Delhi Metro Hits Record Height at Haiderpur

The Delhi Metro has set a new height record with the construction of its highest-ever point near Haiderpur Badli Mor, surpassing the Pink Line’s previous 23.6m mark at Dhaula Kuan.

“A 490-metre stretch on the Phase-IV Magenta Line Extension has been built at a height of 28.362 metres,” said the Delhi Metro Rail Corporation (DMRC).

Construction was carried out in phases with alternative support systems due to space constraints. The second-highest elevated section, a 52.28-metre steel span at 27.61 metres, was also completed.

To avoid disruptions, work was conducted during non-operational hours at night.

"This ensured that regular passenger services remained unaffected," said DMRC’s Principal Executive Director Anuj Dayal.

Related Stories

DMRC Invites Tenders for Inderlok–Indraprastha Corridor Civil Works
Delhi Metro Completes Deepest Tunnel in Phase 4
TBM-3 Breaks Through at IGNOU Station on Golden Line
Madhya Pradesh Champions Inclusive Tourism at Heritage Sites
Runwal Realty Onboards Sonam Kapoor as Brand Ambassador