Karnataka Accelerates Plans for Bengaluru’s Second Airport
Surging Air Traffic Drives Urgency With Bengaluru witnessing a continuous rise in air traffic, the government is keen to fast-track the project. Speaking to reporters, MB Patil emphasised the need for a second airport to accommodate growing passenger numbers and commercial demands.
“A multidisciplinary team from AAI will conduct a feasibility study from April 7 to April 9. The government has already allocated Rs 121 million for this assessment. With the 150-km airport restriction set to expire by 2033, we are accelerating the process,” he stated.
Proposed Locations for the New Airport The state has shortlisted three potential sites:
Two locations along Kanakapura Road, spanning 4,800 and 5,000 acres One site on the Nelamangala-Kunigal Road, covering 5,200 acres The Karnataka government has assured the Centre that it is prepared to allocate a minimum of 4,500 acres for the project at any of these sites. With the AAI feasibility study underway, Bengaluru moves one step closer to securing a second airport, poised to enhance connectivity and boost economic growth in the region.