Kolkata Metro Replaces Steel Third Rail with Aluminium for Energy Efficiency

The Kolkata Metro has successfully replaced the steel third rail with an aluminium counterpart at the Girish Park siding along the Dakshineswar-New Garia corridor. This third rail powers Metro trains, and the switch to aluminium promises a significant improvement in energy efficiency.

In a statement on Sunday, Metro Railway announced the completion of a 200-meter rail replacement on Saturday night. The new aluminium third rail is expected to reduce system voltage drops, resulting in less energy loss and faster train acceleration.

Metro Railway has set a two-year timeline for the full replacement of third rails, targeting an 84% reduction in energy loss—saving Rs one crore per year for each kilometer of track.

Related Stories

Kolkata Metro: Aluminum Third Rail replaces steel at Maidan Siding
Kolkata Metro Replaces Steel Third Rail with Aluminium for Energy Efficiency
Kolkata Metro installs solar power plants at various stations
Gadkari issues warning to contractors over poor road maintenance
SC halts bulldozer demolitions nationwide until Oct 1