Tekla helps BDA offer more carpet area


Global construction technology leader Trimble’s (NASDAQ: TRMB) flagship construction software, Tekla Structures, has delivered 10 per cent extra carpet area with the same budget for a large-scale housing project by Bhubaneswar Development Authority (BDA) at Ghatakia and Subudhipur.

BDA had awarded Inventaa Industries with the construction of this affordable housing project, which involved construction of 1,320 individual apartments spread over 33 blocks of five-storied apartment complex. Inventaa chose Tekla Structures as Building Information Modelling (BIM) software for developing high-quality and low cost precast concrete structures for this project, which were instrumental in keeping the construction costs low. 

Precast concrete is one of the latest construction technology that is increasingly becoming popular for new building projects for speed and superior quality of construction along with reduced project delivery time, lesser manpower and lifecycle costs. With the outbreak of COVID-19 pandemic, more builders, developers and contractors are turning towards precast concrete structures,” says Paul Wallett, Regional Director, Middle East and India, Trimble Solutions. “As the leading construction technology solution provider, we are delighted to support Inventaa Industries for the construction of this large-scale mass housing project in Bhubaneshwar.”

Also read:
Paul Wallett’s interview with CW on Constructible BIM and more 
Construction Technologies Post Covid-19 

The software enabled Inventaa to control the project in a centralised manner right from efficient design to planning, monitoring and improving upon the execution of the project on-site. Inventa’s in-house design team relied on Tekla to design the buildings suitable for precast concrete construction. With this value-engineering, Inventaa was able to provide an extra 10 per cent carpet area within the same budget. Inventaa Industries is one of the leading precast manufacturers in India with three precast plants in Telangana, Andhra Pradesh and Odisha having a combined building construction capacity of 6 million sq ft area per year. 

Satyanarayana C, Managing Director, Inventaa Industries, said, “This project was completely handled in-house including the development of the architectural concept, structural engineering/design, production of the precast elements, installation of precast elements with all the requisite structural work at the site, and finally the installation of services (MEP) and architectural finishing. Tekla support team held our hand through all of these phases which would have otherwise been very difficult to manage by using a dozen different applications.”

For Inventaa, Tekla was the definitive choice to successfully deliver this massive project that came with a multitude of challenges. A highly compact land space designated for the construction of this mass housing project was perhaps the biggest challenge. A tight project schedule with unique and challenging design requirements proved to be two additional constraints for Inventaa, which demanded highly reliable and accurate 3D modelling tools enabled by Tekla. 

The use of Tekla Structures for the BDA mass housing project delivered several benefits to Inventaa, including highly accurate and reliable 3D engineering design modeling, one-stop project scheduling and monitoring, seamless real-time cloud-based collaboration and rationalisation of manpower and associated costs.

Related Stories

Construction technology is the flavour of the season

Janak Vakharia, CEO of Xpedeon, speaks about the company’s plans to CW.

Trimble Announces Aarbee Structures as The Feature Company of the M..

Trimble Honors Aarbee Structures as November's Feature Company of the Month!

Gati Shakti Digital Twin Unveiled

Tech to aid greenfield, brownfield projects.