Coal Ministry reports 33% rise in production post review of 127 blocks
The 64 producing blocks achieved a production of 100.08 million tonnes (MT) as of November 8, 2024, reflecting a 33.35% year-on-year increase. Dispatches also rose by 34.38%, reaching 107.81 MT.
Discussions focused on First Mile Connectivity, production optimisation, and improved transportation infrastructure. Brar urged state officials and allottees to expedite operationalising pending blocks, underscoring their role in ensuring energy security.
Currently, 55 blocks are operational, with one new block starting production this year and nine more expected to follow by the fiscal year's end. These efforts align with India's goal of energy self-reliance and becoming a developed nation by 2047. (ET)