Argentina removes accidental solar panels from Chilean side of border
POWER & RENEWABLE ENERGY

Argentina removes accidental solar panels from Chilean side of border

Argentina started removing solar panels that were mistakenly installed on the Chilean side of their shared border, following a complaint from Chilean President Gabriel Boric. The incident occurred in late April when the Argentine Navy inaugurated a maritime surveillance post in the Patagonia region. The solar panels, intended to power the military unit, were inadvertently set up on Chilean territory.

In response, the Argentine Navy issued a statement acknowledging the error and confirming the deployment of personnel and resources to remove the solar panels. "We have transferred personnel and means to begin the removal of a solar panel installed in the territory of the sister republic of Chile, north of the Island of Tierra del Fuego," the statement read.

Earlier in the day, President Boric had insisted on the removal of the panels, warning that Chile would take action if necessary. "Borders are not something that can be ambiguous. It is a basic principle of respect between countries and therefore they must remove those solar panels as soon as possible or we are going to do it," Boric stated during a visit to Paris. Chile and Argentina share a border of approximately 5,000 kilometers (more than 3,000 miles).

(Source: ET Energy)

Argentina started removing solar panels that were mistakenly installed on the Chilean side of their shared border, following a complaint from Chilean President Gabriel Boric. The incident occurred in late April when the Argentine Navy inaugurated a maritime surveillance post in the Patagonia region. The solar panels, intended to power the military unit, were inadvertently set up on Chilean territory. In response, the Argentine Navy issued a statement acknowledging the error and confirming the deployment of personnel and resources to remove the solar panels. We have transferred personnel and means to begin the removal of a solar panel installed in the territory of the sister republic of Chile, north of the Island of Tierra del Fuego, the statement read. Earlier in the day, President Boric had insisted on the removal of the panels, warning that Chile would take action if necessary. Borders are not something that can be ambiguous. It is a basic principle of respect between countries and therefore they must remove those solar panels as soon as possible or we are going to do it, Boric stated during a visit to Paris. Chile and Argentina share a border of approximately 5,000 kilometers (more than 3,000 miles). (Source: ET Energy)

Next Story
Real Estate

Varun Malik Joins ANAROCK as MD, Head of Capital Markets, APAC

ANAROCK Capital has appointed Varun Malik as Managing Director, Head of Capital Markets (APAC), marking a strategic move to expand its presence across Asia-Pacific. Based in Singapore, Malik will drive ANAROCK’s capital markets initiatives in the region.A real estate finance veteran, Malik brings over 18 years of experience in structuring complex cross-border transactions across South-East Asia and Australia. He has led debt and equity deals for REITs, fund managers, and developers, delivering strong returns and driving investor value.“We will redefine real estate capital solutions across ..

Next Story
Real Estate

Patra Chawl lottery held, 663 families allotted homes

Mumbai's Siddharth Nagar (Patra Chawl) Co-operative Housing Society members in Goregaon (West) saw their 15-year wait come to a close as MHADA conducted a successful computerised lottery for 663 eligible members under its redevelopment scheme.The Mumbai Housing and Area Development Board conducted the draw using the RAT (Randomised Allotment of Tenement) system at Sardar Vallabhbhai Patel Hall. The lottery, overseen by Mr. Milind Borikar, Chief Officer of Mumbai Board, ensured transparency by digitally allotting each member a building, wing, and floor.The project, located on Plot R-9, received..

Next Story
Infrastructure Transport

BLR Airport crosses 41 million passengers, 500,000 MT cargo

Kempegowda International Airport, Bengaluru (BLR Airport), has recorded key operational milestones in FY 2024-25, crossing 41.88 million passengers and handling 502,480 metric tonnes of cargo. This marks a year-on-year passenger growth of 11.6 per cent and a 14 per cent rise in cargo volumes.Domestic footfall reached 36.05 million, up 10 per cent, while international traffic saw a robust 25 per cent jump to 5.83 million, aided by Indigo’s global expansion and added frequencies by international carriers. BLR Airport now connects to 76 domestic and 33 international destinations, with Hanoi set..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?