Finest Outdoor Space Solution
Read full article
CW Gold Benefits
- Weekly Industry Updates
- Industry Feature Stories
- Premium Newsletter Access
- Building Material Prices (weekly) + trends/analysis
- Best Stories from our sister publications - Indian Cement Review, Equipment India, Infrastructure Today
- Sector focused Research Reports
- Sector Wise Updates (infrastructure, cement, equipment & construction) + trend analysis
- Exclusive text & video interviews
- Digital Delivery
- Financial Data for publically listed companies + Analysis
- Preconceptual Projects in the pipeline PAN India

Mumbai Metro Lines Four and Four A Set For Trial Runs Soon
The Mumbai Metropolitan Region Development Authority (MMRDA) is preparing to launch trial runs on a key 10-kilometre stretch spanning ten stations from Cadbury to Gaimukh on Metro Lines Four and Four A. These stations include Cadbury, Majiwada, Kapurbawadi, Manpada, Tikuji Ni Wadi, Dongripada, Vijay Garden, Kasarvadavli, Gownipada, and Gaimukh.While the designated depot for Metro Lines Four and Four A is still under construction, the MMRDA has devised an interim plan involving inspection pits beyond the Gaimukh terminal to facilitate early testing.Metro Line Four, which stretches 32.32 kilomet..

Kerala Launches Rs 11 Billion Infrastructure Project for Palakkad
The Kerala government has launched the first phase of infrastructure development for the proposed Palakkad Smart City, part of the Kochi-Bengaluru Industrial Corridor. With an investment of Rs 11 billion, the project will transform over 1,400 acres in Puthussery Central and Kannambra into an Integrated Manufacturing Cluster.Tenders have been invited for works including internal roads, drainage, bridges, water supply, firefighting, wastewater recycling, sewage treatment, and power distribution. Bids will soon be called for an Integrated Command and Control Centre, landscaping, and other urban i..

Delhi Govt Initiates Rs Six Billion Road Project Along Najafgarh Drain
The Delhi government has initiated a Rs six billion road development project to improve connectivity and transform the area along the Najafgarh Drain, also known as the Sahibi river, into a green corridor. The plan involves constructing 60.77 kilometres of new roads, including a 5.94-kilometre two-lane road on the left bank from Jhatikra Bridge to Chhawla Bridge, and two-lane roads on both banks from Chhawla Bridge to Basaidarapur Bridge, covering 54.83 kilometres.The corridor will connect with key arterial roads such as the Inner Ring Road (Basai Darapur), Outer Ring Road (Keshavpur), Pankha ..