Coal ministry working on 1st-mile connectivity
COAL & MINING

Coal ministry working on 1st-mile connectivity

The Ministry of Coal is actively working on developing the National Coal Logistic Plan, which includes First Mile Connectivity (FMC) through railway siding near coal mines, in order to improve India's energy security and realize the vision of Atmanirbhar Bharat by reducing the reliance on imported coal.

The idea of first mile connectivity has emerged as a game-changer in the continued pursuit of sustainable development and environmental conservation. The transportation of coal is being transformed by this ground-breaking strategy, having a positive and long-lasting effect on the environment.

By employing conveyors or roadways to the closest railway siding, First Mile Connectivity removes the need for coal to be transported by road in mining locations.

Coal is moved through a road or conveyor belt to the closest railway siding.

FMC helps to create a cleaner and healthier environment by reducing the amount of trucks on the road and the negative environmental effects that come with them, such as air pollution, traffic jams, and road damage.

The Ministry of Coal is actively working on developing the National Coal Logistic Plan, which includes First Mile Connectivity (FMC) through railway siding near coal mines, in order to improve India's energy security and realize the vision of Atmanirbhar Bharat by reducing the reliance on imported coal. The idea of first mile connectivity has emerged as a game-changer in the continued pursuit of sustainable development and environmental conservation. The transportation of coal is being transformed by this ground-breaking strategy, having a positive and long-lasting effect on the environment. By employing conveyors or roadways to the closest railway siding, First Mile Connectivity removes the need for coal to be transported by road in mining locations. Coal is moved through a road or conveyor belt to the closest railway siding. FMC helps to create a cleaner and healthier environment by reducing the amount of trucks on the road and the negative environmental effects that come with them, such as air pollution, traffic jams, and road damage.

Next Story
Infrastructure Urban

Shoals' Q3 2024 revenue falls 23.9% due to project delays, supply chain

Shoals Technologies Group, a U.S.-headquartered manufacturer of electrical balance of systems (EBOS) for solar, energy storage, and e-mobility, reported a 23.9% year-over-year (YoY) decline in revenue, which dropped to $102.2 million in the third quarter (Q3) of 2024. This decline was mainly attributed to project delays and supply chain disruptions. The company posted a net loss of $300,000, a significant improvement compared to the $9.8 million net loss in Q3 2023. Adjusted net income was reported at $13.9 million, reflecting a 58.2% YoY decrease. Adjusted EBITDA stood at $24.5 million, a 4..

Next Story
Infrastructure Energy

FTC Solar sees 67% YoY decline in Q3 revenue from lower volumes

FTC Solar, a U.S.-based provider of solar tracker systems, reported a revenue of $10.14 million in the third quarter (Q3) of 2024, surpassing analyst expectations by $240,680. However, this figure marked a 66.8% year-over-year (YoY) decline compared to the same quarter in 2023, primarily attributed to reduced product volumes. The decline in solar tracker revenue was mainly due to an 82% decrease in the amount of MW produced, which was negatively impacted by delays in customer projects. This was partially offset by an increase in the average selling price (ASP), which led to better pricing an..

Next Story
Infrastructure Urban

Dilip Buildcon wins bid for BharatNet Phase III broadband project

Dilip Buildcon announced on Tuesday, November 12, that its STL-DBL consortium had submitted the lowest bid for BSNL's BharatNet Phase III broadband connectivity project. The USOF-funded project, which aims to provide middle and last-mile connectivity in Jammu Kashmir and Ladakh, is valued at Rs.1,625.36 Crore. Dilip Buildcon holds a 70.23% stake in the implementation of the project. The project is expected to be completed in three years, and the corporation will secure a 10-year maintenance contract. In recent days, BSNL has awarded several contracts for the BharatNet project. On Monday, No..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000