H.G. Infra Engineering has announced that the appointed date for its new project with South Central Railway is set for June 22, 2024. This follows a letter received from South Central Railway on June 18, 2024.
The project involves the doubling of the track between Karanjgaon station (Km 69.01) and Aurangabad station (Km 113.15), covering a distance of 44.14 km. It includes electrification and signalling works as part of the Aurangabad-Ankai Doubling Project in the Nanded Division of South Central Railway, to be executed on an Engineering, Procurement, and Construction (EPC) basis. (Source: Business Standard)