining key goals under the Revamped Distribution Sector Scheme (RDSS). Kerala Seeks Support for Power Needs Kerala highlighted its immediate energy requirements, thanking the Centre for allocating coal linkage for 500 MW, Rs 1.35 billion in viability gap funding for battery energy storage systems, and power from NTPC Barh until March 2025. The state requested an extension of the NTPC allocation to June 2025, emphasizing its importance in attracting data centers. Key issues raised by Kerala included land allocation for a nuclear power project and resolving disputes over DBFOO contracts pending with the Appellate Tribunal for Electricity (APTEL). Push for Smart Metering and Reforms The Union Minister urged Kerala to prioritize the rollout of smart metering, starting with government, commercial, and industrial establishments. He emphasized the need to reduce accumulated losses in distribution utilities and address infrastructure challenges under the RDSS. The Centre also advised Kerala to collaborate with the Ministry of Railways on resolving Way leave charges and assured assistance in land identification for new energy projects. Commitment to Energy Transition Reaffirming the Centre’s commitment to aiding Kerala, Minister Manohar Lal highlighted ongoing efforts to streamline project approvals through a single-window clearance mechanism. The initiatives aim to prepare the state for rising power demand while facilitating its transition to renewable energy sources.

Next Story
Real Estate

Kerala HC Orders Demolition, Reconstruction of Chanderkunj Army Towers

The Kerala High Court has ordered the demolition and reconstruction of Towers B and C of the Chanderkunj Army Towers at Silver Sand Island, Vyttila, citing severe structural distress. The verdict follows a prolonged legal battle over the poor quality of construction, despite the Army Welfare Housing Organisation (AWHO) arguing for retrofitting instead of demolition. Justice CP Mohammed Nias ruled that the demolition was necessary to prevent casualties and safeguard residents. The court directed the district collector to form a committee comprising an experienced structural engineer, two r..

Next Story
Infrastructure Urban

Nitish Kumar Unveils Rs 13.28 Billion Projects in Bhagalpur

Chief Minister Nitish Kumar inaugurated 146 development projects worth Rs 13.28 billion during his ‘Pragati Yatra’, urging officials to accelerate the region’s progress. The projects span multiple sectors, including 18 smart city initiatives, six schemes for the building department, 32 for rural development, and several others covering road construction, health, and SC/ST welfare. Additionally, Kumar laid the foundation stone for 63 new projects, with 35 dedicated to rural development. During his visit, he launched key initiatives at Bihar Agricultural University in Sabour, inc..

Next Story
Infrastructure Transport

Indian Railways Upgrades 23,000 Track Kilometres for 130 kmph Speed

Indian Railways has upgraded over 23,000 track kilometres (TKM) to support speeds of up to 130 kmph, marking a significant milestone in its modernisation efforts. This initiative enhances connectivity, reduces travel time, and strengthens safety measures through advanced signalling and fencing systems. Key sections of the Golden Quadrilateral and Golden Diagonal networks—critical corridors linking major cities—are now equipped for higher speeds, improving passenger and freight movement. Additionally, 54,337 TKM of tracks have been upgraded for speeds up to 110 kmph, further boosting n..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?