Small Project – BIG Solution for Dehradun Retired Couple
Products

Small Project – BIG Solution for Dehradun Retired Couple

By Suzan Chin-Taylor

In the southwest part of Dehradun, retired couple Mr. and Mrs. Mohan own a separated housing building with a large plot and generous portion of terrace space. Over the years, age of the structure and annual monsoon rains had impacted the home, primarily and extensively in the family’s downstairs dining room. The problems that come with interior damp walls and leakage were becoming a concern for the couple due to health reasons as well as the aesthetics. They began investigating new potential solutions for waterproofing, as prior applications of other popular and inexpensive products were not delivering the performance desired nor sealing off water ingress.

The Mohan’s learned of a new brand of waterproofing and heat resistant coatings, OBICCool by OBIC Solutions Pvt Ltd. Although unknown, the firm’s product was backed by an experienced team of IIT Bombay engineers, produced under the “Make in India” initiative and manufactured under stringent quality controls at an ISO 9000:2015 facility and this provided enough evidence and confidence to try this new product line.

The OBICCool product was somewhat more expensive than what they had used in the past, but they were anxious to see if it could truly deliver what it promised so they decided to have the coating applied in a 500 square foot potion of the roof where the water ingress into the dining room was coming from.

OBIC Solutions deployed its own application crews for the project. The area to be treated was first prepped and cleaned. The existing waterproofing material needed to be removed first and the surface made smooth. Once the surface was dry and ready for the next coat, white cement was mixed with this same OBICCool 100C material. The purpose of this is to fill any cracks and gaps in the substrate and completely seal the roof with the second coat. An initial coat of OBICCool 100C, a nano-enhanced absorption coat was applied to seal off any porous areas in the cement surface. These steps took 2 days and were performed by a crew of 3 members. The topcoats followed this process. The crew completed two topcoats in 6 hours. Normally, a four-layer system which uses a cement coat in between the absorption coat and the final topcoats is applied, however, due to budget constraints, OBIC Solutions was able to provide a solution using three coats along with the topcoats to successfully stop water ingress.


It has now been 9 months since the installation and even during heavy rains, the couple has reported that there is no water leakage, mold growth has not returned and the problem areas in the dining room are now fully dry and returned to a healthy, clean state.

For more information about OBIC Solutions high-tech, high-performance waterproofing products and installation, please visit obicsolutions.in or call +91 7078888215

By Suzan Chin-Taylor In the southwest part of Dehradun, retired couple Mr. and Mrs. Mohan own a separated housing building with a large plot and generous portion of terrace space. Over the years, age of the structure and annual monsoon rains had impacted the home, primarily and extensively in the family’s downstairs dining room. The problems that come with interior damp walls and leakage were becoming a concern for the couple due to health reasons as well as the aesthetics. They began investigating new potential solutions for waterproofing, as prior applications of other popular and inexpensive products were not delivering the performance desired nor sealing off water ingress. The Mohan’s learned of a new brand of waterproofing and heat resistant coatings, OBICCool by OBIC Solutions Pvt Ltd. Although unknown, the firm’s product was backed by an experienced team of IIT Bombay engineers, produced under the “Make in India” initiative and manufactured under stringent quality controls at an ISO 9000:2015 facility and this provided enough evidence and confidence to try this new product line. The OBICCool product was somewhat more expensive than what they had used in the past, but they were anxious to see if it could truly deliver what it promised so they decided to have the coating applied in a 500 square foot potion of the roof where the water ingress into the dining room was coming from. OBIC Solutions deployed its own application crews for the project. The area to be treated was first prepped and cleaned. The existing waterproofing material needed to be removed first and the surface made smooth. Once the surface was dry and ready for the next coat, white cement was mixed with this same OBICCool 100C material. The purpose of this is to fill any cracks and gaps in the substrate and completely seal the roof with the second coat. An initial coat of OBICCool 100C, a nano-enhanced absorption coat was applied to seal off any porous areas in the cement surface. These steps took 2 days and were performed by a crew of 3 members. The topcoats followed this process. The crew completed two topcoats in 6 hours. Normally, a four-layer system which uses a cement coat in between the absorption coat and the final topcoats is applied, however, due to budget constraints, OBIC Solutions was able to provide a solution using three coats along with the topcoats to successfully stop water ingress.It has now been 9 months since the installation and even during heavy rains, the couple has reported that there is no water leakage, mold growth has not returned and the problem areas in the dining room are now fully dry and returned to a healthy, clean state. For more information about OBIC Solutions high-tech, high-performance waterproofing products and installation, please visit obicsolutions.in or call +91 7078888215

Next Story
Infrastructure Energy

REC Transfers HVDC Project to Power Grid

REC Limited has successfully handed over the Special Purpose Vehicle (SPV) for a High-Voltage Direct Current (HVDC) transmission project to Power Grid Corporation of India Limited (PGCIL). This strategic move aligns with the nation's objectives to strengthen its power transmission network. Key Highlights: Project Overview: The HVDC project, under the inter-state transmission system (ISTS) initiative, is a critical component of India's push toward robust and efficient electricity transmission. It aims to handle bulk power transfer across long distances while ensuring minimal losses. Role of RE..

Next Story
Infrastructure Transport

NF Railway Collaborates with IIT Guwahati

The Northeast Frontier (NF) Railway has signed strategic Memorandums of Understanding (MoUs) with IIT Guwahati to foster technological advancements and improve railway operations in the region. This partnership focuses on innovative solutions to enhance safety, efficiency, and sustainability in rail infrastructure. Key Highlights: Purpose of MoUs: The collaboration aims to leverage IIT Guwahati's expertise in technology and research for implementing cutting-edge solutions across railway operations. Key areas of focus include: Automation and digitization in maintenance. Sustainability initiati..

Next Story
Infrastructure Transport

Danapur Division Modernization Plans Revealed

The Railway Board has unveiled ambitious plans for the expansion and modernization of the Danapur Division, a critical hub under the East Central Railway. The initiative focuses on infrastructure development, enhanced passenger amenities, and operational efficiency. Key Highlights: Scope of Modernization: The Railway Board's blueprint emphasizes: Upgrading existing infrastructure to accommodate more passenger and freight traffic. Improving station facilities, such as platforms, waiting areas, and connectivity. Introducing advanced signal systems for safer and smoother operations. Freig..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000