POWERGRID Wins Bid for Inter-State Transmission Project Under TBCB

Power Grid Corporation of India Limited (POWERGRID) has been declared the successful bidder under Tariff-Based Competitive Bidding (TBCB) for the Inter-State Transmission System (ISTS) project aimed at evacuating power from Mahan Energen Limited's generating station in Madhya Pradesh.

The project, awarded on a Build, Own, Operate, and Transfer (BOOT) basis, includes the construction of a 400kV D/C transmission line and associated bays at the Rewa Power Station (PG) substation in Madhya Pradesh.

POWERGRID received the Letter of Intent (LoI) on April 1, 2025, confirming its selection for the project, further strengthening its position as a leader in India’s power transmission sector.

(BSE)
         

Related Stories

POWERGRID Wins 4.5 GW Renewable Energy Transmission Project
POWERGRID Secures Rs 107.5 Billion Green Energy Transmission Projects
POWERGRID Invites 7 MW Rooftop Solar Systems Bids Under PM Surya Ghar
News & Events
Volvo CE Delivers High-Reach Demolition Excavator to United Saw Services