COVID-19: Construction equipment demand to falter further
The Indian construction equipment (CE) industry is facing numerous headwinds as a result of the economic slowdown and other factors impacting the construction activity. As a result, the construction equipment industry witnessed a significant volume de-growth of ~16 per cent in CY2019; volumes de-grew by ~22-24 per cent in FY2020. The situation has been further exacerbated due to the COVID-19 outbreak and the nationwide lockdown. The industry is expected to de-grow by 15-20 per cent during CY2020. These were the conclusions of ICRA’s nationwide survey of construction equipment dealers across 12 states in the country, covering Andhra Pradesh, Bihar, Jammu and Kashmir, Punjab, Haryana, Himachal Pradesh, Uttarakhand, Telangana, Karnataka, Kerala, Madhya Pradesh and Rajasthan. The extensive survey was conducted through the month of April 2020.
Also read: Construction equipment: 40% increase in sales in December 2019
Giving more insights on the industry scenario, Pavethra Ponniah, Vice President and Sector Head, ICRA, says, “Apart from the impact of the lockdown during March to May 2020, COVID-19 has crippled several industries and eroded livelihoods. Weakness in government revenues streams, more so at the states; redirected government support to healthcare, possibly at the cost of all other capital spends; the need for structural changes incorporating social distancing in several industries like construction; movement of labour and material; and the cost of restarting the economy – all these thwart the ability to make forecasts for sectors intrinsically linked to the underlying economy. Unforeseen headwinds will be many in the coming months.”
As per ICRA’s findings of the dealers’ survey,
As for the outlook going forward, adds Ponniah, “Belying hopes of a recovery in construction equipment demand supported by stepped up infrastructure spend, the COVID-19 pandemic has led to significant global retrenchment in economic activity during the current year. Demand will remain dependent on the pandemic being contained, trend in funds flow from the government, pace of project awards and availability of transportation (for raw materials) and labour at project sites.”
Related Stories
Maharashtra cabinet approves cost hike for Pune ring road project
It will have an EPC model, which may result in adjustments to the base levels and length.
Page {{currentPage}} of {{pageCount}}
{{copy}}