H.G. Infra to start South Central Railway project from June 22


H.G. Infra Engineering has announced that the appointed date for its new project with South Central Railway is set for June 22, 2024. This follows a letter received from South Central Railway on June 18, 2024.

The project involves the doubling of the track between Karanjgaon station (Km 69.01) and Aurangabad station (Km 113.15), covering a distance of 44.14 km. It includes electrification and signalling works as part of the Aurangabad-Ankai Doubling Project in the Nanded Division of South Central Railway, to be executed on an Engineering, Procurement, and Construction (EPC) basis. (Source: Business Standard)

Related Stories

Kazipet Begins South India's First Rail-Under-Rail Tunnel

340-meter Tunnel to Ease Chennai-New Delhi Travel

South Central Railway Seeks Bids for 2.7 MW Rooftop Solar Systems

South Central Railway invites bids for 2.7 MW rooftop solar systems to boost renewable energy use.

Rail Vikas Nigam gets LoA for Rs 4.4 billion project

The scope of work includes not only the doubling of the track but also encompasses vital aspects.