Chennai: First Phase of Waste Collection Begins In 7 Zones
Mayor R Priya flagged off 59 vehicles as part of the first phase of an intensive cleaning drive to remove construction debris in seven zones. The debris will be collected in the designated areas within each zone and transported to the large waste disposal facilities in Perungudi and Kodungaiyur. Since illegal dumping of construction and demolition (C-D) waste has been spotted in public places within the Corporation limit, the civic body has identified 15 places to ensure the debris waste has been dumped in the designated place. In the first phase, debris waste will be removed in 7 zones – Tondiarpet (Zone 4), Royapuram (Zone 5), Thiru Vi Ka Nagar (Zone 6), Anna Nagar (Zone 8), Teynampet (Zone 9), Kodambakkam (Zone 10) and Adyar (Zone 13). The cleaning work in the seven zones is expected to be completed in two weeks. After that, the civic body will start the second phase of work in 8 zones – Tiruvottiyur (Zone 1), Manali (Zone 2), Madhavaram (Zone 3), Ambattur (Zone 7), Valasaravakkam (Zone 11), Alandur (Zone 12), Perungudi and Shollinganallur (Zones 14 and 15). The Corporation carries out solid waste management operations across the city including bus route roads, parks, playgrounds, and burial grounds.
Related Stories
Cleanliness Control Centre to Monitor Work, Complaints 24X7
The centre will now operate round-the-clock to improve cleanliness management
BHU launches door-to-door garbage collection drive
The initiative aims to efficiently manage solid waste across all residential areas.
Gurgaon MCG Asks Locals to Oversee Waste Collection in Seven Wards
MCG urges Gurgaon residents to monitor waste collection in seven wards to boost efficiency.
Page {{currentPage}} of {{pageCount}}
{{#products}}
{{title}}
{{/products}}
{{copy}}