NHAI gives Dilip Buildcon order for HAM project in AP worth Rs 7.80 bn


The National Highways Authority of India (NHAI) sent Dilip Buildcon Limited a letter of acceptance (LOA) for the hybrid annuity model (HAM) project on March 31, 2023, according to an exchange filing. The 2015 Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Rules' provisions are followed by the disclosure.

Construction of a six-lane, access-controlled greenfield highway on the NH544G between Audireddipalle (Ch. 160+000) and Mallapalle (Ch. 176+000) for Rs 7.80 billion, the Bengaluru- Vijayawada Economic Corridor on HAM Mode is being built as part of Andhra Pradesh's Bharatmala Pariyojana Phase-I (Package-07).

Related Stories

Dilip Buildcon executes EPC contract with RVNL

The project is for construction of tunnels, bridges, formation works

DBL emerges lowest bidder for Raipur-Vizag Expressway’s package CG-2

Package CG-2 to connect Sargi-Basanwahi roads in Chhattisgarh

Dilip Buildcon Limited bags Rs 2,683.02 cr equipment order from SECL

Dilip Buildcon Limited obtains LoA for Rs 2,683 crore order from SECL