Bangladesh drops plans to build 10 coal plants amid rising fuel costs
COAL & MINING

Bangladesh drops plans to build 10 coal plants amid rising fuel costs

Bangladesh has dropped the plans to develop ten coal-fired power plants due to the increasing price of fuel and rising calls from activists to base more of the nation's energy on renewable power.

Nearly 8% of the current electrical power of the country comes from coal. However, till last year, Bangladesh had plans to increase that percentage by establishing at least 18 coal-fired plants.

Ten of those plants, which were not yet under development, have now been cancelled. Others continue in building or planning.

Mohammad Hossain, head of Power Cell, said when Bangladesh created an energy master plan in 2010, coal was affordable and the most suitable option after gas, but now declining prices for solar energy and slightly cheaper gas has changed the situation. He said, considering everything, they decided to be more renewable.

At present, more than half of the country's electricity comes from natural gas, although a few power plants operate on diesel and heavy fuel oil.

Around 3.5% of the power comes from renewable energy, which Bangladesh plans to increase to 40% by 2041.

For that change, the country is planning to start importing hydropower from neighbouring countries like Nepal and Bhutan.

Hossain said the shift to scrap the coal plants would not affect the current or future ability to produce energy.

Climate change activists say developing more coal power plants is incompatible with accomplishing the goals of the Paris Agreement to limit planetary heating and could put the low-lying nation at growing risk from the climate effects.

Under the 2015 Paris agreement, around 200 countries agreed to cut emissions to keep global temperature increases below 2 degrees celsius, but the planet has already warmed more than 1.2 degrees celsius.

However, climate activists praised the move and requested the Bangladesh government to add mainly renewables to its future energy mix.

Syeda Rizwana Hasan, Chief Executive of the Bangladesh Environmental Lawyers Association, said this is a positive decision of the government and has made clear that receiving funds internationally for coal-based power plants has become difficult.

Image Source


Also read: Coal plant pollution can lead to 8,300 deaths in India

Also read: New coal-fired power plants in India economically unviable: IEEFA report

Bangladesh has dropped the plans to develop ten coal-fired power plants due to the increasing price of fuel and rising calls from activists to base more of the nation's energy on renewable power. Nearly 8% of the current electrical power of the country comes from coal. However, till last year, Bangladesh had plans to increase that percentage by establishing at least 18 coal-fired plants. Ten of those plants, which were not yet under development, have now been cancelled. Others continue in building or planning. Mohammad Hossain, head of Power Cell, said when Bangladesh created an energy master plan in 2010, coal was affordable and the most suitable option after gas, but now declining prices for solar energy and slightly cheaper gas has changed the situation. He said, considering everything, they decided to be more renewable. At present, more than half of the country's electricity comes from natural gas, although a few power plants operate on diesel and heavy fuel oil. Around 3.5% of the power comes from renewable energy, which Bangladesh plans to increase to 40% by 2041. For that change, the country is planning to start importing hydropower from neighbouring countries like Nepal and Bhutan. Hossain said the shift to scrap the coal plants would not affect the current or future ability to produce energy. Climate change activists say developing more coal power plants is incompatible with accomplishing the goals of the Paris Agreement to limit planetary heating and could put the low-lying nation at growing risk from the climate effects. Under the 2015 Paris agreement, around 200 countries agreed to cut emissions to keep global temperature increases below 2 degrees celsius, but the planet has already warmed more than 1.2 degrees celsius. However, climate activists praised the move and requested the Bangladesh government to add mainly renewables to its future energy mix. Syeda Rizwana Hasan, Chief Executive of the Bangladesh Environmental Lawyers Association, said this is a positive decision of the government and has made clear that receiving funds internationally for coal-based power plants has become difficult. Image Source Also read: Coal plant pollution can lead to 8,300 deaths in India Also read: New coal-fired power plants in India economically unviable: IEEFA report

Next Story
Resources

KEC International Wins New Orders worth Rs. 12.36 Billion

KEC International, a global infrastructure EPC major and an RPG Group Company, has secured new orders worth Rs. 12.36 billion (bn) across various sectors.Transmission & Distribution (T&D):KEC has secured transmission line and substation orders in the Middle East (UAE and Kuwait) and a substation order from a private TBCB player in India.Civil:A residential project order from a leading private developer in Western India strengthens KEC’s presence in the civil sector.Transportation:The company has also secured an order in the prestigious Train Collision Avoidance System (TCAS) segment ..

Next Story
Infrastructure Urban

Finance Minister to Launch NITI NCAER States Economic Forum Portal

Union Finance Minister Nirmala Sitharaman is set to launch the "NITI NCAER States Economic Forum" portal on 1st April 2025 in New Delhi. Developed collaboratively by NITI Aayog and the National Council of Applied Economic Research (NCAER), the portal will serve as a comprehensive repository of economic, social, and fiscal data spanning over 30 years (1990-91 to 2022-23). Key Features of the Portal The platform is structured into four main components: State Reports: Provides macro and fiscal overviews of 28 Indian states, featuring data on demography, economic structure, socio-economic indic..

Next Story
Infrastructure Energy

IREDA’s Loan Sanctions Surge 27% to Rs 474.53 Bn in FY 2024-25

The Indian Renewable Energy Development Agency Limited (IREDA) has reported a 27% increase in loan sanctions, reaching Rs 474.53 billion for FY 2024-25, as per provisional data. Loan disbursements also saw a 20% rise to Rs 301.68 billion, up from Rs 250.89 billion in the previous fiscal year. Additionally, the outstanding loan book expanded by 28%, standing at Rs 762.5 billion as of March 31, 2025, compared to Rs 596.98 billion in FY 2023-24. IREDA’s Commitment to Renewable Energy Growth Shri Pradip Kumar Das, Chairman & Managing Director, IREDA, emphasized the company’s commitment to t..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?