J Kumar Infraprojects launches steel girder for Pink Line-6

J Kumar Infraprojects launched a 48 m special steel girder for the 15.18 km Mumbai Metro Line-6, Pink Line project. This metro line will connect Swami Samarth Nagar to Vikhroli through 13 elevated stations.

The steel girder over Line-2A’s viaduct on Link Road has been installed near Infinity Mall for Package BC-03 of the project. Delhi Metro Rail Corporation (DMRC) awarded this contract worth Rs 8,67.75 crore to J Kumar – China Railway No. 3 Engineering Group (CRTG) joint venture (JV) back in August 2018.

The project work includes the construction of a 6.079 km viaduct from chainage of 822.508 m to 5,257.400 m and five stations at Swami Samarth Nagar in Lokhandwala, Adarsh Nagar, Jogeshwari, Jogeshwari–Vikhroli Link Road (JVLR) and Shyam Nagar.

The bids for Line-6 systems, including rolling stock, signalling, telecom, etc., have not yet been invited.

Image Source

Also read: J Kumar Infraprojects bags new orders worth Rs 2,215 cr

Related Stories

J Kumar Infraprojects Wins Rs 6.32 Billion Contract to Develop DTC Colony
Mumbai Metro Line 2B contractor fined Rs 1.5 crore for slow work
J.Kumar Infra rises on securing LoA for road project in Thane
Telangana Eyes Rail Boost for $1 Trillion Goal
Thane Reviews Road Projects Amid Key Challenges