BHEL delivers nuclear steam generator to NPCIL for Rajasthan plant
POWER & RENEWABLE ENERGY

BHEL delivers nuclear steam generator to NPCIL for Rajasthan plant

Bharat Heavy Electricals Limited (BHEL) had dispatched its 42nd nuclear steam generator to Nuclear Power Corporation of India Limited (NPCIL) for setting up a 700 MW Atomic Power project in Rajasthan.

The steam generator was flagged off from the Trichy plant of BHEL in the presence of senior officials of BHEL and NPCIL.

BHEL has achieved a milestone with the despatch of its 42nd nuclear steam generator to NPCIL.

BHEL has been catering to the needs of the nation's nuclear programme since 1976 by designing, manufacturing, testing and supplying critical nuclear power components such as reactor headers, steam generators, steam turbine generators, and others.

The first stage of the indigenous nuclear power programme of India by BHEL had attained maturity with operating 18 Pressurised Heavy Water Reactors (PHWRs).

About 12 PHWRs account for 74% of the indigenous nuclear power capacity, fully-equipped with BHEL-supplied steam turbine generator sets.

Image Source

Also read: BHEL to deliver Heat Exchangers sets for Tejas light combat aircraft

Bharat Heavy Electricals Limited (BHEL) had dispatched its 42nd nuclear steam generator to Nuclear Power Corporation of India Limited (NPCIL) for setting up a 700 MW Atomic Power project in Rajasthan. The steam generator was flagged off from the Trichy plant of BHEL in the presence of senior officials of BHEL and NPCIL. BHEL has achieved a milestone with the despatch of its 42nd nuclear steam generator to NPCIL. BHEL has been catering to the needs of the nation's nuclear programme since 1976 by designing, manufacturing, testing and supplying critical nuclear power components such as reactor headers, steam generators, steam turbine generators, and others. The first stage of the indigenous nuclear power programme of India by BHEL had attained maturity with operating 18 Pressurised Heavy Water Reactors (PHWRs). About 12 PHWRs account for 74% of the indigenous nuclear power capacity, fully-equipped with BHEL-supplied steam turbine generator sets. Image Source Also read: BHEL to deliver Heat Exchangers sets for Tejas light combat aircraft

Next Story
Infrastructure Transport

NHAI to Upgrade Tamil Nadu Highways

To reduce congestion on key national highways in Tamil Nadu, the National Highways Authority of India (NHAI) has planned capacity upgrades for at least eight highway stretches. The improvements will include bypasses, flyovers, and four-laning in Salem, Coimbatore, Tiruppur, Nilgiris, and Cuddalore. NHAI has invited tenders to appoint consultants for preparing detailed project reports (DPRs) on these expansions. The affected highways include NH-181, NH-81, NH-532, NH-85, and NH-136. Proposed Upgrades Across Highways - NH-181 (Coimbatore-Gundlupet Route): This stretch will see four bypasses an..

Next Story
Infrastructure Transport

Ludhiana-Bathinda Highway Revived as NHAI Invites Bids

The Ludhiana-Bathinda highway project, initially stalled due to land acquisition issues, has been revived as the National Highways Authority of India (NHAI) invites fresh bids to resume construction. The project, part of the Ludhiana-Ajmer Economic Corridor, is estimated to cost Rs 24.61 billion and will be executed in two phases. Package 1, covering 30.03 km, has a budget of Rs 9.06 billion, while Package 2, spanning 45.25 km, is set to cost Rs 15.55 billion. The NHAI had previously withdrawn the project due to unavailability of land. However, intervention from Union Minister for Road Trans..

Next Story
Infrastructure Urban

Dilip Buildcon Wins Rs 460M Arbitration

Infrastructure major Dilip Buildcon has secured an arbitration award of Rs 460 million against the National Highways Authority of India (NHAI) over delays and breaches during the execution of a highway project in Karnataka. The dispute pertains to the Rehabilitation and Upgradation of the Kerala Border to Kollegala Section of NH 212, awarded to Dilip Buildcon under an Engineering, Procurement, and Construction (EPC) agreement dated June 6, 2014. The project involved two-lane expansion with paved shoulders and four-lane development under the National Highways Development Project (NHDP) Phase IV..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?