Mumbai-Ahmedabad Bullet Train Project Advances with Tunnel Completion


The Mumbai-Ahmedabad high-speed rail corridor is set to revolutionise travel between the two cities, reducing the journey time to just 2.5 hours while fostering economic integration and urban development along the route. 

A significant milestone in the project was achieved with the completion of the 394-meter-long ADIT tunnel, which will facilitate construction access and serve as an emergency evacuation route. The tunnel reflects the project's strong focus on safety and operational efficiency. 

Union Minister Ashwini Vaishnaw highlighted the project's steady progress, noting the ongoing construction of bridges across rivers along the corridor. "The works of the bullet train project between Mumbai and Ahmedabad are progressing at a high pace," he stated. 

Vaishnaw emphasised the transformative impact of the high-speed corridor, describing it as a driver of economic growth and urban development. "The bullet train project is rapidly integrating the economy of cities along the corridor, enhancing connectivity and reducing travel time to just 2.5 hours," he remarked. 

The minister added, "This project will accelerate urban development in areas adjoining the corridor, setting a new pace for regional growth." 

As a pioneering infrastructure initiative, the Mumbai-Ahmedabad bullet train project represents a major leap forward for India's transportation landscape, showcasing the country's technological and economic aspirations. 

(New Indian Express)           

Related Stories

Mumbai-Ahmedabad bullet train: Tunnel in Mumbai speeds work

The intermediate tunnel is designed to provide direct vehicular access.

76,000+ segments to be cast for 16 km Bullet Train tunnel

High-strength M70 grade concrete is being used to ensure superior structural integrity and long-term durability.

Mumbai-Ahmedabad bullet train electrification contract signed

NHSRCL takes major leap with corridor electrification contract.